SCHMERSAL MAKE STRIKER TYPE LIMIT SWITCH PART NO. 101170498,SCHMERSAL MAKE STRIKER TYPE LIMIT SWITC
Bhilai Steel Plant
DURG, CHHATTISGARH
Bid Publish Date
28-Dec-2025, 1:44 pm
Bid End Date
14-Jan-2026, 2:00 pm
Location
Progress
Quantity
20
Bid Type
Two Packet Bid
Bharat Heavy Electricals Limited invites bids for LIMIT SWITCH N. STD: IS 6875 under the Department of Heavy Industry framework. The procurement scope is limited to the supply of Goods (no services) and follows an option clause allowing a ±25% quantity adjustment at contract award and during the currency of the contract. The policy includes an MSE purchase preference, with eligibility tied to manufacturer status for goods and documentary evidence for services. The BOQ shows no items listed, indicating a potentially consolidated or forthcoming requirement. This tender centers on standardized limit switches conforming to IS 6875 and related procurement policies, with emphasis on adherence to the specified standard and supplier capability to deliver at the contracted terms. Unique aspects include the option-driven quantity variation and MSE preference mechanism, aimed at ensuring competitive pricing and reliable supply.
Product/service: LIMIT SWITCH N. STD: IS 6875 (switch procurement)
Quantity: not specified in BOQ; confirm in final tender response
EMD/estimated value: not provided in data; refer to official tender documents
Experience: manufacturer status required for MSE preference
Quality/Certification: IS 6875 compliance; ISI/ISO certificates if specified in ATC
Delivery: period aligned with option clause; minimum 30 days if extended
Warranty/Support: not stated; verify in terms and conditions
Option Clause allows quantity variation up to 25% during contract
MSE purchase preference applies to eligible manufacturers of goods
Supply scope is Goods-only; installation not included unless stated
Payment terms to be defined in the main bid document; ensure alignment with purchase order and contract schedules.
Delivery period commences from the last date of original delivery order; extended periods possible under option clause with minimum 30 days.
LD/penalties details to be confirmed in ATC; bidders should review for delivery delays and non-conformance.
Must be the manufacturer to claim MSE purchase preference for goods
Traders are excluded from MSE eligibility for goods
Evidence of IS 6875 compliance and OEM authorizations where applicable
Bhilai Steel Plant
DURG, CHHATTISGARH
Salem Steel Plant
SALEM, TAMIL NADU
National Aluminium Company Limited, Bhubaneswar
KORAPUT, ODISHA
Indian Coast Guard
THIRUVANANTHAPURAM, KERALA
Bharat Heavy Electricals Limited (bhel)
TIRUCHIRAPPALLI, TAMIL NADU
Tender Results
Loading results...
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar limit switch supply (if applicable)
Financial statements (latest audited/unaudited as required)
EMD submission proof (as per tender)
Technical bid documents showing IS 6875 compliance
OEM authorization letter (where applicable)
Purchase preference documents for MSEs (if claiming benefits)
Extended Deadline
14-Jan-2026, 2:00 pm
Opening Date
14-Jan-2026, 2:30 pm
Key insights about UTTARAKHAND tender market
Bidders should first verify IS 6875 compliance for LIMIT SWITCH N. STD and verify eligibility for MSE preference if manufacturer-qualified. Prepare GST, PAN, OEM authorizations, financials, and experience certificates. Upload technical bid with IS 6875 conformity and await ATC confirmation before submission.
Note: The tender allows quantity adjustments up to 25%, so plan for flexible orders and confirm delivery timelines with the contract officer.
Required documents include GST registration, PAN, latest financial statements, experience certificates, OEM authorization letters, and IS 6875 compliance certificates. MSE eligibility requires manufacturer proof; service-related evidence if applicable. Ensure all documents are uploaded with the bid and cross-checked against ATC requirements to avoid rejection.
The tender seeks LIMIT SWITCH N. STD: IS 6875 compliant devices; ensure the exact IS 6875 standard is met, including electrical ratings, mechanical dimensions, mounting patterns, and contact configurations as specified in the tender and ATC. Confirm any OEM part numbers and performance ratings demanded by BHEL.
Delivery terms are tied to the last date of the original delivery order; if the option clause is exercised, the extended delivery time uses (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days. The buyer may extend within contract limits, so plan buffer stock accordingly.
MSE preference applies to eligible manufacturers of the offered goods; if L-1 price exceeds MSE threshold by 15% within policy bands, the MSE seller may be invited to match L-1 and obtain up to 25% of total value. Traders cannot claim MSE benefit for goods.
Payment terms are defined in the main bid document and ATC; bidders should anticipate standard government terms, potentially including milestones tied to delivery or acceptance. Verify whether upfront, milestone-based, or post-delivery payments apply and align with contract schedules.
Scope is limited to the supply of goods only, with no installation or after-sales service included unless explicitly stated in the ATC. Bidders must deliver tested, IS 6875-compliant limit switches to the specified destinations within the agreed delivery window.
Verify that the offered limit switches have an IS 6875 certificate or conformity declaration from a recognized body. Include test reports, OEM datasheets, and any BIS certifications if applicable. Cross-check electrical ratings, mechanical dimensions, and mounting compatibility with BHEL requirements.
Sign up now to access all documents
Main Document
OTHER
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS