TenderDekho Logo
Closed GEM

Indian Army Skipping Rope (V2), Air Pump & Stop Watch Tender 2025 DMA - Optional Quantity Extension & Drawings Approval

Bid Publish Date

13-Nov-2025, 9:27 am

Bid End Date

03-Dec-2025, 10:00 am

Progress

Issue13-Nov-2025, 9:27 am
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

58

Category

Skipping Rope (V2)

Bid Type

Two Packet Bid

Categories 2

Tender Overview

Indian Army invites bids for procurement of Skipping Rope (V2), Air Pump and Stop Watch under DMA, with an estimated scalable quantity via option clause. The tender emphasizes up to 25% quantity variation, and requires submission of Detailed Design Drawings within 7 days of award for buyer approval. Bidder must ensure supply per approved drawings; delays in buyer approval revert to re-fix delivery without LD. Compliance with financial health and corporate documents is mandatory. This procurement targets standardized training aids and timing devices, with a clear mechanism for extended delivery periods and drawing-based acceptance, ensuring consistency with military-grade usage.

Technical Specifications & Requirements

  • Product names: Skipping Rope (V2), Air Pump, Stop Watch as per tender scope.
  • Option clause: Up to 25% increase/decrease in quantity at contracted rates; extended delivery time proportional to quantity change, min 30 days.
  • Drawing approval: Submit Detailed Design Drawings within 7 days of contract award; buyer to approve or list modifications within 7 days; supply to conform to approved drawings.
  • Data Sheet alignment: Upload product data sheets; ensure match with offered specifications; mismatches may cause rejection.
  • End User Certificate / NDA: End User Certificate in buyer format when requested; Non-Disclosure Declaration on bidder letterhead required.
  • Vendor prerequisites: Not in liquidation or similar; provide PAN, GSTIN, cancelled cheque, EFT mandate; vendor code creation required.
  • Quality/Documentation: Data Sheet accuracy is critical for bid acceptance; all submission must align with T&Cs.

Terms, Conditions & Eligibility

  • EMD/financial standing: Bidder must not be under liquidation or bankruptcy; provide undertaking.
  • Key documents: PAN Card, GSTIN, Cancelled Cheque, EFT Mandate certified by bank; Data Sheet for offered products; End User Certificate if requested; NDA on bidder head.
  • Delivery terms: Delivery period tied to approval; if drawing approval is delayed, delivery period is re-fixed with no LD for buyer delay.
  • Post-award design: Detailed design drawings required within 7 days; modifications communicated within 7 days; supply must reflect approved drawings.
  • Vendor compliance: Submit required documents for Vendor Code Creation; ensure financial and statutory compliance; no discharge in court proceedings.
  • Confidentiality: NDA and non-disclosure provisions apply throughout and after contract expiry.

Key Specifications

  • Option Clause: quantity variation up to 25% at contracted rates

  • Drawing approval: Detailed Design Drawings due within 7 days of award

  • Data Sheet alignment: data sheet must match offered specifications

  • End User Certificate in buyer format when requested

  • NDA to be uploaded on bidder letterhead

Bidder Eligibility

  • Not under liquidation, court receivership, or similar proceedings

  • Valid PAN and GSTIN

  • Ability to provide EFT mandate and cancelled cheque

  • Data Sheet submitted and matched with product specs

  • End User Certificate provided if requested

  • NDA filing on bidder letterhead

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

Skipping Rope (V2) (Q3) , Air pump (Q4) , Stop Watch (Q3)

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENTINDIAN ARMY

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 3

GeM-Bidding-8498061.pdf

Main Document

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Copy of PAN Card

2

Copy of GSTIN

3

Copy of Cancelled Cheque

4

Copy of EFT Mandate certified by Bank

5

Data Sheet of offered products

6

End User Certificate (buyer format, if requested)

7

Non-Disclosure Declaration on bidder letterhead

8

Undertaking on non-liquidation/bankruptcy

Frequently Asked Questions

Key insights about MADHYA PRADESH tender market

How to bid for Indian Army Skipping Rope and Stop Watch tender in 2025 DMA

Bidders should prepare PAN, GSTIN, cancelled cheque, EFT mandate, and a Data Sheet matching offered products. Submit Detailed Design Drawings within 7 days of award; be ready for Modifications list within 7 days. Ensure NDA and End User Certificate are provided where required, with compliance to the 25% quantity option.

What documents are required for the Indian Army procurement 2025

Required documents include PAN Card, GSTIN, Cancelled Cheque, EFT Mandate, Data Sheet of offered items, End User Certificate (if requested), and NDA on bidder letterhead. Bidder must confirm no liquidation or bankruptcy and provide an undertaking. Vendor Code Creation materials are also needed.

What are the technical specifications for the 2025 DMA tender

The tender lists product categories—Skipping Rope, Air Pump, Stop Watch—with emphasis on design drawings and data sheets. Ensure offered items have Data Sheet alignment, and that supply follows the approved drawings. Specific performance metrics are not provided; compliance relies on Data Sheet accuracy.

When is the delivery period if drawing approval is delayed

Delivery period is refixed without liquidated damages for the period of approval delay. Once drawings are approved, the original delivery period applies or is adjusted per the option clause, with a minimum 30 days for any extended delivery.

What is the option clause for quantity variation in this tender

The purchaser may increase or decrease the order quantity up to 25% at contract finalization and during contract currency at contracted rates. Additional time is calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days.

What is required for NDA and End User Certificate compliance

NDA must be submitted on bidder letterhead, with explicit vendor confidentiality commitments. End User Certificate, when requested by Buyer, must follow the Buyer's standard format. Both documents support contract security and restricted disclosure during and after execution.

What happens if data sheet does not match during bid evaluation

Mismatches between Data Sheet and offered product specifications can lead to bid rejection. Ensure the Data Sheet accurately reflects model numbers, capacities, and component specs to align with the buyer's verification process.