Bid Publish Date
26-Sep-2026, 12:48 pm
Bid End Date
05-Oct-2026, 3:00 pm
Location
Progress
Gail India Limited invites bids for Fills for Paharpur Cooling Towers at Auraiya, Uttar Pradesh 206121. The tender document indicates a flexible quantity clause with up to 25% quantity variation, start/end dates not disclosed, and an ATC-driven process. With no BOQ items listed, bidders must rely on embedded terms and the attached tender documents for scope interpretation and delivery expectations. This procurement emphasizes compatibility with Paharpur cooling tower fills and potential supplier collaboration under the buyback/extension framework. The unique clause on option-based quantity adjustments and posture on delivery timelines serves as the key differentiator in this tender.
Product/service name: Fills for cooling towers (Paharpur design) with unspecified dimensions
Estimated value: Not specified; BOQ shows 0 items
Documentation: ATC attachments contain exact technical specs
Experience: Not specified in data; refer to ATC requirements
Delivery: 25% quantity variation allowed; timeline per option clause
Option clause allows ±25% quantity adjustment at contract and during currency
Delivery period calculated from last delivery order date with minimum 30 days
ATC documents govern detailed technical specifications and submission formats
Payment terms to be as per tender documents and ATC attachments
Delivery time extends based on quantity variation; minimum 30 days between dates
LD terms to be defined in tender documents; ATC will specify penalties
Bidders must review and comply with ATC forms and formats
Experience in supplying cooling tower components is advantageous
GST registration and financial stability documentation likely required
Quantity
650
Bid Type
Single Packet Bid
Bid Validity
90 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
3 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
No
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
FILLS FOR PAHARPUR MAKE COOLING TOWERS
Payment Timelines
Payments shall be made to the Seller within 15 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
90
Delivery Locations
1
Delivery Cities
Auraiya
Delivery Pincodes
206241
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Sushil Kumar Chaturvedi | 206241,GAIL (INDIA) LTD. PETROCHEMICAL COMPLEX P.O PATA | Auraiya | Uttar Pradesh | 206241 | 650 | 90 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar cooling tower components
Financial statements or turnover evidence
EMD/Security deposit documentation as per tender
Technical bid documents and compliance certificates
OEM authorizations (if applicable)
Key insights about UTTAR PRADESH tender market
Bidders must access the ATC document linked with the tender, complete all forms, and ensure submission of GST, PAN, experience certificates, and EMD as per tender terms. Review delivery option clauses (±25% quantity) and ensure alignment with Paharpur tower fill specifications in the ATC attachments.
Required documents typically include GST registration, PAN card, company financial statements, experience certificates for similar cooling tower components, EMD, technical compliance certificates, and OEM authorizations if applicable. ATC attachments specify any additional forms and file formats.
Technical specs are detailed in the ATC tender documents attached to the procurement notice. Bidders should verify compatible fill type with Paharpur cooling towers, including any required dimensions, packing density, and material standards once the ATC is reviewed.
Delivery timelines are governed by the option clause; initial delivery period is based on a date from the last delivery order, with a minimum 30 days extension if quantity increases. Exact dates are defined in the contract and ATC attachments.
EMD details are not provided in the public data; bidders must refer to the tender documents and ATC to confirm the exact EMD amount and submission method (DD/online) as per the notice.
Specific standards are listed in the ATC attachments; common expectations include ISI/BIS or IS 550 alignment and OEM certifications if applicable. Verify exact compliance requirements in the tender ATC document before submission.
Eligibility typically requires demonstrated experience in supplying cooling tower components, financial stability, and compliance with GST/PAN and ATC forms. Review the ATC for any mandatory clauses on turnover, past performance, and technical capability.
Prepare the technical bid per ATC formats, attach OEM authorizations if needed, and ensure conformity with required documents such as GST, PAN, and experience certificates. Submission occurs through the tender portal or designated channel as specified in the ATC attachment.