Bid Publish Date
25-Sep-2026, 4:59 pm
Bid End Date
23-Oct-2026, 5:00 pm
Location
Progress
Indian Institute Of Petroleum And Energy has released a public tender for EXPERIMENTAL SET UP FOR OIL-WATER TWO-PHASE FLOW IN A PIPE WITH GRADUAL EXPANSION OR GRADUAL CONTRAC in VISAKHAPATNAM, ANDHRA PRADESH. Quantity: 1. Submission Deadline: 23-10-2026 17: 00: 00. Download documents and apply online.
Quantity
1
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
7 Days
EMD Required
No
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Min. Avg. Annual Turnover
11
OEM Avg. Turnover
90
Past Performance
50 %
Warranty Period
1 years
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
EXPERIMENTAL SET UP FOR OIL-WATER TWO-PHASE FLOW IN A PIPE WITH GRADUAL EXPANSION OR GRADUAL CONTRAC
Advisory Bank
State Bank of India
ePBG Percentage
5%
ePBG Duration (Months)
14
Max Delivery Days
56
Delivery Locations
1
Delivery Cities
Visakhapatanam
Delivery Pincodes
531035
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Sachidananda Rath | 531035,Indian Institute of Petroleum and Energy (IIPE), At Vangali (Village), Sabbavaram (Mandal), Anakapalli (District), INDIA | Visakhapatanam | Andhra Pradesh | 531035 | 1 | 56 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Extended Deadline
23-Oct-2026, 11:30 am
Opening Date
24-Oct-2026, 11:30 am
Discover companies most likely to bid on this tender
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
OEM Annual Turnover
Additional Doc 1 (Requested in ATC)
Additional Doc 2 (Requested in ATC)
Additional Doc 4 (Requested in ATC)
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer