The opportunity is issued by a joint venture comprising CIL, NTPC, IOCL, FCIL & HFCL for the procurement of a mechanical governor for a CO2 compressor, main lube oil pump, and steam turbine (S20-K 1001- family). Location: Dhanbad, Jharkhand (826001). No explicit quantity or estimated value disclosed; bidders must rely on contract terms and BOQ absence. Key differentiator includes a structured option clause allowing quantity variations up to 25%, with delivery timing calculated from original delivery periods. Bidders must prepare data sheets, OEM authorizations, and banking documents for vendor code creation. The tender emphasizes GST compliance and supplier invoicing in the consignee’s name.
Product/service names: mechanical governor for CO2 compressor; main lube oil pump; steam turbine (S20-K 1001-
Key documents: PAN, GSTIN, cancelled cheque, EFT mandate; data sheet alignment with bid
Standards/_certifications: OEM authorization for distributors; GST-compliant invoicing; data sheet verification
Delivery considerations: option clause allows 25% quantity variation; delivery time calculated formula with minimum 30 days
Quality/verification: data sheet must match technical parameters; mismatch may lead to bid rejection
Option clause allows up to 25% quantity variation at contract time and during currency
Invoices must be issued in consignee GSTIN; GST reimbursement as actuals or capped
Data sheet alignment and OEM authorization are mandatory
GST reimbursement as actuals or per quoted rate; no responsibility for GST amount beyond quoted rate
Delivery period starts from the last date of original delivery order; option clause adjusts time with minimum 30 days
Buyer reserves right to terminate; penalties not specified in data; contract risk borne by bidder
PAN and GSTIN registered bidder
OEM authorization required for distributors
Ability to supply data sheet aligned with offered product
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Procurement of mechanical governor for CO2 compressor main lube oil pump-steam turbine (S20-K 1001-
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Copy of PAN Card
Copy of GSTIN
Copy of Cancelled Cheque
Copy of EFT Mandate certified by Bank
Data Sheet of offered product
Manufacturer Authorization / OEM details for distributors
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | ****** Under PMA | Item Categories : Procurement of mechanical governor for CO2 compressor main lube oil pump-steam turbine (S20-K 1001- |
Key insights about JHARKHAND tender market
Bidders must submit PAN, GSTIN, Cancelled Cheque, and EFT Mandate along with the data sheet for the offered governor. OEM authorization is required for distributors, and invoices must reflect the consignee GSTIN. Ensure data sheet matches technical parameters; apply the 25% quantity variation rule if needed and adhere to delivery timelines linked to the original order.
Required documents include: PAN Card, GSTIN, Cancelled Cheque, EFT Mandate certified by bank, Data Sheet of offered product, and Manufacturer Authorization for distributors. These files enable vendor code creation and enable GST-compliant invoicing to the consignee, reducing bid rejection risk.
The purchaser may increase or decrease bid quantity by up to 25% at contract placement and during currency at contracted rates. Delivery time scales with the formula (increase quantity/original quantity) × original delivery period, with a minimum of 30 days; extended delivery may be approved within original period.
Distributors must furnish an OEM authorization with complete details (name, designation, address, email, phone). The bid also requires the data sheet to be aligned to offered product parameters; mismatches may lead to rejection. Ensure OEM authorization covers the specified governor system components.
GST is to be checked by bidders; reimbursement will be based on actual GST or the lower of the quoted GST rate. The invoicing must be in the consignee’s GSTIN, ensuring GST compliance is traceable in payment processing.
A mismatch between the data sheet and offered product parameters will render the bid liable for rejection. Bidders must upload accurate data sheets and ensure all technical parameters are verifiable against the offered governor system and related components.
Delivery terms start from the original order's last date; option quantity increases may extend delivery accordingly. The buyer reserves the right to terminate the contract and adjust quantities; bidders should align with the stated delivery cadence and be prepared for potential termination under contract clauses.