GEM

Bharat Heavy Electricals Limited Switch N. STD IS 6875 Tender 2025 DIN BHEL procurement

Bid Publish Date

28-Dec-2025, 1:44 pm

Bid End Date

14-Jan-2026, 2:00 pm

Latest Corrigendum Available

Progress

Issue28-Dec-2025, 1:44 pm
Corrigendum07-Jan-2026
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

20

Bid Type

Two Packet Bid

Key Highlights

  • IS 6875 compliance required for limit switch procurement
  • Option clause enables ±25% quantity adjustment at contract/ currency
  • MSE purchase preference available for eligible manufacturers of offered goods
  • Supply-only scope; installation/maintenance not included unless specified
  • Documentation: mandatory certificates, OEM authorizations, GST, PAN, financials
  • Delivery schedule linked to original and extended delivery periods with minimum 30 days
  • ATC/Bid Document clarifies certificate submission and eligibility criteria

Categories 4

Tender Overview

Bharat Heavy Electricals Limited invites bids for LIMIT SWITCH N. STD: IS 6875 under the Department of Heavy Industry framework. The procurement scope is limited to the supply of Goods (no services) and follows an option clause allowing a ±25% quantity adjustment at contract award and during the currency of the contract. The policy includes an MSE purchase preference, with eligibility tied to manufacturer status for goods and documentary evidence for services. The BOQ shows no items listed, indicating a potentially consolidated or forthcoming requirement. This tender centers on standardized limit switches conforming to IS 6875 and related procurement policies, with emphasis on adherence to the specified standard and supplier capability to deliver at the contracted terms. Unique aspects include the option-driven quantity variation and MSE preference mechanism, aimed at ensuring competitive pricing and reliable supply.

Technical Specifications & Requirements

  • Product: LIMIT SWITCH N. STD: IS 6875; procurement of Switches conforming to the IS standard mentioned.
  • Standard: IS 6875 for limit switches; ensure compliance with the exact standard code.
  • Scope: Supply of Goods only; no installation or after-sales service included unless stated.
  • Quantity Scope: Tender allows up to 25% increase/decrease in order quantity at contract placement and during currency, with delivery timelines calculated as specified by the option clause (minimum 30 days if extended).
  • Purchase Preference: Ongoing Centre policy for MSEs with documentation proving manufacture status for goods, enabling up to 25% of total contract value to be awarded to eligible MSEs if L-1 price gap criteria are met.
  • Documentation: Upload required certificates and compliance documents with bid. (See ATC for full list).

Terms, Conditions & Eligibility

  • EMD/Financials: Not explicitly specified in data; bidders should refer to the main bid document for exact EMD and financial documentation.
  • Delivery: Delivery period is tied to the delivery schedule clause; ensure readiness for potential extended delivery timelines under option clause.
  • Payment: Payment terms not disclosed in the provided text; bidders must consult the full tender and ATC for terms.
  • Warranty/Penalties: Not specified here; verify in the main terms and conditions and ATC.
  • Documents Required: GST, PAN, experience certificates, OEM authorizations, financial statements, technical compliance certificates; ensure these are uploaded per bid requirements.
  • Eligibility: Manufacturer status required for MSE preference; traders excluded from MSE eligibility for goods; services eligibility based on service provision status.

Key Specifications

  • Product/service: LIMIT SWITCH N. STD: IS 6875 (switch procurement)

  • Quantity: not specified in BOQ; confirm in final tender response

  • EMD/estimated value: not provided in data; refer to official tender documents

  • Experience: manufacturer status required for MSE preference

  • Quality/Certification: IS 6875 compliance; ISI/ISO certificates if specified in ATC

  • Delivery: period aligned with option clause; minimum 30 days if extended

  • Warranty/Support: not stated; verify in terms and conditions

Terms & Conditions

  • Option Clause allows quantity variation up to 25% during contract

  • MSE purchase preference applies to eligible manufacturers of goods

  • Supply scope is Goods-only; installation not included unless stated

Important Clauses

Payment Terms

Payment terms to be defined in the main bid document; ensure alignment with purchase order and contract schedules.

Delivery Schedule

Delivery period commences from the last date of original delivery order; extended periods possible under option clause with minimum 30 days.

Penalties/Liquidated Damages

LD/penalties details to be confirmed in ATC; bidders should review for delivery delays and non-conformance.

Bidder Eligibility

  • Must be the manufacturer to claim MSE purchase preference for goods

  • Traders are excluded from MSE eligibility for goods

  • Evidence of IS 6875 compliance and OEM authorizations where applicable

Past Similar Tenders (Historical Results)

5 found

SCHMERSAL MAKE STRIKER TYPE LIMIT SWITCH PART NO. 101170498,SCHMERSAL MAKE STRIKER TYPE LIMIT SWITC

Bhilai Steel Plant

DURG, CHHATTISGARH

Posted: 14 July 2025
Closed: 24 July 2025
GEM

LIMIT SWITCH EQ: JB2700

Salem Steel Plant

SALEM, TAMIL NADU

Posted: 28 August 2025
Closed: 19 September 2025
GEM

1.82636251440 Adjustable Lever Limit Switch

National Aluminium Company Limited, Bhubaneswar

KORAPUT, ODISHA

Posted: 16 April 2025
Closed: 30 April 2025
GEM

LIMIT SWITCH (PART NO 20055)

Indian Coast Guard

THIRUVANANTHAPURAM, KERALA

Posted: 17 July 2025
Closed: 12 August 2025
GEM

974604510000 - LIMIT SWITCH-2NO+ 2NC

Bharat Heavy Electricals Limited (bhel)

TIRUCHIRAPPALLI, TAMIL NADU

Posted: 28 April 2025
Closed: 15 May 2025
GEM

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates for similar limit switch supply (if applicable)

4

Financial statements (latest audited/unaudited as required)

5

EMD submission proof (as per tender)

6

Technical bid documents showing IS 6875 compliance

7

OEM authorization letter (where applicable)

8

Purchase preference documents for MSEs (if claiming benefits)

Corrigendum Updates

1 Update
#1

Update

07-Jan-2026

Extended Deadline

14-Jan-2026, 2:00 pm

Opening Date

14-Jan-2026, 2:30 pm

Frequently Asked Questions

Key insights about UTTARAKHAND tender market

How to bid on BHEL limit switch tender IS 6875 2025 in India

Bidders should first verify IS 6875 compliance for LIMIT SWITCH N. STD and verify eligibility for MSE preference if manufacturer-qualified. Prepare GST, PAN, OEM authorizations, financials, and experience certificates. Upload technical bid with IS 6875 conformity and await ATC confirmation before submission.

Note: The tender allows quantity adjustments up to 25%, so plan for flexible orders and confirm delivery timelines with the contract officer.

What documents are required for limit switch supply procurement

Required documents include GST registration, PAN, latest financial statements, experience certificates, OEM authorization letters, and IS 6875 compliance certificates. MSE eligibility requires manufacturer proof; service-related evidence if applicable. Ensure all documents are uploaded with the bid and cross-checked against ATC requirements to avoid rejection.

What are the key technical specifications for the IS 6875 switches

The tender seeks LIMIT SWITCH N. STD: IS 6875 compliant devices; ensure the exact IS 6875 standard is met, including electrical ratings, mechanical dimensions, mounting patterns, and contact configurations as specified in the tender and ATC. Confirm any OEM part numbers and performance ratings demanded by BHEL.

When will delivery schedule terms apply for quantity variation

Delivery terms are tied to the last date of the original delivery order; if the option clause is exercised, the extended delivery time uses (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days. The buyer may extend within contract limits, so plan buffer stock accordingly.

What is the MSE purchase preference criteria in this bid

MSE preference applies to eligible manufacturers of the offered goods; if L-1 price exceeds MSE threshold by 15% within policy bands, the MSE seller may be invited to match L-1 and obtain up to 25% of total value. Traders cannot claim MSE benefit for goods.

What are the payment terms for supply of limit switches

Payment terms are defined in the main bid document and ATC; bidders should anticipate standard government terms, potentially including milestones tied to delivery or acceptance. Verify whether upfront, milestone-based, or post-delivery payments apply and align with contract schedules.

What is the scope of supply for this limit switch tender

Scope is limited to the supply of goods only, with no installation or after-sales service included unless explicitly stated in the ATC. Bidders must deliver tested, IS 6875-compliant limit switches to the specified destinations within the agreed delivery window.

How to verify IS 6875 compliance for submitted switches

Verify that the offered limit switches have an IS 6875 certificate or conformity declaration from a recognized body. Include test reports, OEM datasheets, and any BIS certifications if applicable. Cross-check electrical ratings, mechanical dimensions, and mounting compatibility with BHEL requirements.