Bid Publish Date
27-Jul-2026, 10:38 pm
Bid End Date
07-Aug-2026, 6:00 pm
EMD
₹5,500
Location
Progress
Quantity
161
Category
AC INSTALLATION CHARGES
Bid Type
Two Packet Bid
The Uttar Pradesh Cooperative Federation Limited, operating under the Cooperative Department Uttar Pradesh, seeks procurement of Window AC 2 Ton, Window AC 1.5 Ton, AC Stabilizers, Drain Pipe with Labour, and AC Installation Charges for sites in Lucknow, Uttar Pradesh 226001. The tender outlines an EMD of ₹5,500 and specifies five BOQ items with unspecified unit quantities, indicating a multi-item HVAC package rather than a single SKU. A key differentiator is the supplier flexibility to adjust quantity by up to 25% during contract placement and currency, with delivery timelines calculated from the last delivery order date. This structure accommodates demand volatility and optional expansion within contracted rates, subject to minimum lead times. The absence of detailed specs suggests reliance on ATC terms and potential alignment to standard HVAC norms. The tender’s emphasis on installation charges and drain pipe labour highlights a turnkey approach, not just equipment supply, suitable for government installations requiring on-site support.
Product/Service Names: Window AC 2 Ton, Window AC 1.5 Ton, AC Stabilizers, Drain Pipe with Labour, AC Installation Charges
Quantities: Not disclosed in BOQ (5 items) – quantity variation up to 25% permitted
EMD Amount: ₹5,500
Delivery Location: Lucknow, Uttar Pradesh 226001
Standards/Certifications: Not specified in tender; ATC references likely govern compliance
Warranty/AMC: Not specified in available data
Quantity variation up to 25% at contracted rates with delivery schedule linked to last PO date
EMD of ₹5,500 required; payment terms and warranty to be detailed in ATC
Turnkey scope including drain pipe labour and installation charges; on-site delivery in Lucknow
Payment terms to be defined in ATC; EMD ₹5,500 required; consider security deposit per conditions
Delivery period starts from last date of original delivery order; extended delivery to be calculated with minimum 30 days
Not disclosed; ATC will contain LD terms and performance penalties, if any
Bidders must submit GST, PAN, and financial statements
Experience in HVAC supply/installation for government or cooperative sector
OEM authorization or dealership credentials if required by ATC
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
WINDOW AC 02 TON , WINDOW AC 1.5 TON , AC STABILIZER , DRAIN PIPE WITH LABOUR , AC INSTALLATION CHARGES
Advisory Bank
PUNJAB NATIONAL BANK
ePBG Percentage
3%
ePBG Duration (Months)
12
Payment Timelines
Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
90
Delivery Locations
1
Delivery Cities
Lucknow
Delivery Pincodes
226001
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Jitendra Kumar | 226001,U.P.COOPERATIVE FEDERATION LTD, 32, STATION ROAD, LUCKNOW | Lucknow | Uttar Pradesh | 226001 | 6 | 90 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
WINDOW AC 02 TON
WINDOW AC 02 TON
WINDOW AC 1.5 TON
WINDOW AC 1.5 TON
AC STABILIZER
AC STABILIZER
DRAIN PIPE WITH LABOUR
DRAIN PIPE WITH LABOUR
AC INSTALLATION CHARGES
AC INSTALLATION CHARGES
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | WINDOW AC 02 TON | WINDOW AC 02 TON | 6 | pieces | buycon6.upcfl | 90 | |
| 2 | WINDOW AC 1.5 TON | WINDOW AC 1.5 TON | 1 | pieces | buycon6.upcfl | 90 | |
| 3 | AC STABILIZER | AC STABILIZER | 7 | pieces | buycon6.upcfl | 90 | |
| 4 | DRAIN PIPE WITH LABOUR | DRAIN PIPE WITH LABOUR | 140 | mtr | buycon6.upcfl | 90 | |
| 5 | AC INSTALLATION CHARGES | AC INSTALLATION CHARGES | 7 | job | buycon6.upcfl | 90 |
Discover companies most likely to bid on this tender
GST Registration Certificate
Permanent Account Number (PAN) Card
Experience Certificates of similar HVAC supply/installation
Financial Statements/Balance Sheet for last 2-3 years
EMD payment receipt or bank guarantee as per ATC
Technical bid documents (compliance with ATC)
OEM Authorization / Authorized Dealership certificate (if applicable)
Any relevant installation crew credentials or labour labour readiness proof
Key insights about UTTAR PRADESH tender market
Bidders should prepare GST, PAN, and financials, plus OEM authorizations if required. Submit HVAC equipment specifications for Window AC 2 Ton and 1.5 Ton, along with installation labour and drain pipe Labour details. Ensure EMD of ₹5,500 is paid and comply with ATC quantity variation terms up to 25%.
Required documents include GST certificate, PAN card, experience certificates for similar HVAC projects, financial statements, EMD payment proof, technical compliance documents per ATC, OEM authorization if applicable, and installation manpower credentials.
The tender covers Window AC 2 Ton and Window AC 1.5 Ton, plus AC Stabilizers and Drain Pipe with Labour and Installation Charges. No explicit IS/IS standards are listed; ATC will define compliance and any brand or OEM requirements.
Delivery begins from the last date of the original delivery order, with option delivery time calculated as (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days. Extended delivery provisions may apply through the option clause.
The EMD amount is ₹5,500. It must be deposited as specified in the ATC, which governs submission, validity, and potential refund or adjustment upon bid evaluation.
Eligibility includes valid GST and PAN, demonstrated experience in HVAC supply/installation (preferably government/cooperative sector), financial stability demonstrated via statements, and adherence to OEM authorizations if required by the ATC.
Sign up now to access all documents
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS