Bid Publish Date
12-Jun-2026, 5:27 pm
Bid End Date
03-Jul-2026, 6:00 pm
EMD
₹3,37,500
Value
₹1,35,00,000
Location
Progress
Quantity
14750
Category
First Floor Men Restroom
Bid Type
Two Packet Bid
The CBIC Central Board Of Indirect Taxes & Customs invites bids for multiple restrooms across floors in its Chennai, Tamil Nadu location, including Ground Floor Physically Challenged Friendly Restroom and various First–Fifth Floor facilities. Estimated value is ₹1,35,00,000 with an EMD of ₹3,37,500. The BOQ lists 14 items, though individual item specifics are not provided in the data. An important clause allows a ±25% quantity variation during contract execution, at the original contract rates, with delivery timelines anchored to the last original delivery date. This procurement emphasizes compliant execution, risk-sharing, and flexible quantity handling. The tender requires adherence to defined ATC terms and supplier sub-contract controls.
Total BOQ items: 14 (Item details not provided; N/A entries)
Estimated contract value: ₹1,35,00,000
EMD amount: ₹3,37,500
Option clause: +/- 25% quantity during contract; delivery time scales with formula; minimum 30 days
Delivery period commences from last date of original delivery order
Assignment/sub-contract requires prior written consent; joint liability retained
No explicit technical standards or material specifications provided in data
EMD amount and validity, along with option clause for quantity changes
Delivery timelines tied to original schedule with minimum 30 days extension
Assignment/sub-contract controls and joint liability obligations
Payment terms are defined in the ATC; specific percentages and milestones are not disclosed in the provided data
Delivery period starts from the last date of the original delivery order; additional time is calculated as (additional quantity / original quantity) × original delivery period, minimum 30 days
Not detailed in the supplied data; penalties to be specified in ATC
Must provide EMD of ₹3,37,500 and GST registration
Experience in providing restroom facilities or similar large-venue fit-outs
Compliance with assignment/sub-contract consent and joint liability terms
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Ground Floor Physically Challenged Friendly Restroom , First Floor Men Restroom , First Floor Women Restroom , Second Floor Men Restroom , Second Floor Women Restroom , Second Floor Women Officer Restroom , Third Floor Men Restroom , Third Floor Women Restroom , Fourth Floor Men Restroom , Fourth Floor Women Restroom , Fifth Floor Men Restroom , Fifth Floor Women Restroom , First Floor Women Waiting Room , Fourth Floor Visitor Waiting Room
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Ground Floor Physically Challenged Friendly Restroom
Renovation of restroom including tile replacement, waterproofing, false ceiling, toilets, urinals, wash basins, plumbing, electrical works, ramp, door, and accessibility fittings.
First Floor Men Restroom
Restroom renovation with tile replacement, waterproofing, false ceiling, 3 WC cubicles, 4 urinals, wash basins, plumbing, electrical works, ventilation, door, and finishing.
First Floor Women Restroom
Restroom renovation with tile replacement, waterproofing, false ceiling, WC and Indian toilet cubicles, wash basins, plumbing, electrical works, ventilation, door, and finishing.
Second Floor Men Restroom
Restroom renovation including tile replacement, waterproofing, false ceiling, 3 WC cubicles, 4 urinals, wash basins, plumbing, electrical, ventilation, door, and finishing works.
Second Floor Women Restroom
Restroom renovation including tile replacement, waterproofing, false ceiling, Western & Indian toilets, wash basins, plumbing, electrical, ventilation, door, and finishing works.
Second Floor Women Officer Restroom
Restroom renovation with tile replacement, waterproofing, false ceiling, Western & Indian toilet cubicles, wash basins, plumbing, electrical, ventilation, door, access modifications, and finishing works.
Third Floor Men Restroom
Restroom renovation with tile replacement, waterproofing, false ceiling, 2 WC cubicles, 2 urinals, wash basins, sensor faucets, plumbing, electrical, ventilation, door, and finishing works.
Third Floor Women Restroom
Restroom renovation with tile replacement, waterproofing, false ceiling, Western & Indian toilet cubicles, wash basins, plumbing, electrical, ventilation, door, and finishing works.
Fourth Floor Men Restroom
Restroom renovation with tile replacement, waterproofing, false ceiling, 3 WC cubicles, 4 urinals, wash basins, plumbing, electrical, ventilation, door, and finishing works.
Fourth Floor Women Restroom
Restroom renovation including tile replacement, waterproofing, false ceiling, Western & Indian toilets, wash basins, plumbing, electrical, ventilation, door, and finishing works.
Fifth Floor Men Restroom
Restroom renovation including tile replacement, waterproofing, false ceiling, 3 WC cubicles, 4 urinals, wash basins, plumbing, electrical, ventilation, door, and finishing works.
Fifth Floor Women Restroom
Restroom renovation including tile replacement, waterproofing, false ceiling, Western & Indian toilet cubicles, wash basins, plumbing, electrical, ventilation, door, and finishing works.
First Floor Women Waiting Room
Renovation works including floor tile replacement, wall finishing with painting, false ceiling, new door, electrical room access modifications, and related electrical and finishing works.
Fourth Floor Visitor Waiting Room
Renovation including floor tile replacement, wall finishing and painting, false ceiling, new door, electrical room access modifications, and related electrical and finishing works.
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Ground Floor Physically Challenged Friendly Restroom | Renovation of restroom including tile replacement, waterproofing, false ceiling, toilets, urinals, wash basins, plumbing, electrical works, ramp, door, and accessibility fittings. | 1,100 | sqft | chnstore2 | 20 | |
| 2 | First Floor Men Restroom | Restroom renovation with tile replacement, waterproofing, false ceiling, 3 WC cubicles, 4 urinals, wash basins, plumbing, electrical works, ventilation, door, and finishing. | 1,200 | sqft | chnstore2 | 20 | |
| 3 | First Floor Women Restroom | Restroom renovation with tile replacement, waterproofing, false ceiling, WC and Indian toilet cubicles, wash basins, plumbing, electrical works, ventilation, door, and finishing. | 925 | sqft | chnstore2 | 20 | |
| 4 | Second Floor Men Restroom | Restroom renovation including tile replacement, waterproofing, false ceiling, 3 WC cubicles, 4 urinals, wash basins, plumbing, electrical, ventilation, door, and finishing works. | 1,200 | sqft | chnstore2 | 20 | |
| 5 | Second Floor Women Restroom | Restroom renovation including tile replacement, waterproofing, false ceiling, Western & Indian toilets, wash basins, plumbing, electrical, ventilation, door, and finishing works. | 925 | sqft | chnstore2 | 20 | |
| 6 | Second Floor Women Officer Restroom | Restroom renovation with tile replacement, waterproofing, false ceiling, Western & Indian toilet cubicles, wash basins, plumbing, electrical, ventilation, door, access modifications, and finishing works. | 1,075 | sqft | chnstore2 | 20 | |
| 7 | Third Floor Men Restroom | Restroom renovation with tile replacement, waterproofing, false ceiling, 2 WC cubicles, 2 urinals, wash basins, sensor faucets, plumbing, electrical, ventilation, door, and finishing works. | 900 | sqft | chnstore2 | 20 | |
| 8 | Third Floor Women Restroom | Restroom renovation with tile replacement, waterproofing, false ceiling, Western & Indian toilet cubicles, wash basins, plumbing, electrical, ventilation, door, and finishing works. | 925 | sqft | chnstore2 | 20 | |
| 9 | Fourth Floor Men Restroom | Restroom renovation with tile replacement, waterproofing, false ceiling, 3 WC cubicles, 4 urinals, wash basins, plumbing, electrical, ventilation, door, and finishing works. | 1,175 | sqft | chnstore2 | 20 | |
| 10 | Fourth Floor Women Restroom | Restroom renovation including tile replacement, waterproofing, false ceiling, Western & Indian toilets, wash basins, plumbing, electrical, ventilation, door, and finishing works. | 925 | sqft | chnstore2 | 20 | |
| 11 | Fifth Floor Men Restroom | Restroom renovation including tile replacement, waterproofing, false ceiling, 3 WC cubicles, 4 urinals, wash basins, plumbing, electrical, ventilation, door, and finishing works. | 1,200 | sqft | chnstore2 | 20 | |
| 12 | Fifth Floor Women Restroom | Restroom renovation including tile replacement, waterproofing, false ceiling, Western & Indian toilet cubicles, wash basins, plumbing, electrical, ventilation, door, and finishing works. | 1,050 | sqft | chnstore2 | 20 | |
| 13 | First Floor Women Waiting Room | Renovation works including floor tile replacement, wall finishing with painting, false ceiling, new door, electrical room access modifications, and related electrical and finishing works. | 1,075 | sqft | chnstore2 | 20 | |
| 14 | Fourth Floor Visitor Waiting Room | Renovation including floor tile replacement, wall finishing and painting, false ceiling, new door, electrical room access modifications, and related electrical and finishing works. | 1,075 | sqft | chnstore2 | 20 |
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates demonstrating similar restroom/facility projects
Financial statements for last 2-3 years
EOI/technical bid documents
EMD payment receipt (₹3,37,500)
OEM authorizations or licenses (if applicable)
Company board resolutions or authorization letters for signing bids
Any other documents requested in ATC terms
Key insights about TAMIL NADU tender market
Bidders must submit the required documents (GST, PAN, experience certificates, financial statements) and the EMD of ₹3,37,500. The ATC imposes an option clause for ±25% quantities and joint liability for sub-contractors; ensure you meet these conditions and provide OEM authorizations if needed.
Required documents include GST certificate, PAN card, experience certificates for restroom projects, last 2-3 years financial statements, EMD receipt, technical bid, OEM authorizations, company authorization letters, and any ATC-specified forms.
Specific item-level technical specs are not provided; the tender lists 14 BOQ items with N/A details. Emphasize compliance-ready mobilization, site access, and reliable installation of restrooms across multiple floors as per contract terms.
The bid requires an EMD of ₹3,37,500. This amount should be submitted via a bank guarantee or online payment as per ATC, and it remains valid through bid evaluation.
Delivery period is defined by the original delivery order date; any extension due to the option clause must follow the (additional/original) × original period formula, with a minimum extension of 30 days.
Eligibility includes required EMD, GST registration, demonstrated experience in similar restroom or facility fit-outs, financial stability, and willingness to comply with assignment/sub-contract consent and joint liability as per ATC.
Prepare a bid package with all mandatory documents, OEM authorizations if applicable, and a technical bid addressing the 14 BOQ items (even if detailed specs are not listed). Ensure compliance with option clause and provide proof of capability to install on multiple floors.
The tender data does not specify explicit standards; bidders should rely on ATC specifics and general compliance with government procurement norms, ensuring quality assurances and any organization-specific certifications referenced in the bid documentation.
Sign up now to access all documents
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS