Progress
The Indian Army, Department Of Military Affairs, seeks procurement of multiple medical equipment and therapy devices, including Vertical Pulsating High Gradient Magnetic Separator, HIGH POWER LASER THERAPY CLASS IV, 3 SECTION examination beds, portable TENS battery-powered units, and heat/cold massage therapy machines. Estimated contract value is ₹1,000,000 with an EMD of ₹20,000. Location details are not specified, but the scope covers medical devices and therapy equipment with national delivery. A key differentiator is the option clause allowing quantity variations up to 25% during contract execution and a multi-stage design approval process. The tender emphasizes compliance with buyer-approved Detailed Design Drawings and a post-award service framework, including service centers in consignee states and pre/post-dispatch inspection.
Product categories: Vertical Pulsating High Gradient Magnetic Separator, HIGH POWER LASER THERAPY CLASS IV, 3 SECTION examination bed, portable TENS battery-operated unit, heat and cold massage therapy machine with adopter
Estimated contract value: ₹1,000,000
EMD amount: ₹20,000
Recommended delivery methodology aligned to option clause (up to 25% quantity variation)
Drawing approvals: Detailed Design Drawings to be submitted within 5 days of award; approvals or modification list within 7 days
Service centres: Functional in each consignee state or establish within 30 days; payment contingent on service setup documentation
Delivery extensions permitted up to 25% quantity variation with baseline delivery periods
Must submit Detailed Design Drawings within 5 days and obtain approval or modification list within 7 days
Service Centre in each consignee state or establishment within 30 days; payment after submission of evidentiary documentation
Payment linked to approved drawings and service center establishment; no LD for buyer approval delays
Option clause allows 25% quantity variation; delivery period calculated from last original date with minimum 30 days added time
Not explicitly specified; LD to be determined by contract terms with delay implications tied to design approval
Proven experience in supplying medical therapy devices and hospital equipment
Demonstrated service center capability in respective consignee states or a plan to establish within 30 days
Compliance with design drawing approval process and post-delivery inspection readiness
Quantity
5
Category
HIGH POWER LASER THERAPY CLASS IV
Bid Type
Two Packet Bid
Bid Validity
120 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
RA Qualification Rule
50% Lowest Priced Technically Qualified Bidders
Tech Clarification Time
2 Days
EMD Required
Yes
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
Yes
Bid Splitting Applied
No
Min. Avg. Annual Turnover
5
OEM Avg. Turnover
2
Past Performance
20 %
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Vertical Pulsating High Gradient Magnetic Separator , HIGH POWER LASER THERAPY CLASS IV , 3 SECTION, HIGH LOW EXAMINATION BED , PORTABLE TENS BATTERY OPERATED , HOT AND COLD MASSAGE THERAPY MACHINE IN ADDITION TO HEAT AND COOL ADOPTER
Advisory Bank
State Bank of India
ePBG Percentage
0.02%
ePBG Duration (Months)
6
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
FAZILKA
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | FAZILKA | FAZILKA | - | - | 1 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar medical equipment deployments
Financial statements and turnover evidence
EMD submission receipt (online or DD as applicable)
Technical bid documents and drawings submission
OEM authorization / authorization letters from manufacturers
Service center establishment proof or plan of establishment within 30 days
Key insights about PUNJAB tender market
Bidders must submit GST, PAN, experience certificates, financial statements, and EMD ₹20,000. Provide OEM authorizations and Technical bid with Detailed Design Drawings within 5 days of award; ensure service centre capability or plan within 30 days. Compliance with option clause and inspection terms is mandatory.
Required documents include GST certificate, PAN, experience certificates for similar devices, financial statements, EMD receipt of ₹20,000, technical bid, OEM authorization, and evidence of functional service center or plan to establish within 30 days of award.
The tender requires Class IV laser therapy devices as listed, with approval of Detailed Design Drawings within 5 days and modification lists within 7 days. Post-approval supply must align with buyer drawings and inspection by nominated agency prior to acceptance.
Delivery times follow the original delivery period; quantity increases up to 25% allow extended time calculated as (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days. LD is not applied for buyer drawing approval delays.
EMD is ₹20,000 and must be submitted as specified (online or DD per ATC). It accompanies the bid and is eligible for return following contract award or rejection as per tender terms.
Inspection may be pre-dispatch at seller premises or post-receipt at consignee site by a nominated agency. Supplier must supply per approved drawings; evaluation includes the availability of service centers and compliant documentation prior to acceptance.
Seller must submit Detailed Design Drawings within 5 days of award; buyer approves or returns a modification list within 7 days. Supply must conform to approved drawings; delays in approval may shift delivery timelines accordingly.
Provide plan or evidence of a functional Service Centre in each consignee state; if not existing, establish within 30 days of award. Payment is released only after documentary proof of the service center.