GEM Active

BEARING FOR BLOWER 22230 (Double Row Self Aligning Spherical Roller Bearing 22230 EK, along with Ad

Deadline

03 Nov 2025

Location

ROHTAK, HARYANA

BEARING FOR BLOWER 22230 (Double Row Self Aligning Spherical Roller Bearing 22230 EK, along with Ad

Tender Key Details

Organization

National Fertilizers Limited (nfl)

Department

Department of Fertilizers

Quantity

8

Bid Validity

120 (Days)

Bid Type

Two Packet Bid

Tender Overview

BEARING FOR BLOWER 22230 (Double Row Self Aligning Spherical Roller Bearing 22230 EK, along with Ad

Important Timeline

Start: 13 Oct 2025

End: 03 Nov 2025

AI-Powered Bidder Prediction

Discover which companies are most likely to bid

Live Analysis

Unlock Bidder Insights

Get AI-powered predictions about which companies are most likely to bid on this tender

Additional Information

BEARING FOR BLOWER 22230 (Double Row Self Aligning Spherical Roller Bearing 22230 EK, along with Ad

Item Category

BEARING FOR BLOWER 22230 (Double Row Self Aligning Spherical Roller Bearing 22230 EK, along with Ada , THRUST BRG SKF 6318 C3 (Deep groove ball bearing number: 6318- C3, MAKE: SKF)

Organization Details

Authority

Organization

National Fertilizers Limited (nfl)

Department

Department of Fertilizers

Ministry

Ministry of Chemicals and Fertilizers

Contact

State

HARYANA

Documents & Downloads

GeM-Bidding-8467345.pdf

Main Document

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Required Documents from Seller

Certificate (Requested in ATC),OEM Authorization Certificate,Additional Doc 1 (Requested in ATC),Additional Doc 2 (Requested in ATC),Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Additional Info

Evaluation Method

Item wise evaluation/

Inspection Required

No

Arbitration

Yes (Arbitration clause document) as per DoE OM No.F.1/2/2024-PPD dated 03.06.2024 Arbitration should not be routinely included in contracts

Bid to RA

No