Bid Publish Date
07-Oct-2026, 12:58 pm
Bid End Date
17-Oct-2026, 1:00 pm
Value
₹4,00,000
Location
Progress
The Uttar Pradesh Power Corporation Limited (UPPCL) invites service providers for repair, maintenance and installation support, including preliminary surveys and transmission line surveys, in Banda, Uttar Pradesh. Estimated value is ₹400,000. Scope appears to be service provider oriented with focus on survey and field maintenance across plant/systems/equipments. The procurement is conducted under the Energy Department Uttar Pradesh framework, with no BOQ items published. The tender emphasizes service delivery capability for field surveys and installation activities, and the award will depend on ATC-compliant bids and demonstrated capability to execute survey tasks locally in Banda. The absence of explicit start/end dates and no listed BOQ items suggests a streamlined, service-oriented procurement with emphasis on local contractor readiness and compliance with buyer terms.
EMD: amount not specified; bidders should verify via ATC
Delivery terms: site-based surveys in Banda; mobilization readiness required
Payment terms: not disclosed; anticipate contract terms per ATC
Not specified in data; bidders should refer to ATC for milestone-based or upfront payment conditions.
Site-based preliminary survey and transmission line survey to be conducted within Banda district; detailed schedule to be provided in ATC.
Not specified; ATC may include LD for delays or non-compliance post-award.
Demonstrated experience in survey and maintenance services for transmission lines and plant equipment
Ability to mobilize quickly to Banda, UP
Financial capability to execute a ~₹4 lakh contract and provide required EMD
Quantity
1
Bid Type
Two Packet Bid
Bid Validity
90 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Tech Clarification Time
2 Days
EMD Required
No
MII Compliance
Yes
MSE Purchase Preference
No
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Min. Avg. Annual Turnover
10
Experience Required
5 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Service
Bid To RA
No
Bid To RA Enabled
No
Item Category
Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - Preliminary survey; survey of transmission line; Service Provider
Delivery Locations
1
Delivery Cities
Banda
Delivery Pincodes
210001
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Ajay Kumar Srivastava | 210001,ELECTRICITY TRANSMISSION CIRCLE 220 KV SUB STATION TINDWARI ROAD BANDA 210001 | Banda | Uttar Pradesh | 210001 | Project / Lumpsum Based | - | Estimated Cost of Spare/Consumable s/Items on Reimbursement basis in Rs (please input 0 if not applicable) : 0 |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar repair/maintenance and survey projects
Financial statements for the last 2-3 years
EMD/Security deposit submission proof (as per ATC)
Technical bid documents demonstrating service capability
OEM authorization letters (if applicable)
Key insights about UTTAR PRADESH tender market
Bidders should prepare standard documents (GST, PAN, experience proofs, financials) and submit EMD as per ATC. Ensure your firm can perform preliminary surveys and transmission line surveys locally in Banda, with documentation demonstrating prior similar projects and compliance with buyer terms.
Required documents typically include GST certificate, PAN card, experience certificates, financial statements, EMD proof, technical bid, and OEM authorizations if applicable. Verify with ATC for any additional bidder-specific requirements before submission.
Scope covers preliminary survey, survey of transmission lines, and repair/maintenance/installation for plant/equipment. No detailed BOQ published; bidders must demonstrate capability through past projects and provide methodology for field surveys and installation support.
No explicit deadline is provided in the public data. Bidders should consult the ATC document uploaded by the buyer for exact submission dates and ensure submission before the stated cut-off once released.
EMD amount is not disclosed in the available data. Bidders should refer to the ATC terms for the exact EMD or security deposit requirements and submission method.
The tender data does not specify standards. Bidders should be prepared to comply with typical UPPCL practices and ATC terms; ensure readiness to present project execution capabilities and relevant certifications if requested.
Prepare a mobilization plan detailing local resource availability, equipment readiness, safety procedures, and contingency timelines. Align with ATC requirements and provide a clear schedule for preliminary survey activities in Banda district.