Bid Publish Date
01-Sep-2025, 1:33 pm
Bid End Date
29-Sep-2025, 2:00 pm
Location
Progress
RAPublic procurement opportunity for Special Protection Group (spg) BR Lectern with BIS Leel-VI Ballistic Protection in SOUTH WEST DELHI, DELHI. Quantity: 5 issued by. Submission Deadline: 29-09-2025 14: 00: 00. View full details and respond.
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | INDIAN ARMOUR SYSTEMS PRIVATE LIMITED. Under PMA | Make : Indian Armour Model : BR Lectern with BIS Leel-VI Ballistic Protection Title : BR Lectern with BIS Leel-VI Ballistic Protection | 22-09-2025 10:49:06 | |
| 2 | SMPP LIMITED Under PMA | Make : SMPP--SMPP PRIVATE LIMITED Model : Bullet Proof Lectern (BIS Level-6) Title : BR Lectern with BIS Leel-VI Ballistic Protection | 22-09-2025 13:46:15 |
These are the final prices after the reverse auction event. Prices may be lower than initial bids.
| Rank | Seller | Final Price | Item |
|---|---|---|---|
| L1 | SMPP LIMITED(MII) Under PMA Winner | ₹1,11,98,250 | Item Categories : BR Lectern with BIS Leel-VI Ballistic Protection |
| L2 | INDIAN ARMOUR SYSTEMS PRIVATE LIMITED. (MSE,MII) Under PMA | ₹1,12,00,000 | Item Categories : BR Lectern with BIS Leel-VI Ballistic Protection |
🎉 L1 Winner
SMPP LIMITED(MII) Under PMA
Final Price: ₹1,11,98,250
Start
08-Oct-2025, 6:00 pm
End
13-Oct-2025, 12:36 pm
Duration: 115 hours
Reverse Auction Document
✅ RA concluded. Check financial results for final rankings.
Quantity
5
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
RA Qualification Rule
50% Lowest Priced Technically Qualified Bidders
Tech Clarification Time
2 Days
Min. Avg. Annual Turnover
90
OEM Avg. Turnover
90
Past Performance
20 %
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
BR Lectern with BIS Leel-VI Ballistic Protection
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
TECHNICAL
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Extended Deadline
29-Sep-2025, 8:30 am
Opening Date
29-Sep-2025, 9:00 am
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
OEM Annual Turnover
Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer