Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited O&M Power House Feasibility Study BCHP-CCHP Connection Sonbhadra UP 2026

Bid Publish Date

14-Sep-2026, 7:47 pm

Bid End Date

24-Sep-2026, 4:00 pm

Value

₹6,00,000

Progress

Issue14-Sep-2026, 7:47 pm
AwardPending

Tender Overview

Organization: Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited (uprvunl), Lucknow. Product/Service: Feasibility study for connecting BCHP from CCHP and vice versa within a Power House/O&M framework. Location: Sonbhadra, Uttar Pradesh 231205. Estimated value: ₹6,00,000. No BOQ items are listed, signaling a high-level feasibility assessment rather than a full turnkey. The tender references Buyer Added ATC terms and an uploaded ATC document, indicating additional contract conditions beyond standard procurement. This tender targets technical feasibility analysis, interconnection considerations, and grid integration implications for BCHP-CCHP linkage.

  • Scope focuses on feasibility methodology, data collection, and reporting deliverables rather than on-site construction.
  • Unique aspect: reliance on internal ATC terms; potential alignment with state energy department objectives and ongoing power-house optimization.

Technical Specifications & Requirements

  • No explicit technical specifications or performance criteria are provided in the public data.
  • Given the nature of a feasibility study, expected elements may include: project scoping, baseline data collection, interconnection requirements, thermal and electrical coupling considerations between BCHP and CCHP, risk assessment, and preliminary cost-benefit evaluation.
  • The tender notes an ATC document; bidders should anticipate organization-specific compliance considerations and any referencing standards within that file.
  • Organization expects a deliverable-focused study with a defined methodology, timelines, and final report.

Terms, Conditions & Eligibility

  • Estimated value: ₹6,00,000.
  • EMD amount: Not disclosed in available data.
  • ATC terms: Buyer Added ATC; ATC document uploaded.
  • Delivery expectations: Not specified; typical feasibility studies require a defined reporting timeline in the ATC.
  • Documents: Rely on ATC file for bidder obligations; GST, PAN, and financials likely required per standard UP government tenders.
  • Eligibility: Standard government bidder eligibility implied; refer to ATC for any unique prerequisites.
  • Warranty/Support: Not specified in the available data; feasibility deliverables-focused.
  • Payment terms: Not specified; align with governing policies and ATC directives.

Key Specifications

  • Product/Service: Feasibility study for BCHP-CCHP interconnection

  • Estimated value: ₹6,00,000

  • Location: Sonbhadra, Uttar Pradesh

  • No public BOQ items; ATC-based terms apply

  • No explicit technical standards in tender data; rely on ATC document

Terms & Conditions

  • ATC terms are provided by the buyer and must be complied with

  • Delivery timeline and detailed payment terms to be clarified in ATC

  • EMD amount not disclosed in initial data; confirm via ATC

Important Clauses

ATC Terms

Buyer Added Bid Specific ATC terms apply; an ATC document is uploaded and must be reviewed by bidders.

Delivery Schedule

Feasibility study deliverables to be defined in ATC; bidder must align reporting milestones with organizational requirements.

Payment Terms

Not disclosed in available data; to be provided in ATC; expect milestone-based or lump-sum upon report acceptance.

Bidder Eligibility

  • Experience in performing feasibility studies for power or energy projects

  • Compliance with Uttar Pradesh government procurement norms

  • Ability to submit GST, PAN, and financial documents with bid

Advertisement

Authority & Contact

Organization

Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited (uprvunl) Lucknow

Office Name

Lucknow

Grievance Contact

[email protected]

Tender Data

Bid Details

Quantity

1

Bid Type

Single Packet Bid

Bid Validity

60 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Tech Clarification Time

3 Days

Preference & Exemptions

EMD Required

No

MII Compliance

Yes

MSE Purchase Preference

No

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

6

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Service

Bid To RA

No

Bid To RA Enabled

No

Item Category

Operation and Maintenance Power House / Power Plant - Feasibility study to connect BCHP from CCHP and vice versa

Payment Timelines

Payments shall be made to the Seller within 30 days of issue of service delivery acceptance certificate (SDAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Delivery Locations

1

Delivery Cities

Sonbhadra

Delivery Pincodes

231219

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Rajesh Kumar231219,Obra Thermal Power PlantSonbhadraUttar Pradesh2312191-Number of months for which Operations & Maintenance service is required during contract period : 1

Authority Records

ENERGY DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 7

GeM-Bidding-9892359.pdf

Main Document

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Categories 28

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN)

3

Experience certificates for similar feasibility studies

4

Financial statements or Bank solvency proof

5

EMD submission as per ATC (if specified in ATC file)

6

Technical bid documentation demonstrating methodology

7

OEM authorizations or partnerships (if applicable to study scope)

Frequently Asked Questions

Key insights about UTTAR PRADESH tender market

How to bid for a feasibility study tender in Sonbhadra UP?

Bidders should review the ATC document uploaded by the buyer, prepare documents per the terms (GST, PAN, financials, experience certs), and submit a methodology for BCHP-CCHP interconnection feasibility. The bid will rely on the ATC terms and the ₹6,00,000 estimated value; ensure compliance with UP procurement norms.

What documents are required for the Uttar Pradesh feasibility tender?

Submit GST certificate, PAN, relevant experience certificates for similar studies, financial statements, and any required EMD per ATC. Include technical bid detailing study approach, data sources, and deliverables for BCHP-CCHP connectivity feasibility.

Which standards apply to the BCHP-CCHP feasibility contract in UP?

No explicit standards are listed in the public data; bidders should reference ATC terms and align methodology with common power project feasibility practices and UP government procurement guidelines as specified in the uploaded ATC.

When is the submission deadline for the Sonbhadra feasibility tender?

Deadline details are not disclosed in the public snippet and must be confirmed via the ATC document uploaded by the buyer. Expect a standard government tender deadline after ATC release.

What is the EMD amount for this UP tender?

The EMD amount is not disclosed in the available data; bidders should verify in the ATC file. Prepare to submit EMD as per ATC guidelines to avoid disqualification.

How to ensure eligibility for Uttar Pradesh energy feasibility tenders?

Ensure eligibility by providing GST, PAN, experience in related feasibility studies, and financial stability documents. Review ATC for any additional prerequisites and submit a robust methodology demonstrating BCHP-CCHP understanding.

What deliverables are expected from the feasibility study in UP?

Deliverables typically include a methodology, data collection plan, interconnection assumptions, risk assessment, cost-benefit analysis, and a final report. Align deliverables with ATC requirements and include clear milestones for Sonbhadra BCHP-CCHP integration.

Where to access the ATC terms for this tender in UP?

The ATC document is uploaded by the buyer in the tender portal. Review the ATC for conditions, EMD specifics, payment terms, and any unique clauses governing the BCHP-CCHP feasibility study in Sonbhadra.