Bid Publish Date
06-Aug-2026, 4:15 pm
Bid End Date
31-Aug-2026, 1:00 pm
Location
Progress
A tender has been published for Ntpc Mining Limited Vibrometer - Induced Ground Vibration Monitoring Instrument (Q3) in HAZARIBAG, JHARKHAND. Quantity: 1 by. Submission Deadline: 31-08-2026 13: 00: 00. Check eligibility and apply.
Quantity
1
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
3 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Vibrometer - Induced Ground Vibration Monitoring Instrument (Q3)
Payment Timelines
Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
30
Delivery Locations
1
Delivery Cities
Hazaribagh
Delivery Pincodes
825311
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Purushottam Soni | 825311,NTPC MINING LTD ,Sikri Site Office, Pakri Barwadih CMP, Post: Barkagaon Sikri, Hazaribagh, Jharkhand | Hazaribagh | Jharkhand | 825311 | 1 | 30 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
CATALOG Specification
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Extended Deadline
31-Aug-2026, 7:30 am
Opening Date
31-Aug-2026, 8:00 am
Extended Deadline
24-Aug-2026, 7:30 am
Opening Date
24-Aug-2026, 8:00 am
Certificate (Requested in ATC)
OEM Authorization Certificate
Additional Doc 1 (Requested in ATC)
Additional Doc 2 (Requested in ATC)
Additional Doc 3 (Requested in ATC)
Additional Doc 4 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
| Category | Specification | Requirement |
|---|---|---|
| Certification | Warranty | 1, 2, 3 Or higher |
| Construction | Length of wire for geophone assembly(meter) | 5-6 |
| Construction | Length of wire for microphone assembly(meter) | 2-3 |
| Seismic Vibration Monitoring | Resolution of Seismic Velocity(mm/sec) | 0.006-0.009 |
| Seismic Vibration Monitoring | Minimum accuracy of Seismic velocity measurement | 5% |
| Seismic Vibration Monitoring | Maximum linear freqency response of Geophone | 250.0 |
| Sound Overpressure Monitoring | Maximum Linear sound overpressure monitored (dB) | 144-148 |
| Sound Overpressure Monitoring | Maximum Linear response of microphone | 250.0 |
| Sound Overpressure Monitoring | Minimum Linear sound overpressure monitored (dB) | 82-88 |
| Waveform recording & data collection | Sample Rate per channel(samples/sec) | 4096 |
| Waveform recording & data collection | Waveform recording modes | Fullwave form, Combined, Manual |
| Histogram/Bar Graph Recording | Display facility feature available | Peak particle velocity, Frequency, Displacement, Air over pressure level, Acceleration, Peak Vector Sum, RMS/Peak Velocity, Acceleration & Displacement |
| Generic Parameters | Water Proof(Submerged 20+ cm in water logged mines) | Yes |
| Generic Parameters | Modular Software for Vibration Data Analysis Provided | Yes |
| Generic Parameters | Integrated Keypad | Yes |
| Accessories | External data printer | No |