FUME HOOD
Office Of Dg (mss)
HYDERABAD, TELANGANA
Bid Publish Date
23-Feb-2026, 2:08 pm
Bid End Date
05-Mar-2026, 3:00 pm
EMD
₹1,02,000
Location
Progress
Quantity
4
Bid Type
Two Packet Bid
A tender has been published for N/a Fume Hood (FSSAI) (Q2) ( PAC Only) in ALLAHABAD, UTTAR PRADESH. Quantity: 4 by. Submission Deadline: 05-03-2026 15: 00: 00. Check eligibility and apply.
Main Document
OTHER
CATALOG Specification
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Office Of Dg (mss)
HYDERABAD, TELANGANA
Bio-processing Unit (bpu)
Chennai Petroleum Corporation Limited
TIRUVALLUR, TAMIL NADU
Indian Institute Of Technology (iit)
JODHPUR, RAJASTHAN
N/a
SOLAN, HIMACHAL PRADESH
Tender Results
Loading results...
| Category | Specification | Requirement |
|---|---|---|
| CONFORMITY | Conformity to Technical Requirements/Governing Specifications | As per Specification for “Fume Hood”, prepared/approved by Deputy Director, Quality assurance division, FSSAI on behalf of authority, dated 11-07-2022 (Copy of Specification uploaded in GeM Portal) |
| CONFORMITY | Scope of supply of "Fume Hood" covers all components as per governing specification ( Unless specified otherwise) | Yes |
| Buyer Specific Requirement | Spares and Accessories | Gas / Vacuum Tap, Additional Set of socket, Cabinet base of the fume hood is equipped by fixed supports and internal shelf for the regents storing, Min 2 Nos 15/5 amps 3 pin electric socket, Switch for blower, Switch for Lightings, Fume Hood Installation Kit and Accessories, Utility Pipe lines for Nitrogen, Compressed Air, Water, Safety Device Trip, 2 Nos: Florescent Lights 40W |
| Buyer Specific Requirement | Additional Requirements | List of Users from National Laboratories ( past 2 years) with contact details, Model Installed ( with documentary evidence) and date of installation, User, Technical and maintenance manuals in English language, List of equipment and procedures required for local calibration and routine maintenance, Service and operation manuals to be provided advanced maintenance tasks documentation |
| Buyer Specific Requirement | Comprehensive Onsite Warranty (Years) | Three year comprehensive on site warranty with one preventive maintenance from the date of installation and commissioning every year |
Discover companies most likely to bid on this tender
Experience Criteria
Past Performance
Bidder Turnover *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Sign up now to access all documents
Main Document
OTHER
CATALOG Specification
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS