Contract Bidding Open For 220kV Isolator,220kV Isolator,220kV Isolator,220kV Isolator,220kV Isolator mandatory spare,MS ROD,2

Bid Publish Date

14-Aug-2026, 10:46 am

Bid End Date

04-Sep-2026, 11:00 am

Progress

Issue14-Aug-2026, 10:46 am
AwardPending

Power Grid Corporation Of India Limited invites bids for 220kV Isolator, 220kV Isolator mandatory spare, MS ROD, ISOLATOR, DB, ISOLATOR-RETROFITTING, ISOLATOR-DB with 1 ES, ISOLATOR- DB with 2 ES, 245 KV ISOLATORS - SPARES, Spare, ISOLATOR-DB with 2 ES, ISOLATOR- DB with 1 ES, ISOLATOR, DB with 1 ES, ISOLATOR, DB with 2 ES, 245 kV Isolator. Quantity: 580. Submission Deadline: 04-09-2026 11: 00: 00. Submit your proposal before the deadline.

Tender Data

Bid Details

Quantity

580

Category

220kV Isolator

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

50% Lowest Priced Technically Qualified Bidders

Tech Clarification Time

3 Days

Preference & Exemptions

EMD Required

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

220kV Isolator , 220kV Isolator mandatory spare , MS ROD , ISOLATOR, DB , ISOLATOR-RETROFITTING , ISOLATOR-DB with 1 ES , ISOLATOR- DB with 2 ES , 245 KV ISOLATORS - SPARES , Spare , ISOLATOR-DB with 2 ES , ISOLATOR- DB with 1 ES , ISOLATOR, DB with 1 ES , ISOLATOR, DB with 2 ES , 245 kV Isolator

Advisory Bank

State Bank of India

ePBG Percentage

5%

ePBG Duration (Months)

32

Payment Timelines

Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Pre-Bid & Qualification

Pre-Bid Date

24-08-2026 11:00:00

Pre-Bid Venue

Online

Delivery Details

Max Delivery Days

548

Delivery Locations

1

Delivery Cities

Palnadu

Delivery Pincodes

522426

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Kunkanur Subodhkanth522426,Power Grid Corporation of India Limited, Nagarjunasagar 400KV SS, Tallapalli village, Macherla Mandal, Guntur Dist, Andhra Pradesh- 522426PalnaduAndhra Pradesh5224261548-

Authority Records

MINISTRY OF POWERPOWER GRID CORPORATION OF INDIA LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 7

GeM-Bidding-9704001.pdf

Main Document

Other Documents

OTHER

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Office Name

Corporate Office Gurgaon

Grievance Contact

[email protected]

Bill of Quantities (BOQ) 71 Items Sign in for GEM prices

#1

220kV Isolator

Supply of 245KV,1600A,50kA Isolator (3-Phase) (Double Break) with one E/S as per technical specification including Support insulators, terminal connectors & support structure(Conforming to std drawing) suitable for existing foundation. As per TS and SoW .

1 set Delivery: 548 days
#2

220kV Isolator

Retrofitting of 245KV,1600A,50kA Isolator (3-Phase) (Double Break) with one E/S as per technical specification including Support insulators, terminal connectors & support structure(Conforming to std drawing) suitable for existing foundation. As per TS and SoW .

1 set Delivery: 548 days
#3

220kV Isolator

Supply of 245KV,1600A,50kA Isolator (3-Phase) (Double Break) with two E/S as per technical specification including Support insulators, terminal connectors & support structure(Conforming to std drawing) suitable for existing foundation As per TS and SoW .

2 set Delivery: 548 days
#4

220kV Isolator

Retrofitting of 245KV,1600A,50kA Isolator (3-Phase) (Double Break) with two E/S as per technical specification including Support insulators, terminal connectors & support structure(Conforming to std drawing) suitable for existing foundation As per TS and SoW .

2 set Delivery: 548 days
#5

220kV Isolator mandatory spare

Supply of 245KV,1600A,50kA Isolator (3-Phase) (Double Break) with two E/S as per technical specification including Support insulators, terminal connectors and support structure (Conforming to std drawing) suitable for existing foundation As per TS and SoW .

1 set Delivery: 548 days
#6

MS ROD

Supply of 40mm MS ROD (Mild Steel rod as per IS 2062/ SAE1018) and Freight charges for Supply of 40mm MS ROD As per TS and SoW .

250 mtr Delivery: 548 days
#7

220kV Isolator

Associsted Work with retrofitment Annex-A As per TS and SoW .

1 lot Delivery: 548 days
#8

ISOLATOR, DB

Supply of 245 kV, 3ph, 2500A, 50 kA Double Break isolator without Earth Switch, including support insulators, interpole cables, lugs & gland and Terminal connectors. As per TS and SoW .

1 nos Delivery: 548 days
#9

ISOLATOR-RETROFITTING

Retrofitment of 245 kV, 3ph, 2500A, 50 kA Double Break isolator without Earth Switch, including support insulators, interpole cables, lugs & gland and Terminal connectors. As per TS and SoW .

1 nos Delivery: 548 days
#10

ISOLATOR-DB with 1 ES

Supply of 245 kV, 3ph, 2500A, 50 kA Double Break isolator with one Earth Switch, including support insulators, interpole cables, lugs & gland and Terminal connectors As per TS and SoW .

1 nos Delivery: 548 days
#11

ISOLATOR-RETROFITTING

Retrofitment of 245 kV, 3ph, 2500A, 50 kA Double Break isolator with one Earth Switch, including support insulators, interpole cables, lugs & gland and Terminal connectors. As per TS and SoW .

1 nos Delivery: 548 days
#12

ISOLATOR- DB with 2 ES

Supply of 245 kV, 3ph, 2500A, 50 kA Double Break isolator with two Earth Switch, including support insulators, interpole cables, lugs & gland and Terminal connectors. (With Individual Motor) As per TS and SoW .

1 nos Delivery: 548 days
#13

ISOLATOR-RETROFITTING

Retrofitment of 245 kV, 3ph, 2500A, 50 kA Double Break isolator with two Earth Switch, including support insulators, interpole cables, lugs & gland and Terminal connectors. (With Individual Motor) As per TS and SoW .

1 nos Delivery: 548 days
#14

245 KV ISOLATORS - SPARES

Supply of 245 kV, 2500A, 50 kA Isolator-1 Phase with E/S One complete pole including support Insulator, motor operating mechanism (MOM) and terminal connector but excluding structure As per TS and SoW .

1 pole Delivery: 548 days
#15

Spare

Spere as per Annexure B of SoW

1 lot Delivery: 548 days
#16

ISOLATOR, DB

Supply of 245 kV, 3ph, 2500A, 50 kA Double Break isolator without Earth Switch, including support insulators, interpole cables, lugs & gland and Terminal connectors. As per TS and SoW .

2 nos Delivery: 548 days
#17

ISOLATOR-RETROFITTING

Retrofitment of 245 kV, 3ph, 2500A, 50 kA Double Break isolator without Earth Switch, including support insulators, interpole cables, lugs & gland and Terminal connectors. As per TS and SoW .

2 nos Delivery: 548 days
#18

ISOLATOR-DB with 2 ES

Supply of 245 kV, 3ph, 2500A, 50 kA Double Break isolator with two Earth Switch, including support insulators, interpole cables, lugs & gland and Terminal connectors. As per TS and SoW .

1 nos Delivery: 548 days
#19

ISOLATOR-RETROFITTING

Retrofitment of 245 kV, 3ph, 2500A, 50 kA Double Break isolator with two Earth Switch, including support insulators, interpole cables, lugs & gland and Terminal connectors. As per TS and SoW .

1 nos Delivery: 548 days
#20

245 KV ISOLATORS - SPARES

Supply of 245 kV, 2500A, 50 kA Isolator-1 Phase with E/S One complete pole including support Insulator, motor operating mechanism (MOM) and terminal connector but excluding structure As per TS and SoW .

1 pole Delivery: 548 days
#21

Spare

Spare as per Anex C of SoW

1 lot Delivery: 548 days
#22

ISOLATOR, DB

Supply of 245 kV, 3ph, 2500A, 50 kA Double Break isolator without Earth Switch, including support insulators, interpole cables, lugs & gland and Terminal connectors. As per TS and SoW .

17 nos Delivery: 548 days
#23

ISOLATOR-RETROFITTING

Retrofitment of 245 kV, 3ph, 2500A, 50 kA Double Break isolator without Earth Switch, including support insulators, interpole cables, lugs & gland and Terminal connectors. As per TS and SoW .

17 nos Delivery: 548 days
#24

ISOLATOR- DB with 1 ES

Supply of 245 kV, 3ph, 2500A, 50 kA Double Break isolator with one Earth Switch, including support insulators, interpole cables, lugs & gland and Terminal connectors. As per TS and SoW .

9 nos Delivery: 548 days
#25

ISOLATOR-RETROFITTING

Retrofitment of 245 kV, 3ph, 2500A, 50 kA Double Break isolator with one Earth Switch, including support insulators, interpole cables, lugs & gland and Terminal connectors. As per TS and SoW .

9 nos Delivery: 548 days
#26

ISOLATOR- DB with 2 ES

Supply of 245 kV, 3ph, 2500A, 50 kA Double Break isolator with two Earth Switch, including support insulators, interpole cables, lugs & gland and Terminal connectors. As per TS and SoW .

11 nos Delivery: 548 days
#27

ISOLATOR-RETROFITTING

Retrofitment of 245 kV, 3ph, 2500A, 50 kA Double Break isolator with two Earth Switch, including support insulators, interpole cables, lugs & gland and Terminal connectors. As per TS and SoW .

11 nos Delivery: 548 days
#28

245 KV ISOLATORS - SPARES

Supply of 245 kV, 2500A, 50 kA Isolator-1 Phase with E/S One complete pole including support Insulator, motor operating mechanism (MOM) and terminal connector but excluding structure As per TS and SoW .

1 pole Delivery: 548 days
#29

Spare

Spare as per Anex D of SoW

1 lot Delivery: 548 days
#30

ISOLATOR, DB

Supply of 245 kV, 3ph, 2500A, 50 kA Double Break isolator without Earth Switch, including support insulators, interpole cables, lugs & gland and Terminal connectors. As per TS and SoW .

1 nos Delivery: 548 days
#31

ISOLATOR-RETROFITTING

Retrofitment of 245 kV, 3ph, 2500A, 50 kA Double Break isolator without Earth Switch, including support insulators, interpole cables, lugs & gland and Terminal connectors. As per TS and SoW .

1 nos Delivery: 548 days
#32

ISOLATOR-DB with 1 ES

Supply of 245 kV, 3ph, 2500A, 50 kA Double Break isolator with one Earth Switch, including support insulators, interpole cables, lugs & gland and Terminal connectors. As per TS and SoW .

2 nos Delivery: 548 days
#33

ISOLATOR-RETROFITTING

Retrofitment of 245 kV, 3ph, 2500A, 50 kA Double Break isolator with one Earth Switch, including support insulators, interpole cables, lugs & gland and Terminal connectors. As per TS and SoW .

2 nos Delivery: 548 days
#34

ISOLATOR- DB with 2 ES

Supply of 245 kV, 3ph, 2500A, 50 kA Double Break isolator with two Earth Switch, including support insulators, interpole cables, lugs & gland and Terminal connectors. As per TS and SoW .

2 nos Delivery: 548 days
#35

ISOLATOR-RETROFITTING

Retrofitment of 245 kV, 3ph, 2500A, 50 kA Double Break isolator with two Earth Switch, including support insulators, interpole cables, lugs & gland and Terminal connectors. As per TS and SoW .

2 nos Delivery: 548 days
#36

MS ROD

Spare as per Annex E of SoW

1 lot Delivery: 548 days
#37

ISOLATOR, DB

Supply of 245 kV, 3ph, 2500A, 50 kA Double Break isolator without Earth Switch, including support insulators, interpole cables, lugs & gland and Terminal connectors. As per TS and SoW .

7 nos Delivery: 548 days
#38

ISOLATOR-RETROFITTING

Retrofitment of 245 kV, 3ph, 2500A, 50 kA Double Break isolator without Earth Switch, including support insulators, interpole cables, lugs & gland and Terminal connectors. As per TS and SoW .

7 nos Delivery: 548 days
#39

ISOLATOR-DB with 1 ES

Supply of 245 kV, 3ph, 2500A, 50 kA Double Break isolator with one Earth Switch, including support insulators, interpole cables, lugs & gland and Terminal connectors. As per TS and SoW .

9 nos Delivery: 548 days
#40

ISOLATOR-RETROFITTING

Retrofitment of 245 kV, 3ph, 2500A, 50 kA Double Break isolator with one Earth Switch, including support insulators, interpole cables, lugs & gland and Terminal connectors. As per TS and SoW .

9 nos Delivery: 548 days
#41

ISOLATOR-DB with 2 ES

Supply of 245 kV, 3ph, 2500A, 50 kA Double Break isolator with two Earth Switch, including support insulators, interpole cables, lugs & gland and Terminal connectors. As per TS and SoW .

7 nos Delivery: 548 days
#42

ISOLATOR-RETROFITTING

Retrofitment of 245 kV, 3ph, 2500A, 50 kA Double Break isolator with two Earth Switch, including support insulators, interpole cables, lugs & gland and Terminal connectors. As per TS and SoW .

7 nos Delivery: 548 days
#43

Spare

Spare as per Annex F of SoW

1 lot Delivery: 548 days
#44

ISOLATOR, DB

Supply of 245 kV, 3ph, 2500A, 50 kA Double Break isolator without Earth Switch, including support insulators, interpole cables, lugs & gland and Terminal connectors. As per TS and SoW .

12 nos Delivery: 548 days
#45

ISOLATOR-RETROFITTING

Retrofitment of 245 kV, 3ph, 2500A, 50 kA Double Break isolator without Earth Switch, including support insulators, interpole cables, lugs & gland and Terminal connectors. As per TS and SoW .

12 nos Delivery: 548 days
#46

ISOLATOR, DB with 1 ES

Supply of 245 kV, 3ph, 2500A, 50 kA Double Break isolator with one Earth Switch, including support insulators, interpole cables, lugs & gland and Terminal connectors. As per TS and SoW .

6 nos Delivery: 548 days
#47

ISOLATOR-RETROFITTING

Retrofitment of 245 kV, 3ph, 2500A, 50 kA Double Break isolator with one Earth Switch, including support insulators, interpole cables, lugs & gland and Terminal connectors. As per TS and SoW .

6 nos Delivery: 548 days
#48

ISOLATOR, DB with 2 ES

Supply of 245 kV, 3ph, 2500A, 50 kA Double Break isolator with two Earth Switch, including support insulators, interpole cables, lugs & gland and Terminal connectors. As per TS and SoW .

6 nos Delivery: 548 days
#49

ISOLATOR-RETROFITTING

Retrofitment of 245 kV, 3ph, 2500A, 50 kA Double Break isolator with two Earth Switch, including support insulators, interpole cables, lugs & gland and Terminal connectors. As per TS and SoW .

6 nos Delivery: 548 days
#50

245 KV ISOLATORS - SPARES

Supply of 245 kV, 2500A, 50 kA Isolator-1 Phase with E/S One complete pole including support Insulator, motor operating mechanism (MOM) and terminal connector but excluding structure As per TS and SoW .

1 pole Delivery: 548 days
#51

Spare

Spare as per Annex G of SoW

1 lot Delivery: 548 days
#52

245 kV Isolator

Supply of 245kV, 1600A, 50 KA, 3-phase Double Break Isolator with one E/S As per TS and SoW .

7 set Delivery: 548 days
#53

245 kV Isolator

Retrofitment of 245kV, 1600A, 50 KA, 3-phase Double Break Isolator with one E/S As per TS and SoW .

7 set Delivery: 548 days
#54

245 kV Isolator

Supply of 245kV, 1600A, 50 KA, 3-phase Double Break Isolator with one E/S As per TS and SoW .

2 set Delivery: 548 days
#55

245 kV Isolator

Retrofitment of 245kV, 1600A, 50 KA, 3-phase Double Break Isolator with one E/S As per TS and SoW .

2 set Delivery: 548 days
#56

245 kV Isolator

Supply of 245kV, 1600A, 50 KA, 3-phase Double Break Isolator with one E/S As per TS and SoW .

7 set Delivery: 548 days
#57

245 kV Isolator

Retrofitment of 245kV, 1600A, 50 KA, 3-phase Double Break Isolator with one E/S As per TS and SoW .

7 set Delivery: 548 days
#58

245 kV Isolator

Supply of 245kV, 1600A, 50 KA, 3-phase Double Break Isolator with two E/S As per TS and SoW .

7 set Delivery: 548 days
#59

245 kV Isolator

Retrofitment of 245kV, 1600A, 50 KA, 3-phase Double Break Isolator with two E/S As per TS and SoW .

7 set Delivery: 548 days
#60

245 kV Isolator

Supply of 245kV, 1600A, 50 KA, 3-phase Double Break Isolator with two E/S As per TS and SoW .

7 set Delivery: 548 days
#61

245 kV Isolator

Retrofitment of 245kV, 1600A, 50 KA, 3-phase Double Break Isolator with two E/S As per TS and SoW .

7 set Delivery: 548 days
#62

245 kV Isolator

Supply of 245kV,2500A, 50KA, 3-phase Double Break Isolator with two E/s As per TS and SoW .

2 set Delivery: 548 days
#63

245 kV Isolator

Retrofitment of 245kV,2500A, 50KA, 3-phase Double Break Isolator with two E/s As per TS and SoW .

2 set Delivery: 548 days
#64

245 kV Isolator

Supply of 245kV,2500A, 50KA, 3-phase Double Break Isolator with two E/s As per TS and SoW .

2 set Delivery: 548 days
#65

245 kV Isolator

Retrofitment of 245kV,2500A, 50KA, 3-phase Double Break Isolator with two E/s As per TS and SoW .

2 set Delivery: 548 days
#66

245 kV Isolator

Supply of 245kV,1600A, 50KA, Tandem Isolator without E/S As per TS and SoW .

14 set Delivery: 548 days
#67

245 kV Isolator

Retrofitment of 245kV,1600A, 50KA, Tandem Isolator without E/S As per TS and SoW .

14 set Delivery: 548 days
#68

245 kV Isolator

Supply of 245kV,1600A, 50KA, Tandem Isolator without E/S As per TS and SoW .

12 set Delivery: 548 days
#69

245 kV Isolator

Retrofitment of 245kV,1600A, 50KA, Tandem Isolator without E/S As per TS and SoW .

12 set Delivery: 548 days
#70

245 kV Isolator

Supply of 245 kV, 1600A, 50 kA, Tandem Isolator without E/S As per TS and SoW .

1 set Delivery: 548 days
#71

245 kV Isolator

Retrofitment of 245 kV, 1600A, 50 kA, Tandem Isolator without E/S As per TS and SoW .

1 set Delivery: 548 days

Categories 17

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Bidder Turnover

3

Certificate (Requested in ATC)

4

OEM Authorization Certificate

5

Additional Doc 1 (Requested in ATC)

6

Additional Doc 2 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria

7

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer