Bid Publish Date
09-Oct-2026, 6:39 pm
Bid End Date
19-Oct-2026, 7:00 pm
Location
Progress
The Indian Army, Department of Military Affairs, invites bids for multiple STLN components including High Pressure Hose Assemblies, Sleeve Liners, Piston Ring Sets, Hose Assemblies (TATA), Air Filters (TATA), Suspension Bush Kit Sets (MG), Valve Assemblies (MG), and Oxygen Sensors (MG) to be supplied from Anantnag, Jammu & Kashmir 192101. The scope covers Supply, Installation, Testing, Commissioning, operator training, and any required statutory clearances. The estimated value and EMD are not disclosed, while the BOQ lists 8 items with unspecified quantities. A key differentiator is the inclusion of advance sample approvals and potential quantity variations up to 25%. Unique terms emphasize bulk supply alignment to approved samples and non-LD extensions for buyer-delayed approvals.
Product/service names: High Pressure Hose Assemblies (STLN), Sleeve Liners (STLN), Piston Ring Sets (STLN), Hose Assembly (TATA), Air Filter (TATA), Suspension Bush Kit Set (MG), Valve Assembly (MG), Oxygen Sensor (MG)
Quantities: Not specified in BOQ; 8 total items with unspecified unit quantities
Estimated value: Not disclosed
Experience: Relevant prior supply/install/commissioning of automotive/machinery components
Quality/compliance: No explicit standards listed; supplier must adhere to approved samples and buyer-specified conformity
Option clause allows +/- 25% quantity variation at contract formation and during currency
Advance samples required within 5 days of contract award with modification or rejection timeline
Delivery schedule may extend if buyer delays sample approval, with no liquidated damages for such delay
Scope includes supply, installation, testing, commissioning, operator training, and statutory clearances if needed
Quantity may be increased/decreased by up to 25% at contract award and during currency; delivery period adjusts accordingly with a defined formula
Submit 2 advance samples within 5 days of award; buyer approves or lists modifications within 5 days; bulk supply must conform to approved sample
If buyer delays in sample approval, delivery period may be refixed without LD for the delay period
Proven capability to supply automotive/machine components to defense/government buyers
Compliance with sample-based conformity and bulk manufacturing after approval
Ability to provide training and handle statutory clearances if required
Quantity
12
Category
High Pressure Hose Assy STLN
Bid Type
Single Packet Bid
Bid Validity
15 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
High Pressure Hose Assy STLN , Sleeve Liner STLN , Piston Ring Set STLN , Hose Assy TATA , Air Filter TATA , Suspension Bush Kit Set MG , Valve Assy MG , Oxygen Sensor MG
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
Ananthnag
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | Ananthnag | Ananthnag | - | - | 1 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
High Pressure Hose Assy STLN
High Pressure Hose Assy STLN
Sleeve Liner STLN
Sleeve Liner STLN
Piston Ring Set STLN
Piston Ring Set STLN
Hose Assy TATA
Hose Assy TATA
Air Filter TATA
Air Filter TATA
Suspension Bush Kit Set MG
Suspension Bush Kit Set MG
Valve Assy MG
Valve Assy MG
Oxygen Sensor MG
Oxygen Sensor MG
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | High Pressure Hose Assy STLN | High Pressure Hose Assy STLN | 1 | pieces | 983wksp | 15 | |
| 2 | Sleeve Liner STLN | Sleeve Liner STLN | 2 | pieces | 983wksp | 15 | |
| 3 | Piston Ring Set STLN | Piston Ring Set STLN | 1 | pieces | 983wksp | 15 | |
| 4 | Hose Assy TATA | Hose Assy TATA | 1 | pieces | 983wksp | 15 | |
| 5 | Air Filter TATA | Air Filter TATA | 1 | pieces | 983wksp | 15 | |
| 6 | Suspension Bush Kit Set MG | Suspension Bush Kit Set MG | 2 | pieces | 983wksp | 15 | |
| 7 | Valve Assy MG | Valve Assy MG | 2 | pieces | 983wksp | 15 | |
| 8 | Oxygen Sensor MG | Oxygen Sensor MG | 2 | pieces | 983wksp | 15 |
Discover companies most likely to bid on this tender
GST certificate
PAN card
Experience certificates (relevant to supply of mechanical/hydraulic assemblies)
Financial statements (audited, if available)
EMD/Security deposit documentation (amount not disclosed in tender data)
Technical bid documentation demonstrating conformity to sample-based approvals
OEM authorization documents (if required for TATA/MG components)
Any statutory clearance certificates (if applicable)
Key insights about JAMMU AND KASHMIR tender market
Bidders must submit GST, PAN, experience certificates, and financial statements, along with technical bid documents showing conformity to advance samples. Ensure OEM authorizations for TATA/MG parts and address scope including supply, installation, testing, commissioning, and operator training; follow sample submission within 5 days of award.
Required documents include GST certificate, PAN card, experience certificates, financial statements, EMD/Bond documentation, technical bid demonstrating conformity to samples, OEM authorizations for TATA/MG items, and any applicable statutory clearance certificates.
No explicit specifications are listed; bidders must rely on approved advance samples for High Pressure Hose Assemblies, Sleeve Liners, Piston Ring Sets, and related MG/TATA parts, ensuring conformity with site approvals and the supplier’s testing/installation capabilities.
Two advance samples must be submitted within 5 days of contract award. The Buyer will approve or request modifications within 5 days of receiving the samples, affecting bulk production timelines.
The option clause permits ±25% quantity variation at contract award and during currency. Delivery period adjustments are calculated by (increased quantity/original quantity) × original delivery period, with a minimum 30 days.
Advance samples define the standard for bulk manufacturing. Any major deviations may lead to rejection or a requirement for fresh samples; delays by the buyer in approval extend the delivery timeline without LD.
The tender data does not list explicit standards; bidders must present samples and ensure conformity with the buyer’s specifications, OEM authorizations, and any statutory clearances applicable to the defense procurement.
Scope includes supply, installation, testing, commissioning, operator training, and any required statutory clearances. It covers 8 listed items, with quantities to be confirmed during contract formation.