Bid Publish Date
14-Sep-2026, 7:47 pm
Bid End Date
24-Sep-2026, 4:00 pm
Value
₹6,00,000
Location
Progress
Organization: Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited (uprvunl), Lucknow. Product/Service: Feasibility study for connecting BCHP from CCHP and vice versa within a Power House/O&M framework. Location: Sonbhadra, Uttar Pradesh 231205. Estimated value: ₹6,00,000. No BOQ items are listed, signaling a high-level feasibility assessment rather than a full turnkey. The tender references Buyer Added ATC terms and an uploaded ATC document, indicating additional contract conditions beyond standard procurement. This tender targets technical feasibility analysis, interconnection considerations, and grid integration implications for BCHP-CCHP linkage.
Product/Service: Feasibility study for BCHP-CCHP interconnection
Estimated value: ₹6,00,000
Location: Sonbhadra, Uttar Pradesh
No public BOQ items; ATC-based terms apply
No explicit technical standards in tender data; rely on ATC document
ATC terms are provided by the buyer and must be complied with
Delivery timeline and detailed payment terms to be clarified in ATC
EMD amount not disclosed in initial data; confirm via ATC
Buyer Added Bid Specific ATC terms apply; an ATC document is uploaded and must be reviewed by bidders.
Feasibility study deliverables to be defined in ATC; bidder must align reporting milestones with organizational requirements.
Not disclosed in available data; to be provided in ATC; expect milestone-based or lump-sum upon report acceptance.
Experience in performing feasibility studies for power or energy projects
Compliance with Uttar Pradesh government procurement norms
Ability to submit GST, PAN, and financial documents with bid
Quantity
1
Bid Type
Single Packet Bid
Bid Validity
60 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Tech Clarification Time
3 Days
EMD Required
No
MII Compliance
Yes
MSE Purchase Preference
No
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Min. Avg. Annual Turnover
6
Arbitration Clause
No
Mediation Clause
No
Tender Category
Service
Bid To RA
No
Bid To RA Enabled
No
Item Category
Operation and Maintenance Power House / Power Plant - Feasibility study to connect BCHP from CCHP and vice versa
Payment Timelines
Payments shall be made to the Seller within 30 days of issue of service delivery acceptance certificate (SDAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Delivery Locations
1
Delivery Cities
Sonbhadra
Delivery Pincodes
231219
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Rajesh Kumar | 231219,Obra Thermal Power Plant | Sonbhadra | Uttar Pradesh | 231219 | 1 | - | Number of months for which Operations & Maintenance service is required during contract period : 1 |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
GEM_GENERAL_TERMS_AND_CONDITIONS
GST registration certificate
Permanent Account Number (PAN)
Experience certificates for similar feasibility studies
Financial statements or Bank solvency proof
EMD submission as per ATC (if specified in ATC file)
Technical bid documentation demonstrating methodology
OEM authorizations or partnerships (if applicable to study scope)
Key insights about UTTAR PRADESH tender market
Bidders should review the ATC document uploaded by the buyer, prepare documents per the terms (GST, PAN, financials, experience certs), and submit a methodology for BCHP-CCHP interconnection feasibility. The bid will rely on the ATC terms and the ₹6,00,000 estimated value; ensure compliance with UP procurement norms.
Submit GST certificate, PAN, relevant experience certificates for similar studies, financial statements, and any required EMD per ATC. Include technical bid detailing study approach, data sources, and deliverables for BCHP-CCHP connectivity feasibility.
No explicit standards are listed in the public data; bidders should reference ATC terms and align methodology with common power project feasibility practices and UP government procurement guidelines as specified in the uploaded ATC.
Deadline details are not disclosed in the public snippet and must be confirmed via the ATC document uploaded by the buyer. Expect a standard government tender deadline after ATC release.
The EMD amount is not disclosed in the available data; bidders should verify in the ATC file. Prepare to submit EMD as per ATC guidelines to avoid disqualification.
Ensure eligibility by providing GST, PAN, experience in related feasibility studies, and financial stability documents. Review ATC for any additional prerequisites and submit a robust methodology demonstrating BCHP-CCHP understanding.
Deliverables typically include a methodology, data collection plan, interconnection assumptions, risk assessment, cost-benefit analysis, and a final report. Align deliverables with ATC requirements and include clear milestones for Sonbhadra BCHP-CCHP integration.
The ATC document is uploaded by the buyer in the tender portal. Review the ATC for conditions, EMD specifics, payment terms, and any unique clauses governing the BCHP-CCHP feasibility study in Sonbhadra.