Bharat Petroleum Corporation Ltd Earthing Relay SITC & Cable Installation Tender Nalgonda Telangana 2026

Bid Publish Date

09-Aug-2026, 12:44 am

Bid End Date

21-Aug-2026, 5:00 pm

Value

₹16,50,000

Progress

Issue09-Aug-2026, 12:44 am
AwardPending

Tender Overview

Bharat Petroleum Corporation Ltd invites bids for SITC of earthing relay installation at Malkapur, Yadadri Bhuvanagiri District, Telangana 508252 and Ennore Coastal Installation, Chennai, Tamil Nadu 600120. The scope covers earthing relay installation, supply and laying of power and signal cables, cable glands, and structural steel supports fabrication/painting/installation. Estimated contract value is ₹1,650,000. The award allows a quantity variation up to 25% and delivery timing adjustments proportional to added quantity, with a minimum extension of 30 days. Detailed drawings must be approved within 5 days of award, with design modifications provided within 5 days if needed. Notable delivery addresses include BPCL Malkapur POL Installation and BPCL Ennore Coastal Installation. This procurement emphasizes on-site installation, fabrication, and compliance with buyer-approved drawings, ensuring non-obsolescence and OEM market-life reliability for at least 3 years. The tender also requires vendor-code readiness with specific KYC documents.

Technical Specifications & Requirements

  • Product scope: earthing relay SITC, power/signal cable supply and laying, gland installation, structural steel fabrication/painting/installation
  • Delivery locations: BPCL Malkapur POL Installation (Telangana) and Ennore Coastal Installation (Chennai)
  • Approval timeline: Detailed Design Drawings approval within 5 days of award; buyer to respond within 5 days with modifications
  • Variation clause: +/- 25% quantity with proportional delivery extension; minimum extra time 30 days
  • Documentation: Data Sheet for offered products; Vendor Code creation documents (PAN, GSTIN, cancelled cheque, EFT mandate) and GST considerations; GST is reimbursed as actuals or applicable rate
  • Qualification: Non-obsolescence with at least 3 years residual market life on offered products
  • EMD/Financials: EMD not specified in data; financial readiness implied by GST/PAN submission
  • BOQ: 7 items listed but with no quantitative detail; scope remains tied to above categories

Terms, Conditions & Eligibility

  • Option Clause: 25% quantity increment/decrement allowed; extended delivery time calculated as (Increased quantity / Original quantity) × Original delivery period, min 30 days
  • Delivery & Installation: On-site at specified BPCL locations; installation/commissioning included if within scope
  • Documentation: PAN, GSTIN, cancelled cheque, EFT mandate; Data Sheet submission required
  • GST: Bidder bears GST implications; reimbursement as actuals or at applicable rate
  • Drawing approvals: 5-day window for Detailed Design Drawings; no LD for buyer-delayed approvals
  • Market-life requirement: Offered products must have at least 3 years residual life; no obsolescence
  • Addresses: Detailed delivery addresses provided in T&C; ensure on-site access for installation

Key Specifications

  • earthing relay SITC

  • supply and laying of power cable

  • supply and laying of signal cable

  • cable gland installation

  • fabrication, painting and installation of structural steel supports

  • multiple onsite installation locations in Telangana and Tamil Nadu

  • Detailed Design Drawings within 5 days of award; approval or modification list within 5 days

Terms & Conditions

  • 25% quantity variation rights at contract placement and during currency

  • 3 years residual market life requirement for offered items

  • Detailed Design Drawings approval within 5 days; no LD for buyer delays

Important Clauses

Delivery Terms

Delivery period adjusts with quantity variation; minimum additional time 30 days; delivery starts from last date of original delivery order

Payment Terms

GST payable by bidder per actuals or applicable rates; GST reimbursement conditions apply

Warranty & Obsolescence

Products must not be end-of-life before a 3-year residual market life; post-delivery warranty terms to be specified in drawings

Bidder Eligibility

  • Non-obsolete product with at least 3 years residual life

  • Ability to perform on-site installation at BPCL locations in Telangana and Tamil Nadu

  • Submit PAN, GSTIN, cancelled cheque, EFT mandate for vendor-code creation

Authority & Contact

Tender Data

Bid Details

Quantity

1280

Category

SITC of earthing relay Malkapur installation Hyderabad

Bid Type

Single Packet Bid

Bid Validity

60 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

Yes

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

6

Past Performance

50 %

Warranty Period

1 years

Experience Required

1 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

SITC of earthing relay Malkapur installation Hyderabad , SITC of earthing relay Ennore Coastal installation installation chennai , Sypply and laying of Power cable , Supply and laying of signal cable , Supply and installation cable gland , Supply, fabrication, painting and installation of structural steel supports for earthing relays Malkapur Installation

Advisory Bank

State Bank of India

ePBG Percentage

5%

ePBG Duration (Months)

18

Payment Timelines

Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

30

Delivery Locations

1

Delivery Cities

Yadadri Bhuvanagiri

Delivery Pincodes

508252

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Suryan K R508252,Bharat Petroleum Corporation Ltd, Malkapur Terminal, Sy No 617, Dandu Malkapur village, Choutuppal Mandal, yadadri bhuvanagiriYadadri BhuvanagiriTelangana5082521230-

Authority Records

MINISTRY OF PETROLEUM AND NATURAL GASBHARAT PETROLEUM CORPORATION LTD

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9726001.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 7 Items Sign in for GEM prices

#1

SITC of earthing relay Malkapur installation Hyderabad

SITC of earthing relay Malkapur installation Hyderabad

12 nos Delivery: 30 days
#2

SITC of earthing relay Ennore Coastal installation installation chennai

SITC of earthing relay Ennore Coastal installation installation chennai

16 nos Delivery: 30 days
#3

Sypply and laying of Power cable

3 core 2.5 sq mm FRLS armoureda at malkapur installation

420 rm Delivery: 30 days
#4

Supply and laying of signal cable

1 pair 1.5 Sqmm FRLS armoured at malkapur installation

420 rm Delivery: 30 days
#5

Supply and installation cable gland

1.5 inch NPT 11- 16 OD Peso approved for Malkapur installation

48 nos Delivery: 30 days
#6

Supply and installation cable gland

1.5 inch NPT 11- 16 OD Peso approved for Ennore coastal installation

64 nos Delivery: 30 days
#7

Supply, fabrication, painting and installation of structural steel supports for earthing relays Malkapur Installation

(ISMC 100 support post with 150x150x10 mm base plate and 25x3mm angles for mounting relay post overall height 1500mm)

300 kg Delivery: 30 days

Categories 26

Required Documents

1

PAN Card copy

2

GSTIN copy

3

Cancelled cheque copy

4

EFT mandate certified by bank

5

Details of Data Sheet for offered products

6

Vendor Code Creation documents

7

GST adherence documentation and any applicable tax certificates

8

Evidence of non-obsolescence/3-year residual market life

Frequently Asked Questions

Key insights about TELANGANA tender market

How to bid for BPCL earthing relay SITC tender in Telangana 2026

Bidders must submit PAN, GSTIN, cancelled cheque, and EFT mandate for vendor-code creation, plus a Data Sheet for offered products. Include Detailed Design Drawings within 5 days of award and be prepared for a 25% quantity variation at contracted rates. Ensure non-obsolescence and 3-year residual market life.

What documents are required for BPCL cable installation bid in Chennai 2026

Required documents include PAN, GSTIN, cancelled cheque, EFT mandate, Data Sheet of offered products, and vendor-code creation materials. GST handling is bidder-driven, with reimbursement as actuals or applicable rate. Ensure on-site capability at Ennore Coastal Installation location.

What are the technical requirements for BPCL earthing relay SITC tender

Technical scope covers earthing relay SITC, supply/laying of power and signal cables, gland installation, and structural steel supports. Drawings must be approved within 5 days of award; delivery timing may extend if drawings require modification per buyer feedback.

When is the delivery timeline and option clause for BPCL procurement

Delivery period starts from the last date of original delivery order; quantity may be increased up to 25% with proportional delivery extension, minimum 30 days. If original period is under 30 days, extension equals the original period.

What is the estimated contract value for BPCL Telangana Chennai SITC

The estimated value is ₹1,650,000. Bidders should plan resources accordingly, factoring potential 25% variation in quantity and related delivery extensions as per option clause.

What is required for vendor-code creation in BPCL tenders 2026

Submit PAN, GSTIN, cancelled cheque, and EFT mandate; ensure GST handling compliance. These documents enable on-boarding as a registered BPCL vendor for multi-location installation work.

What guarantees exist for obsolescence and residual life in BPCL bids

Bidders must guarantee products have at least 3 years residual market life and must not be declared end-of-life by the OEM during this period; provide evidence via OEM documentation and product datasheets.

How to submit Detailed Design Drawings for BPCL projects

Submit Detailed Design Drawings within 5 days of award; BPCL will respond with approval or a complete modification list within 5 days. Delays by BPCL may extend delivery without LD, but drawings must be finalized before fabrication.