TenderDekho Logo
Active GEM

Procurement Opportunity: Supply Installation, Testing and Commissioning of Microprocessor based Standalone fire alarm contro

Bid Publish Date

08-Oct-2026, 9:22 am

Bid End Date

29-Oct-2026, 3:00 pm

Progress

Issue08-Oct-2026, 9:22 am
AwardPending

Nepa Mills Limited Nepanagar Burhanpur announces a tender for Supply Installation, Testing and Commissioning of Microprocessor based Standalone fire alarm control panel. , Supply Installation, Testing and Commissioning of Addressable Smoke Detector with inbuilt optical smoke sensors as per NFPA style 7 wiring complete with base and termination as required, Supply Installation, Testing and Commissioning of Addressable Manual Call Point as per NFPA style 7 wiring complete as required with backbox, Supply, Installation, Testing and Commissioning of Sounder Strobe, Supply, Installation, Testing and Commissioning of Addressable Single Output Module, suitable to drive conventional notification devices or other power required equipment, Supply, Installation, Testing and Commissioning of Loop Isolator Module, protection facility for addressable loop, Supply, Installation, Testing and Commissioning of 2C x 1. 5 sq mm FRLS Armored Cable. Quantity: 236. Submission Deadline: 29-10-2026 15: 00: 00. Last date to apply is approaching fast!

Advertisement

Tender Data

Bid Details

Quantity

236

Category

Supply, Installation, Testing and Commissioning of 2C x 1.5 sq mm FRLS Armored Cable

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

H1-Highest Priced Bid Elimination

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

Yes

Startup Exemption/Relaxation

Yes

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

1

Past Performance

30 %

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

Supply Installation, Testing and Commissioning of Microprocessor based Standalone fire alarm control panel. , Supply Installation, Testing and Commissioning of Addressable Smoke Detector with inbuilt optical smoke sensors as per NFPA style 7 wiring complete with base and termination as required , Supply Installation, Testing and Commissioning of Addressable Manual Call Point as per NFPA style 7 wiring complete as required with backbox , Supply, Installation, Testing and Commissioning of Sounder Strobe , Supply, Installation, Testing and Commissioning of Addressable Single Output Module, suitable to drive conventional notification devices or other power required equipment , Supply, Installation, Testing and Commissioning of Loop Isolator Module, protection facility for addressable loop , Supply, Installation, Testing and Commissioning of 2C x 1.5 sq mm FRLS Armored Cable

Advisory Bank

Bank of India

ePBG Percentage

3%

ePBG Duration (Months)

3

Payment Timelines

Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

15

Delivery Locations

1

Delivery Cities

Burhanpur

Delivery Pincodes

450221

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Sanjay Sugandhi450221,NEPA LIMITED NEPANAGARBurhanpurMadhya Pradesh450221115-

Authority Records

MINISTRY OF HEAVY INDUSTRIESHEAVY INDUSTRY DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9994766.pdf

Main Document

Other Documents

OTHER

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Bill of Quantities (BOQ) 7 Items Sign in for GEM prices

#1

Supply Installation, Testing and Commissioning of Microprocessor based Standalone fire alarm control panel.

Supply Installation, Testing and Commissioning of Microprocessor based Standalone fire alarm control panel. Each loop capable of taking minimum 1 9 8 detector and devices, 6 x40 character (2 40 x 64 Pixels blue graphical liquid crystal display (LCD) with backlight illumination & alpha-numeric keypad to offer clear menu navigation and quick configuration. The penal shall be addressable type. The panel shall be able give pin point location of all fire / fault conditions. The panel must be able to automatically switch off respective control switches whenever any alarm is triggered. The penal shall have in built rectifier, loop cards LCD unit to indicate fire /fault signal with address internal event log capacity of 500 to 999 non- volatile events complete in all respects with battery backup DXc1-M

1 nos Delivery: 15 days
#2

Supply Installation, Testing and Commissioning of Addressable Smoke Detector with inbuilt optical smoke sensors as per NFPA style 7 wiring complete with base and termination as required

Supply Installation, Testing and Commissioning of Addressable Smoke Detector with inbuilt optical smoke sensors as per NFPA style 7 wiring complete with base and termination as required (HM-PSEAP + MI/B501AP/IV)

27 nos Delivery: 15 days
#3

Supply Installation, Testing and Commissioning of Addressable Manual Call Point as per NFPA style 7 wiring complete as required with backbox

Supply Installation, Testing and Commissioning of Addressable Manual Call Point as per NFPA style 7 wiring complete as required with backbox (HM-MCP-GI+BB)

2 nos Delivery: 15 days
#4

Supply, Installation, Testing and Commissioning of Sounder Strobe

Supply, Installation, Testing and Commissioning of Sounder Strobe (9 7 dB(A) + or - 3 dB At sign 1 meter 2) (WSS-PRNO5 + MI/B5 0 1 AP/IV)

2 nos Delivery: 15 days
#5

Supply, Installation, Testing and Commissioning of Addressable Single Output Module, suitable to drive conventional notification devices or other power required equipment

Supply, Installation, Testing and Commissioning of Addressable Single Output Module, suitable to drive conventional notification devices or other power-required equipment in 4-wire mode by external 24VDC power supply and also capable to provide dry contact output in loop-powered mode. Maximum 1 A output current. This Shall Include all accessories like additional power supply, relays etc. complete as required for services integration (MI /DCMOE).

2 nos Delivery: 15 days
#6

Supply, Installation, Testing and Commissioning of Loop Isolator Module, protection facility for addressable loop

Supply, Installation, Testing and Commissioning of Loop Isolator Module, protection facility for addressable loop, can isolate shorted circuit from complete loop to ensure normal operation of other parts (MI/DISO).

2 nos Delivery: 15 days
#7

Supply, Installation, Testing and Commissioning of 2C x 1.5 sq mm FRLS Armored Cable

Supply, Installation, Testing and Commissioning of 2C x 1.5 sq mm FRLS Armored Cable

200 mtr Delivery: 15 days

Categories 56

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Additional Doc 1 (Requested in ATC)

5

Additional Doc 2 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria

6

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Advertisement