TenderDekho Logo
Active GEM

Contract Bidding Open For VT pump bowl assembly,suspension assembly with line shaft, bearings,,4-pole, IE3 vertical motor com in RAMGARH, JHARKHAND

Bid Publish Date

03-Oct-2026, 1:02 pm

Bid End Date

17-Oct-2026, 1:00 pm

EMD

₹26,000

Value

₹13,00,000

Generate Docs

Progress

Issue03-Oct-2026, 1:02 pm
Corrigendum14-Oct-2026
AwardPending

Dg Of Defence Estate invites bids for VT pump bowl assembly, suspension assembly with line shaft, bearings, , 4-pole, IE3 vertical motor complete, Discharge head, sole-base plate, coupling, Complete automatic star-delta control, Power-control cables, glands, lugs, Special erection tools, mandatory spares, Third-party inspection and factory performance, Packing, freight, transit insurance, unloading, Erection, installation, alignment, testing, 8-hour trial in RAMGARH, JHARKHAND. Quantity: 10. Submission Deadline: 17-10-2026 13: 00: 00. Submit your proposal before the deadline.

Advertisement

Tender Data

Bid Details

Quantity

10

Category

VT pump bowl assembly

Bid Type

Two Packet Bid

Bid Validity

30 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

50% Lowest Priced Technically Qualified Bidders

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

6

OEM Avg. Turnover

6

Past Performance

50 %

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

VT pump bowl assembly , suspension assembly with line shaft, bearings, , 4-pole, IE3 vertical motor complete , Discharge head, sole-base plate, coupling , Complete automatic star-delta control , Power-control cables, glands, lugs , Special erection tools, mandatory spares , Third-party inspection and factory performance , Packing, freight, transit insurance, unloading , Erection, installation, alignment, testing, 8-hour trial

Advisory Bank

State Bank of India

ePBG Percentage

5%

ePBG Duration (Months)

33

Delivery Details

Max Delivery Days

15

Delivery Locations

1

Delivery Cities

RAMGARH

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-RAMGARHRAMGARH--115-

Authority Records

MINISTRY OF DEFENCEDEFENCE DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9980185.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

Dg Of Defence Estate

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Corrigendum Updates

1 Update
#1

Update

14-Oct-2026

Extended Deadline

17-Oct-2026, 7:30 am

Opening Date

18-Oct-2026, 7:30 am

Advertisement

Bill of Quantities (BOQ) 10 Items Sign in for GEM prices

#1

VT pump bowl assembly

VT pump bowl assembly, 2-stage,

1 pieces Delivery: 15 days
#2

suspension assembly with line shaft, bearings,

suspension assembly with line shaft, bearings, couplings

1 pieces Delivery: 15 days
#3

4-pole, IE3 vertical motor complete

45 kW (approx. 60 HP), 4-pole, IE3 vertical motor complete

1 pieces Delivery: 15 days
#4

Discharge head, sole-base plate, coupling

Discharge head, sole_base plate, coupling_guards

1 pieces Delivery: 15 days
#5

Complete automatic star-delta control

Complete automatic star-delta control panel with protections

1 pieces Delivery: 15 days
#6

Power-control cables, glands, lugs

Glands, lugs, supports and earthing complete as per site measurement

1 pieces Delivery: 15 days
#7

Special erection tools, mandatory spares

Special erection tools, mandatory spares, documentation and training

1 pieces Delivery: 15 days
#8

Third-party inspection and factory performance

Third-party inspection and factory performance testing

1 pieces Delivery: 15 days
#9

Packing, freight, transit insurance, unloading

Packing, freight, transit insurance, unloading and handling at site

1 pieces Delivery: 15 days
#10

Erection, installation, alignment, testing, 8-hour trial

Erection, installation, alignment, testing, 8-hour trial and commissioning

1 pieces Delivery: 15 days

Categories 38

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

OEM Authorization Certificate

5

OEM Annual Turnover *In case any bidder is seeking exemption from Experience / Turnover Criteria

6

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Advertisement