Progress
Dg Of Defence Estate invites bids for VT pump bowl assembly, suspension assembly with line shaft, bearings, , 4-pole, IE3 vertical motor complete, Discharge head, sole-base plate, coupling, Complete automatic star-delta control, Power-control cables, glands, lugs, Special erection tools, mandatory spares, Third-party inspection and factory performance, Packing, freight, transit insurance, unloading, Erection, installation, alignment, testing, 8-hour trial in RAMGARH, JHARKHAND. Quantity: 10. Submission Deadline: 17-10-2026 13: 00: 00. Submit your proposal before the deadline.
Quantity
10
Category
VT pump bowl assembly
Bid Type
Two Packet Bid
Bid Validity
30 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
RA Qualification Rule
50% Lowest Priced Technically Qualified Bidders
Tech Clarification Time
2 Days
EMD Required
Yes
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Min. Avg. Annual Turnover
6
OEM Avg. Turnover
6
Past Performance
50 %
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
VT pump bowl assembly , suspension assembly with line shaft, bearings, , 4-pole, IE3 vertical motor complete , Discharge head, sole-base plate, coupling , Complete automatic star-delta control , Power-control cables, glands, lugs , Special erection tools, mandatory spares , Third-party inspection and factory performance , Packing, freight, transit insurance, unloading , Erection, installation, alignment, testing, 8-hour trial
Advisory Bank
State Bank of India
ePBG Percentage
5%
ePBG Duration (Months)
33
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
RAMGARH
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | RAMGARH | RAMGARH | - | - | 1 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Extended Deadline
17-Oct-2026, 7:30 am
Opening Date
18-Oct-2026, 7:30 am
VT pump bowl assembly
VT pump bowl assembly, 2-stage,
suspension assembly with line shaft, bearings,
suspension assembly with line shaft, bearings, couplings
4-pole, IE3 vertical motor complete
45 kW (approx. 60 HP), 4-pole, IE3 vertical motor complete
Discharge head, sole-base plate, coupling
Discharge head, sole_base plate, coupling_guards
Complete automatic star-delta control
Complete automatic star-delta control panel with protections
Power-control cables, glands, lugs
Glands, lugs, supports and earthing complete as per site measurement
Special erection tools, mandatory spares
Special erection tools, mandatory spares, documentation and training
Third-party inspection and factory performance
Third-party inspection and factory performance testing
Packing, freight, transit insurance, unloading
Packing, freight, transit insurance, unloading and handling at site
Erection, installation, alignment, testing, 8-hour trial
Erection, installation, alignment, testing, 8-hour trial and commissioning
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | VT pump bowl assembly | VT pump bowl assembly, 2-stage, | 1 | pieces | nitin.thakur@2018 | 15 | |
| 2 | suspension assembly with line shaft, bearings, | suspension assembly with line shaft, bearings, couplings | 1 | pieces | nitin.thakur@2018 | 15 | |
| 3 | 4-pole, IE3 vertical motor complete | 45 kW (approx. 60 HP), 4-pole, IE3 vertical motor complete | 1 | pieces | nitin.thakur@2018 | 15 | |
| 4 | Discharge head, sole-base plate, coupling | Discharge head, sole_base plate, coupling_guards | 1 | pieces | nitin.thakur@2018 | 15 | |
| 5 | Complete automatic star-delta control | Complete automatic star-delta control panel with protections | 1 | pieces | nitin.thakur@2018 | 15 | |
| 6 | Power-control cables, glands, lugs | Glands, lugs, supports and earthing complete as per site measurement | 1 | pieces | nitin.thakur@2018 | 15 | |
| 7 | Special erection tools, mandatory spares | Special erection tools, mandatory spares, documentation and training | 1 | pieces | nitin.thakur@2018 | 15 | |
| 8 | Third-party inspection and factory performance | Third-party inspection and factory performance testing | 1 | pieces | nitin.thakur@2018 | 15 | |
| 9 | Packing, freight, transit insurance, unloading | Packing, freight, transit insurance, unloading and handling at site | 1 | pieces | nitin.thakur@2018 | 15 | |
| 10 | Erection, installation, alignment, testing, 8-hour trial | Erection, installation, alignment, testing, 8-hour trial and commissioning | 1 | pieces | nitin.thakur@2018 | 15 |
Discover companies most likely to bid on this tender
Experience Criteria
Past Performance
Bidder Turnover
OEM Authorization Certificate
OEM Annual Turnover *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer