NTPC Limited Fire Hydrant Hoses Tender 2026 - 25% Quantity Option & Delivery Terms

Bid Publish Date

01-Aug-2026, 12:49 pm

Bid End Date

28-Aug-2026, 9:00 am

Generate Docs

Progress

Issue01-Aug-2026, 12:49 pm
Corrigendum05-Aug-2026
AwardPending

Key Highlights

  • Exact brand/OEM requirements not specified
  • Technical certifications/standards not listed in tender
  • 25% quantity variation option during contract execution
  • Delivery period linked to original delivery order with 30-day minimum extension

Tender Overview

NTPC Limited invites bids for procuring Fire Hydrant Hoses in 2026. The BOQ shows 0 items and no explicit specifications, signaling a potential bulk or rolling requirement. The procurement emphasizes quantity flexibility—an option clause up to 25% of bid quantity during contract execution. Location details are not disclosed, but the opportunity targets bidders capable of scalable delivery under NTPC procurement norms. A key differentiator is the explicit option to adjust orders while maintaining contracted rates, subject to delivery timelines derived from the original schedule. This tender demands compliance with standard NTPC bid terms and readiness for potential quantity variation.

Technical Specifications & Requirements

  • Product category: Fire Hydrant Hoses
  • No explicit technical specs listed in the BOQ; bidders must assume standard fire safety hose characteristics and confirm compatibility with NTPC equipment.
  • Key consideration: Option clause enabling up to 25% quantity variation (increase/decrease) at contracted rates.
  • Delivery schedule references: delivery period begins after the last date of the original delivery order; any extension follows the option clause calculation: (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days.
  • No EMD amount or estimated value provided; bidders should verify current NTPC procurement norms prior to bid.

Terms, Conditions & Eligibility

  • Quantity option: Purchaser may modify quantity up to 25% during contract and extended period.
  • Delivery time logic: calculated extension with minimum of 30 days; periods may extend to the original delivery period.
  • Compliance: Bidders must adhere to these option and delivery terms as part of bid submission; no other explicit terms listed here.
  • Documentation and eligibility criteria are to be confirmed per NTPC standard procurement guidelines.

Key Specifications

  • Product/service names: Fire Hydrant Hoses

  • Quantities/values: Not disclosed in BOQ

  • EMD/Estimated value: Not provided

  • Category: Fire safety equipment procurement

  • Delivery/installation: Delivery period linked to last date of original delivery order with option-based extensions

Terms & Conditions

  • 25% quantity variation allowed at contracted rates

  • Delivery period calculated as (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days

  • Extension may extend up to the original delivery period under option clause

Important Clauses

Delivery terms

Delivery starts from the last date of the original delivery order; extension times follow the option clause calculation with a 30-day minimum.

Option Clause

Purchaser may increase or decrease quantity up to 25% during contract and currency period at contracted rates.

Price and Variation

Contracted rates apply to any quantity variation under the option clause; basis of calculation follows the specified formula.

Bidder Eligibility

  • Experience in supplying fire safety equipment or hoses to large organizations

  • Ability to meet NTPC procurement terms and conditional extensions

  • Financial stability adequate to support scalable order quantities

Authority & Contact

Organization

Ntpc Limited

Department

NA

Office Name

Barh Stpp Patna Bihar

Grievance Contact

[email protected]

Tender Data

Bid Details

Quantity

25

Bid Type

Two Packet Bid

Bid Validity

30 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

1

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Fire Hydrant Hoses

Payment Timelines

Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

15

Delivery Locations

1

Delivery Cities

Patna

Delivery Pincodes

803213

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Ajay Alok Chaudhary803213,NTPC Barh Super Thermal Power Project, PO- NTPC Campus Barh, Distt- Patna,State-BiharPatnaBihar8032132515-

Authority Records

MINISTRY OF POWER

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 3

GeM-Bidding-9687350.pdf

Main Document

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Categories 2

Corrigendum Updates

1 Update
#1

Update

05-Aug-2026

Extended Deadline

14-Aug-2026, 7:30 am

Opening Date

14-Aug-2026, 8:00 am

Required Documents

1

GST registration certificate

2

PAN card

3

Experience certificates for similar fire safety equipment supply

4

Financial statements or turnover proof

5

EMD/Security deposit documentation (as per NTPC norms - amount not specified)

6

Technical bid documents confirming compliance to fire hydrant hose standards

7

OEM authorizations if applicable

Frequently Asked Questions

Key insights about BIHAR tender market

How to bid for NTPC fire hydrant hoses tender 2026?

Bidders should submit GST, PAN, experience certificates, financial statements, and EM D as per NTPC norms. Ensure OEM authorization if applicable, and provide technical compliance for fire hydrant hoses. The bid must reflect the 25% quantity option and align with delivery-extension rules described in the terms.

What documents are required for NTPC fire safety equipment bid?

Required documents include GST registration, PAN, experience certificates for similar supplies, financial statements, EMD documentation, technical compliance certificates, and OEM authorizations. Submit these with the technical bid and ensure conformity to NTPC bid terms for a valid submission.

What is the 25% quantity option in this NTPC tender?

The purchaser may increase or decrease bid quantity up to 25% during contract and currency, at contracted rates. Delivery adjustments follow a calculated extension: (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days.

Are there any specified EMD amounts for NTPC fire hydrant hoses?

EMD details are not specified here; bidders should refer to the NTPC standard procurement guidelines to determine the required EMD or security deposit amount and payment method for this tender.

When does delivery extend under the NTPC option clause for hoses?

Delivery extension begins from the last date of the original delivery order. If the option clause is exercised, the extension is (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum 30 days, and may extend to the original delivery period.

What standards or certifications are required for NTPC hose procurement?

The tender data does not list specific standards; bidders should confirm NTPC requirements and provide typical fire safety hose certifications and OEM authorizations as applicable to the material and usage context.

How to verify eligibility for NTPC fire hydrant hoses tender 2026?

Check eligibility criteria in NTPC bid terms: experience in similar supply, financial stability, GSTIN validity, and ability to meet quantity variation and delivery requirements. Prepare documentation accordingly to ensure seamless bid evaluation.

What is the delivery timeline after original order for NTPC hoses?

Delivery timeline starts from the last date of the original delivery order. Extended delivery follows the 25% quantity option calculation, with a minimum extension of 30 days and potential alignment with the original period as per the formula.