Progress
The Indian Air Force, under the Department of Military Affairs, invites bids for Stationary Valve Regulated Lead Acid Batteries (V3) conforming to IS 15549 (Q3). The procurement scope references VRLA batteries, with the IS 15549 Q3 standard as a core compliance requirement. The buyer reserves the right to adjust quantities by up to 25% at contract award and during the contract currency, at contracted rates. Delivery terms hinge on the last date of the original delivery order, with potential extended time based on the option clause, ensuring a minimum 30 days extension when applicable. This procurement emphasizes strict adherence to IS 15549 and the specified option clause during bid evaluation.
Product: Stationary Valve Regulated Lead Acid Batteries (V3)
Standard: IS 15549 (Q3)
Category: VRLA batteries for stationary use
No quantitative BOQ items specified; quantity flexibility up to 25%
25% quantity variation allowed during award and currency
Delivery period computed with minimum 30 days extension where applicable
Review of Buyer Uploaded ATC document for specific terms and conditions
Not specified in provided data; verify ATC for exact payment schedule and acceptance terms
Delivery period begins from the last date of original delivery order; extended time follows (Increased quantity ÷ Original quantity) × Original delivery period with minimum 30 days
No LD or penalty details visible in data; consult ATC for potential LD provisions
Demonstrated experience in supplying VRLA batteries or equivalent stationary power storage
Valid GST registration and PAN
Evidence of financial capacity to support procurement and post-delivery service
Compliance with IS 15549 (Q3) or equivalent certification if specified in ATC
Quantity
12
Category
Stationary Valve Regulated Lead Acid Batteries (V3) Conforming To IS 15549
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Item wise evaluation
Inspection Required
No
RA Qualification Rule
H1-Highest Priced Bid Elimination
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
Yes
Bid Splitting Applied
No
Past Performance
50 %
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Stationary Valve Regulated Lead Acid Batteries (V3) Conforming To IS 15549 (Q3)
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
SOUTH WEST DELHI
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | SOUTH WEST DELHI | SOUTH WEST DELHI | - | - | 1 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar VRLA battery supply
Financial statements demonstrating bidder stability
Any EMD/Security deposit documentation as per ATC
Technical compliance certificates showing IS 15549 (Q3) conformity
OEM authorizations or dealership certificates if OEM-specific
Technical bid documents referenced in ATC (as required)
Key insights about DELHI tender market
Bidders must submit IS 15549 (Q3) compliant stationary VRLA battery bids, review the ATC, and prepare documents like GST, PAN, financials, and OEM authorizations. Ensure quantity flexibility up to 25%, and confirm delivery timelines from the last delivery order date with the 30-day minimum extension rule.
Required documents include GST certificate, PAN, experience certificates for VRLA or similar batteries, financial statements, EMD documentation per ATC, IS 15549 conformity certificates, OEM authorizations, and technical bid documents referenced in the ATC.
Bidders must provide products conforming to IS 15549 (Q3) for stationary VRLA batteries, with IS 15549 compliance clearly demonstrated in technical bid submissions and OEM documentation where applicable.
Delivery is measured from the last date of the original delivery order. If quantities increase, the extended period equals (Increased quantity ÷ Original quantity) × Original delivery period, with a mandatory minimum extension of 30 days.
Yes. The Purchaser reserves the right to increase or decrease the bid quantity by up to 25% of the bid quantity at contract placement and during the contract at contracted rates.
Bidders must view the Buyer Uploaded ATC document to capture purchaser-specific terms, conditions, delivery allowances, and any warranty or penalty provisions that are not disclosed in the base tender data.
IS 15549 (Q3) is the mandatory standard for stationary VRLA batteries in this procurement. Suppliers must demonstrate compliance through certificates, lab tests, or OEM documentation and ensure product datasheets reflect Q3 criteria.
Penalty details are not provided in the available data. Bidders should rely on the ATC and contract terms to identify liquidated damages, late delivery penalties, and possible remedies for delays.