Indian Army Department of Military Affairs 7 inch FPV Drone Tender 2026
Indian Army
TAWANG, ARUNACHAL PRADESH
Bid Publish Date
21-Feb-2026, 8:10 pm
Bid End Date
04-Mar-2026, 9:00 pm
Location
Progress
Quantity
1
Bid Type
Two Packet Bid
Organization: Indian Army (Department of Military Affairs). Product/Service: procurement of a 7-inch FPV drone. Location: West Kameng, Arunachal Pradesh (postal 790001). No BOQ items are listed at this time, indicating a potentially single-supply drone procurement with undefined quantity. The tender includes an option clause allowing up to 25% quantity variation and extended delivery timing based on formula (Increased quantity ÷ Original quantity) × Original delivery period, with a mandatory minimum of 30 days. The delivery schedule can extend within contracted rates, and bidders must comply with these delivery terms. This procurement is issued by the Indian Army under government MFCA processes and may require rapid qualification for fast-moving defense equipment.
Product/Category: 7-inch FPV Drone
Estimated Value: Not specified
EMD Amount: Not specified
Delivery Terms: As per option clause; extended delivery period calculations provided
Standards/Certifications: Not specified in the data; bidders should reference standard unmanned aircraft practices
Experience: Not specified; prepare documentation for defense-grade UAV supply
Proven experience in supplying unmanned aerial systems or defense drones
Financial capability to support supply and warranty commitments
Ability to meet delivery timelines under option-based quantity changes
Main Document
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
TAWANG, ARUNACHAL PRADESH
Indian Army
TAWANG, ARUNACHAL PRADESH
Indian Army
Indian Army
JAMMU, JAMMU & KASHMIR
Indian Army
FARIDKOT, PUNJAB
Tender Results
Loading results...
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for prior drone supply or related defense equipment
Financial statements (last 2-3 years) demonstrating financial stability
EMD submission document (as per prevailing guidelines)
Technical bid documents (device specifications, safety features, test data)
OEM authorization/certifications (if required by the organization)
Plastic or digital bid submission proof (as applicable)
Key insights about ARUNACHAL PRADESH tender market
Bidders should submit standard GST, PAN, and experience certificates, plus financial statements and EMD as per defense procurement norms. Prepare a technical bid with 7-inch FPV drone specifications, OEM authorizations if required, and ensure delivery capability under the option clause allowing ±25% quantity changes.
Required documents include GST registration, PAN, experience certificates in UAV supply, financial statements, EMD submission, technical bid detailing drone specifications, and OEM authorization. Ensure compliance with defense procurement policies and regional procurement guidelines.
Delivery starts after the original delivery order date; extended delivery time is calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days. The purchaser may extend within the original delivery period; bidders must comply with option-based timelines.
The purchaser reserves the right to vary quantity up to 25% of bid quantity at contract placement and during the currency of the contract, at contracted rates, with delivery time adjustments as described.
Include a complete 7-inch FPV drone specification set: flight controller, motors, propellers, endurance, control link, payload capability, safety features, and testing data. If OEM-specific standards exist, attach certification documents and ISI/ISO alignment if applicable.
The tender data does not specify certifications; bidders should include applicable UAV safety and aviation standards, OEM certifications, and defense-suitable testing evidence to demonstrate reliability and compliance with typical military drone requirements.
The option clause enables the purchaser to adjust quantity by up to 25% during contract placement and during currency, affecting delivery schedules and total contract value. Prepare pricing that accommodates potential quantity changes and ensure supply chain readiness.
Delivery timelines depend on the original delivery order date; any extensions due to quantity changes start from the last date of the relevant delivery order. Ensure your project management plan accommodates the minimum 30-day extension requirement.
Sign up now to access all documents
Main Document
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS