Bid Publish Date
11-Jan-2025, 1:32 pm
Bid End Date
21-Jan-2025, 2:00 pm
Location
Progress
Braithwaite And Company Limited invites bids for Supply of Ungalvanised Steel Wire Rope Size 12 MM, Supply of Ungalvanised Steel Wire Rope Size 14 MM, Supply of Ungalvanised Steel Wire Rope Size 10 MM, Supply of Ungalvanised Steel Wire Rope Size 18 MM, Supply of Wire Rope Compound in HOOGHLY, WEST BENGAL. Quantity: 1915. Submission Deadline: 21-01-2025 14: 00: 00. Submit your proposal before the deadline.
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | SHREE STEEL WIRE ROPES LIMITED Under PMA | - | 21-01-2025 11:22:43 | |
| 2 | UNIMECH LIFTING EQUIPMENTS PVT LTD Under PMA | - | 21-01-2025 10:51:50 |
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | UNIMECH LIFTING EQUIPMENTS PVT LTD(MSE)( MSE Social Category:General ) Under PMA | Item Categories : Supply of Ungalvanised Steel Wire Rope Size 12 MM,Supply of Ungalvanised Steel Wire Rope Size 14 MM |
Quantity
1915
Category
Supply of Ungalvanised Steel Wire Rope Size 12 MM
Bid Type
Two Packet Bid
Bid Validity
90 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
Min. Avg. Annual Turnover
1
OEM Avg. Turnover
1
Past Performance
50 %
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Supply of Ungalvanised Steel Wire Rope Size 12 MM , Supply of Ungalvanised Steel Wire Rope Size 14 MM , Supply of Ungalvanised Steel Wire Rope Size 10 MM , Supply of Ungalvanised Steel Wire Rope Size 18 MM , Supply of Wire Rope Compound
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Supply of Ungalvanised Steel Wire Rope Size 12 MM
Supply of Ungalvanised Steel Wire Rope Size 12 MM
Supply of Ungalvanised Steel Wire Rope Size 14 MM
Supply of Ungalvanised Steel Wire Rope Size 14 MM
Supply of Ungalvanised Steel Wire Rope Size 10 MM
Supply of Ungalvanised Steel Wire Rope Size 10 MM
Supply of Ungalvanised Steel Wire Rope Size 18 MM
Supply of Ungalvanised Steel Wire Rope Size 18 MM
Supply of Wire Rope Compound
Supply of Wire Rope Compound
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Supply of Ungalvanised Steel Wire Rope Size 12 MM | Supply of Ungalvanised Steel Wire Rope Size 12 MM | 1,000 | mtr | nanavit_chatterjee | 90 | |
| 2 | Supply of Ungalvanised Steel Wire Rope Size 14 MM | Supply of Ungalvanised Steel Wire Rope Size 14 MM | 300 | mtr | nanavit_chatterjee | 90 | |
| 3 | Supply of Ungalvanised Steel Wire Rope Size 10 MM | Supply of Ungalvanised Steel Wire Rope Size 10 MM | 300 | mtr | nanavit_chatterjee | 90 | |
| 4 | Supply of Ungalvanised Steel Wire Rope Size 18 MM | Supply of Ungalvanised Steel Wire Rope Size 18 MM | 300 | mtr | nanavit_chatterjee | 90 | |
| 5 | Supply of Wire Rope Compound | Supply of Wire Rope Compound | 15 | kg | nanavit_chatterjee | 90 |
Experience Criteria
Past Performance
Bidder Turnover
OEM Authorization Certificate
OEM Annual Turnover *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Key insights about WEST BENGAL tender market
The eligibility requirements include being a registered entity, demonstrating a minimum average annual turnover of 1 Lakh, and having a minimum of 3 years of past experience in the supply of similar items. Bidders should also provide an OEM Authorization Certificate.
Bidders must submit an OEM Authorization Certificate, proof of Past Performance, and documentation regarding Bidder Turnover to meet the tender's requirements.
To register for the tender, bidders need to complete the necessary registration on the designated platform, ensuring that their company details, financial information, and relevant certificates are accurately uploaded.
Accepted document formats typically include PDF and JPEG files. Bidders should refer to the tender document for details on any specific formatting requirements.
Yes, the tender specifies adherence to technical standards including tensile strength criteria as per IS:2266/02, in addition to other construction and material quality specifications relevant to ungalvanised steel wire ropes.
Suppliers must adhere to the quality standards outlined in the tender documentation, ensuring that all materials meet industry benchmarks and regulatory compliance.
Bidders must demonstrate compliance with all requirements listed in the tender document, including technical specifications, financial documentation, and experience criteria.
The EMD requirements are detailed in the tender document. Bidders should ensure they provide the necessary deposit to secure their bid for consideration.
Upon selection, the successful bidder may be required to submit a performance security as specified in the tender documentation to safeguard against contract performance issues.
Specific payment terms and conditions will be defined in the contract with the successful bidder, detailing payment schedules and conditions upon delivery of goods.
Price evaluation will be conducted based on the total value of the bids submitted, alongside a comparison of technical compliance to ensure cost-effectiveness without compromising on quality.
Submissions can typically be made electronically through the specified procurement portal. Bidders should ensure all required documentation is completely filled and uploaded as per guidelines.
While specific dates may vary, bidders should refer to the tender document for critical submission deadlines and evaluation timelines.
The evaluation process involves a two-step assessment: the first examines compliance with technical specifications and the second focuses on the total bid value to determine the most financially viable options.
Bid results will typically be communicated through the procurement portal or via email to bidders once the evaluation process is concluded, as outlined in the tender document.
Currently, the tender does not explicitly mention MSE benefits; however, registrants are encouraged to review for any potential allowances or government support measures.
The document does not specify provisions for startups; however, interested parties should check the details for any eligibility exemptions that may apply.
While specific references to ‘Make in India’ are not detailed, bidders are encouraged to comply with local manufacturing rules and local content requirements, as aligned with government procurement policies.