TenderDekho Logo
GEM

Bharat Petroleum Corporation Ltd Mechanical Seal FBM PUMP Tender 2026 India - Seal, MECH, F/12PACF1003

Bid Publish Date

20-Jan-2026, 9:13 am

Bid End Date

05-Feb-2026, 10:00 am

Progress

Issue20-Jan-2026, 9:13 am
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

14

Category

SEAL, MECH, F/12PACF1003

Bid Type

Two Packet Bid

Key Highlights

  • Brand/OEM requirement: Not specified in data; verify during CRFQ
  • Technical standards: Explicit standards not listed; CRFQ governs compliance
  • Special clauses: 25% quantity option and extension of delivery period
  • Eligibility: No explicit experience/turnover data provided in the tender data
  • Warranty/AMC: Not disclosed in terms; confirm in CRFQ
  • Penalties/Performance: Not specified in data; refer to CRFQ for LDs
  • Delivery: Periods linked to original and extended orders; minimum 30 days extension
  • Submission: Seal & signed tender documents mandatory

Tender Overview

Bharat Petroleum Corporation Ltd invites bids for the mechanical seal FBM PUMP under the project category F/12PACF1003. The tender has no BOQ items published yet and the estimated value is not disclosed. The procurement location is not specified in the data. A key differentiator is the inclusion of an option clause allowing ±25% quantity variation at contracted rates, with delivery timing tied to the original delivery order and extended periods. Bidders must submit a sealed and signed copy of tender documents along with the bid, and terms will follow the CRFQ framework. This call for bids seeks qualified suppliers capable of meeting BPCL’s pump-seal compatibility requirements.

Technical Specifications & Requirements

  • Product: Mechanical seal for FBM PUMP
  • BOQ: Total Items: 0 (no items listed publicly)
  • Standards/Certifications: Not published in the data; bidders should verify CRFQ terms and any BPCL-specified compliance during bid submission
  • Delivery/Timing: Delivery schedule governed by the original delivery order; option clause may extend delivery time based on quantity changes
  • Documentation: Bid submission requires seal & signed copies of tender documents; material details to be per CRFQ
  • Additional context: No explicit performance metrics or material specs provided in the current tender data

Terms, Conditions & Eligibility

  • Option Clause: Purchaser may increase/decrease quantity by up to 25% at contract, and extend delivery period using a defined formula, with a minimum extension of 30 days
  • Submission: Upload seal & signed copies of all tender documents with the bid; details must align with CRFQ
  • Delivery period and extensions: Calculated based on (Increased quantity ÷ Original quantity) × Original delivery period, subject to limits
  • Compliance: Bidders must comply with the stated terms and CRFQ rules; specific EMD, turnover, or experience criteria are not disclosed in the data
  • Payment/Quality: Not specified in the data; bidders should rely on CRFQ terms and BPCL standard procurement processes

Key Specifications

  • Product/service names: mechanical seal for FBM PUMP

  • Quantities: ±25% option on contracted quantity

  • EMD/Estimated value: not disclosed

  • Experience: not specified in data; verify CRFQ

  • Quality/standards: CRFQ-based compliance; BPCL-specific terms

  • Delivery: tied to last date of original delivery order; extended delivery period governed by option clause

Terms & Conditions

  • Option to vary quantity by up to 25% at contract at BPCL's discretion

  • Delivery schedule follows original order with potential extensions

  • Submit sealed and signed tender documents; follow CRFQ rules

Important Clauses

Option Clause

BPCL may adjust quantity by ±25% and extend delivery as per the defined formula, minimum 30 days.

Delivery Schedule

Delivery period starts from the last date of the original delivery order; extended periods depend on option clause calculations.

Payment Terms

Payment terms not specified in data; to be defined in CRFQ and BPCL standard procurement terms.

Bidder Eligibility

  • Compliance with CRFQ-based terms

  • Ability to meet BPCL delivery requirements under option clause

  • Submission of seal & signed tender documents

Documents 5

GeM-Bidding-8850192.pdf

Main Document

Other Documents

OTHER

Other Documents

OTHER

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

Indian Army COPPER WASHER, NOZZLE, FUEL PUMP & ENGINE PARTS Tender 2026

Indian Army

LEH, JAMMU & KASHMIR

Posted: 12 January 2026
Closed: 24 January 2026
GEM

Indian Coast Guard spares procurement for ICGS C-150 Hut Bay: Valve, Seal, HP Pump, Hoses, O-rings, Membrane Cleaners 2026

Indian Coast Guard

SOUTH ANDAMAN, ANDAMAN & NICOBAR

Posted: 12 January 2026
Closed: 22 January 2026
GEM

Indian Army Department Of Military Affairs Tender Jalandhar Punjab SAP Pump Coolant Alt PT No B 7016008 & Related Parts 2025

Indian Army

JALANDHAR, PUNJAB

Posted: 26 December 2025
Closed: 12 January 2026
GEM

Indian Army Rocker Shaft Assembly & Fuel Pipe Tender Bikaner Rajasthan 2025

Indian Army

BIKANER, RAJASTHAN

Posted: 26 December 2025
Closed: 5 January 2026
GEM

MECH. SEAL ASSY. FOR B. F. P NDE SIDE, 5.5,MECH. SEAL ASSEMBLY FOR B. F. P, 5.5

National Aluminium Company Limited, Bhubaneswar

ANGUL, ODISHA

Posted: 19 December 2025
Closed: 2 January 2026
GEM

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration

2

PAN card

3

Experience certificates (if any per CRFQ guidance)

4

Financial statements (if required by CRFQ)

5

EMD/Security deposit documents (as per CRFQ)

6

Technical bid documents

7

OEM authorizations (if applicable)

Frequently Asked Questions

Key insights about MADHYA PRADESH tender market

How to participate in BPCL mechanical seal tender in India 2026

Bidders should submit a sealed and signed copy of all tender documents per CRFQ, provide OEM authorizations if required, furnish GST and PAN, and comply with BPCL’s option clause permitting ±25% quantity changes. Ensure documentation aligns with CRFQ and BPCL submission guidelines to qualify for evaluation.

What documents are required for BPCL FBM PUMP tender submission 2026

Required documents include GST registration, PAN card, experience certificates, financial statements if requested, EMD/Security documents, technical bid materials, and OEM authorizations. Ensure seal and signature on all tender documents and submission via the prescribed portal per CRFQ terms.

What are the delivery terms for BPCL mechanical seal tender 2026

Delivery is governed by the original delivery order; if quantity increases, delivery time extends using the formula (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum 30 days extension. The purchaser may further adjust within these limits under the option clause.

What standards or certifications apply to the BPCL FBM PUMP tender

The tender data does not list specific standards; compliance is governed by the CRFQ terms. Bidders should verify during bid submission for any BPCL-specified requirements, and prepare to demonstrate standard conformance if requested, including ISO/IS references via CRFQ.

How is the EMD amount handled for BPCL mechanical seal bid

The tender data does not disclose the exact EMD amount. Bidders should check the CRFQ for the required EMD value, acceptable payment mode (online or DD), and submission timing to avoid bid rejection.

When is the BPCL FBM PUMP tender submission deadline

The exact deadline is not provided in the available data. Bidders must refer to the CRFQ notification for final dates, ensuring timely submission of sealed tender documents and any required online uploads before the prescribed cut-off.

What is required to demonstrate eligibility for the BPCL procurement

Eligibility relies on CRFQ compliance, proper seal/signature on tender documents, and the ability to meet option-clause delivery adjustments. Present OEM authorizations, GST/PAN, and any requested financial statements or experience evidence per CRFQ guidance.

What happens if quantity changes under BPCL option clause

BPCL may increase or decrease order quantity by up to 25% at contract and during the currency of the contract. Delivery time adjusts according to a defined formula with a minimum 30-day extension, ensuring supply continuity for the FBM PUMP seals.

Similar Tenders

5 found

1.BALL VALVE SIZE- 10 NB,2.BALL VALVE SIZE- 20 NB,3.BALL VALVE SIZE 25 NB,4.BALL VALVE SIZE- 32 NB,

Mazagon Dock Shipbuilders Limited

📍 MUMBAI, MAHARASHTRA

⏰ Deadline: 4 weeks left
🛒 Type: Goods
View GEM

Complete Mechanical seal for ASW pump MVP600 100,O ring set for mechanical seal installed in ASW pu

Nuclear Power Corporation Of India Limited

📍 CHITTORGARH, RAJASTHAN

⏰ Deadline: 3 weeks left
🛒 Type: Goods
View GEM

ES1020K-B 21,ES1020K-0-15 A 20,ES1020K-0-15 A 6,ES1020K-0-15 B 3 1,ES1020K-0-15 C 10,ES1020K-0-15 C

Indian Navy

⏰ Deadline: 3 weeks left
🛒 Type: Goods
View GEM

Complete Pump With Fitted Mechanical Seal including Electric Motor and Base Frame and Coupling and

Nuclear Power Corporation Of India Limited

📍 TIRUNELVELI, TAMIL NADU

EMD: ₹33,857
⏰ Deadline: 3 weeks left
🛒 Type: Goods
View GEM

1 END NUT,2 FLOATING BUSH,3 SPECIAL WASHER,4 SECOND STAGE SPACER,5 SEPARATOR,6 RECOIL SLEEVE,7 TOP

Hindustan Aeronautics Limited (hal)

📍 NASHIK, MAHARASHTRA

⏰ Deadline: 2 weeks left
🛒 Type: Goods
View GEM