TenderDekho Logo
Closed GEM

Indian Institute of Technology Haridwar Hammer Cage Net with Wire, Rope & Installation Tender 2026 ISO 9001

Bid Publish Date

09-Aug-2026, 9:55 pm

Bid End Date

31-Aug-2026, 10:00 am

Progress

Issue09-Aug-2026, 9:55 pm
AwardPending

Tender Overview

The Indian Institute of Technology (IIT) in Haridwar, Uttarakhand invites bids for the supply, installation, testing and commissioning of Hammer Cage Net with Wire, Rope and Installation, plus Fiber Glass Pole components, under a single procurement. The scope includes supply, installation, testing and commissioning of required goods at the Haridwar campus, with potential quantity adjustments up to 25% of bid quantity during contract execution. Bidders must satisfy turnover criteria and provide OEM turnover details as part of the bid. The procurement emphasizes compliant delivery timelines, full scope pricing, and adherence to documented contractual terms. A key differentiator is the option-driven quantity adjustment and the mandatory ISO 9001 certification requirement for bidders or OEMs. Unique conditions include the option clause and delivery-time calculations tied to original and extended periods, requiring bidders to align with these dynamic delivery terms.

Technical Specifications & Requirements

  • Scope: Supply, Installation, Testing and Commissioning (SIC) of Hammer Cage Net with Wire, Rope and Installation, plus Fiber Glass Pole components.
  • Standards: ISO 9001 certification ( bidder or OEM must hold).
  • Financials: Minimum average annual turnover requirement for bidders and OEMs over the last three financial years; documentation to be uploaded (audited balance sheets or CA certification).
  • Variations: Up to 25% quantity increase/decrease allowed at bid and contract execution, with delivery period adjustments formula provided.
  • Delivery: Delivery period linked to original delivery order; extended periods trigger calculated time extensions with minimum 30 days.
  • Documentation: Certificates and required documents must be uploaded; non-compliance leads to rejection.
  • OEM Condition: If multiple bidders, OEM of the primary product with the highest bid value must meet turnover criteria.

Terms, Conditions & Eligibility

  • EMD/Deposit: Not specified in data; ensure alignment with tender terms and document submission.
  • Turnover: Minimum average annual turnover over last three years; provide audited statements or CA certificates.
  • ISO/Certifications: ISO 9001 mandatory for bidder or offered product’s OEM.
  • Delivery & Payment: Standard supply, installation, testing and commissioning with payment terms to be specified in the contract; delivery timelines governed by option clause.
  • Certificate Uploads: Ensure all required certificates and documents are attached; missing certificates may lead to rejection.
  • Warranty/Support: Not explicitly stated; standard practice would require post-installation support as per purchase order.

Key Specifications

  • Hammer Cage Net with Wire, Rope and Installation

  • Fiber Glass Pole components

  • Scope includes Supply, Installation, Testing and Commissioning (SIC)

  • OEM turnover criterion for primary product bid

  • Option clause enabling ±25% quantity adjustment

  • Delivery period linked to original and extended orders with 30-day minimum extension

  • ISO 9001 certification required for bidder or OEM

Terms & Conditions

  • Quantity may vary by up to 25% at contract placement and during currency at contracted rates

  • Turnover criteria require last 3 years’ financials; audited or CA-certified submissions

  • ISO 9001 certification required for bidder or OEM of offered products

Important Clauses

Payment Terms

Payment terms to be specified in contract; scope includes Supply, Installation, Testing and Commissioning (SIC)

Delivery Schedule

Delivery period begins from the last date of original delivery order; extended time calculated as (Increased quantity ÷ Original quantity) × Original delivery period with a minimum of 30 days

Penalties/Liquidated Damages

Penalties terms to be defined in contract based on delivery and performance; LDs typically apply for late delivery or non-performance

Bidder Eligibility

  • Minimum average annual turnover over the last 3 financial years as specified in bid document

  • ISO 9001 certification for bidder or OEM

  • Proven experience in SIC of similar protective/cage net installations

Authority & Contact

Office Name

North Zone Roorkee

Grievance Contact

[email protected]

Tender Data

Bid Details

Quantity

2

Category

Fiber Glass Pole

Bid Type

Two Packet Bid

Bid Validity

90 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

25

OEM Avg. Turnover

10

Past Performance

80 %

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Discuss / Hammer Cage Net with Wire, Rope and Installation , Fiber Glass Pole

Delivery Details

Max Delivery Days

15

Delivery Locations

1

Delivery Cities

Haridwar

Delivery Pincodes

247667

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Alok Kumar Pandey247667,SPORTS COUNCIL, INDIAN INSTITUTE OF TECHNOLOGY ROORKEE, ROORKEEHaridwarUttarakhand247667115-

Authority Records

MINISTRY OF EDUCATIONHIGHER EDUCATION DEPARTMENTINDIAN INSTITUTE OF TECHNOLOGY

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9731423.pdf

Main Document

Other Documents

OTHER

Other Documents

OTHER

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Categories 2

Required Documents

1

GST registration certificate

2

PAN card

3

Audited Balance Sheets or CA certificate showing turnover (last 3 years)

4

ISO 9001 certificate (bidder or OEM)

5

OEM authorization if applicable

6

Technical bid documents demonstrating compliance with scope

7

EMD / security deposit as per tender terms (to be clarified in bid)

8

Experience certificates for similar SIC projects (if available)

Frequently Asked Questions

Key insights about UTTARAKHAND tender market

How to bid for IIT Haridwar hammer cage net tender 2026

Bidders should prepare turnover evidence for the last 3 years (audited balance sheets or CA certificates), submit ISO 9001 certification (bidder or OEM), provide OEM authorisation if applicable, and attach technical bid documents detailing Supply, Installation, Testing and Commissioning scope. Ensure upload of GST, PAN, and experience certificates; confirm adherence to the 25% quantity variation clause.

What documents are required for IIT Haridwar security equipment bid 2026

Required documents include GST registration, PAN, audited turnover proofs for three years, ISO 9001 certificate (bidder or OEM), OEM authorization if using third-party manufacturers, and technical bid detailing Supply, Installation, Testing and Commissioning scope. Also include experience certificates for similar SIC projects and EMD documentation as per terms.

What are the ISO 9001 requirements for this IIT tender

Bidder or the offered product OEM must hold ISO 9001 certification. If a single bidder presents multiple items, the OEM with the highest bid value must meet turnover criteria. Include the certificate number, issuing body, and validity period in the bid submission.

When is the quantity variation allowed in this IIT Haridwar tender

Quantity may be adjusted up to 25% of the bid quantity at the time of contract placement and during contract currency at contracted rates. The extended delivery time follows a calculated formula with a minimum of 30 days, and original delivery period governs extensions.

What are the delivery and payment terms for IIT Haridwar SIC

Delivery terms are tied to the last date of the original delivery order, with potential extensions per the option clause. Payment terms will be defined in the contract; bidders should expect milestones aligned with Supply, Installation, Testing and Commissioning completion and acceptance criteria.

Which organization and location is bidding for the protective net system

Bid opportunity is with the Indian Institute of Technology, Department of Higher Education, located in Haridwar, Uttarakhand. The procurement focuses on Hammer Cage Net with Wire and Installation, along with Fiber Glass Pole components, under 2026 terms.

What is required in the scope of supply for the bid

The scope includes Supply, Installation, Testing and Commissioning of Hammer Cage Net with Wire, Rope, and Installation, and Fiber Glass Pole components. Ensure the bid covers all costs under the Scope of Supply and includes installation and commissioning services with post-acceptance testing.

How to verify OEM turnover criteria for this tender

Provide three-year turnover data for the OEM via audited statements or CA certificates. If the OEM is less than 3 years old, use turnover from completed financial years post-incorporation. In case of bunch bids, the OEM of the primary product with the highest bid value must meet the criterion.