Bid Publish Date
23-Oct-2026, 6:30 pm
Bid End Date
02-Nov-2026, 7:00 pm
Location
Progress
The Central Board Of Direct Taxes (CBDT), Department Of Revenue, invites bids from suppliers for Split Air Conditioner, Wall Mount Type ISI Marked to IS 1391 (Part 2), for procurement in Raipur, Chhattisgarh (492001). The tender emphasizes ISI marking compliance and wall-mount configuration (V3). The contract accounts for a flexible quantity under an option clause allowing up to 25% increase/decrease during the contract and currency, with delivery timelines linked to the original delivery order and extended periods. The BOQ lists 0 items, indicating a potential framework or single-lot purchase with no predefined itemization in the available data. Key differentiator includes strict adherence to ISI standards for air conditioning equipment and a procurement scope governed by option-based delivery extensions. Unique aspects include the formal option clause and delivery-time calculations based on the original quantity and delivery period.
Product: Split air conditioner, wall mount, ISI marked
Standard: IS 1391 (Part 2) for wall-mounted split ACs, V3
Certification: ISI marking required; OEM authorization may be needed
Delivery: 25% quantity variation; minimum 30 days for extended delivery
Location: Raipur, Chhattisgarh; installation readiness considered
BOQ: Not specified; prepare for non-itemized procurement
Option clause allows ±25% quantity change at contract and during currency
Delivery period tied to last date of original DO with 30-day minimum extension
ISI 1391 Part 2 Q2 compliance mandatory for all units
Up to 25% fluctuation in quantity at bid/contract; delivery timeline adjusts per formula with minimum 30 days.
All split ACs must be ISI marked to IS 1391 Part 2; validation via OEM authorization may be required.
Buyer uploaded ATC document; bidders must review for additional specific terms.
Experience in supplying ISI marked air conditioning units to government or large organizations
Demonstrated capability to meet ISI 1391 Part 2 Q2 standards
Financial stability sufficient for performance under potential 25% quantity variations
Quantity
7
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Split Air Conditioner, Wall Mount Type (V3) ISI Marked to IS 1391 (Part 2) (Q2)
Max Delivery Days
45
Delivery Locations
1
Delivery Cities
Raipur
Delivery Pincodes
492001
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| N Ravi Shankar | 492001,INCOMETAX OFFICE NEW CENTRAL REVENUE BUILDING CIVIL LINE RAIPUR | Raipur | Chhattisgarh | 492001 | 7 | 45 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar AC supply projects
Financial statements or liquidity proof
EMD submission proof (if required by ATC)
Technical bid documents demonstrating ISI 1391 Part 2 Q2 compliance
OEM authorization or dealership certificate for ISI marked ACs
Any ISI/BIS/ISI-related compliance certificates
Key insights about CHHATTISGARH tender market
Bidders should verify ISI 1391 Part 2 Q2 compliance, submit GST, PAN, and financials, provide OEM authorizations, and ensure installation capabilities. The ATC may include additional terms; confirm ISI certification and delivery timelines including 25% quantity option.
Required documents include GST certificate, PAN, experience certificates for similar AC supply, financial statements, EMD proof if demanded, ISI/OEM authorizations, and technical bid demonstrating ISI 1391 Part 2 Q2 compliance and wall-mount configuration suitability.
Units must be ISI marked and conform to IS 1391 Part 2, with V3 wall-mount configuration. Compliance proof from the original equipment manufacturer or authorized dealer is typically required, along with installation and warranty details.
The buyer may adjust quantity up to 25% of bid/contract quantity. Delivery schedules shift based on the last DO date with a calculated extension time, minimum 30 days, ensuring project continuity even with changes.
Delivery starts from the last date of the original delivery order. If an extension is triggered, the additional time equals (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days.
Bidders should provide OEM authorization or dealership certificates proving they are authorized to supply ISI marked wall-mount split ACs meeting IS 1391 Part 2 standards, along with installation/service capability.
Expect installation readiness, correct wall-mount configuration, and standard warranty coverage as per OEM terms. Details will be specified in the ATC; ensure you can provide timely service and AMC if required.
ATC may contain additional terms beyond the standard conditions, including specific delivery, penalty, or compliance requirements. Bidders must view the ATC file to capture all obligations before submission.