Bid Publish Date
24-Oct-2026, 4:16 pm
Bid End Date
03-Nov-2026, 5:00 pm
Value
₹1,96,000
Location
Progress
Organization: Uttar Pradesh Power Corporation Limited (UPPCL) in the Energy Department, operating in Budaun, Uttar Pradesh (202421). Procurement category covers repair, maintenance, and installation of plant/systems/equipment (version 2) for industry unit, switchyard, and service provider scope. Estimated value: ₹196,000.00. The contract location is the 132KV Substation area at Asafpur Road, Bisauli, Budaun. The terms allow a potential 50% adjustment in quantity or duration, subject to consent and contract issuance. A lump-sum service scope may be expanded up to half the original value with bidder consent. This tender emphasizes field installation and commissioning tasks at a government substation.
Product/Service: Repair, maintenance, and installation services for plant/systems/equipment in a 132KV substation context
Location: 132KV Substation, Asafpur Road, Bisauli, District Budaun, UP
Estimated value: ₹196,000.00
EMD: Not specified in data; bidders should verify in ATC
Standards/Certifications: Not explicitly listed; confirm safety and electrical installation standards in ATC
Delivery: On-site installation/commissioning if included in scope; site address provided
50% quantity/duration adjustment allowed pre-issuance; post-issuance up to 50%
Delivery/installation location fixed at 132KV Substation, Bisauli, Budaun
ATC may contain additional terms; bidders must review the uploaded ATC document
Actual delivery/installation is to be performed at the 132KV Substation, Asafpur Road, Bisauli, Budaun, UP, per ATC.
Contract quantity or duration may be increased up to 50% at contract issue and further increases allowed only up to 50% with consent.
For lumpsum-based service contracts, scope/value may be expanded up to 50% with bidder consent.
Experience in repair/maintenance/installation at electrical substations
Financial capacity to handle ₹1.96 Lakh scope
Compliance with safety standards for electrical substation work
Quantity
1
Bid Type
Two Packet Bid
Bid Validity
30 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Tech Clarification Time
2 Days
EMD Required
No
MII Compliance
Yes
MSE Purchase Preference
No
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Min. Avg. Annual Turnover
2
Experience Required
2 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Service
Bid To RA
No
Bid To RA Enabled
No
Item Category
Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - Industry Unit; Switchyard; Service Provider
Payment Timelines
Payments shall be made to the Seller within 45 days of issue of service delivery acceptance certificate (SDAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Delivery Locations
1
Delivery Cities
Budaun
Delivery Pincodes
243601
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Prashant Agrahari | 243601,ELECTRICITY TRANSMISSION DIVISION 220 KV S/S NAWADA AONLA ROAD POST- SALARPUR BADAUN | Budaun | Uttar Pradesh | 243601 | Project / Lumpsum Based | - | Estimated Cost of Spare/Consumable s/Items on Reimbursement basis in Rs (please input 0 if not applicable) : 19600000 |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
GST registration certificate
PAN card
Experience certificates for similar repair/maintenance/installation at substations
Financial statements demonstrating financial capacity
EMD/Security deposit documentation (as per ATC, if specified in uploaded file)
Technical bid documents and any OEM authorizations if required by ATC
Any safety/occupational health certifications relevant to electrical substation work
Key insights about UTTAR PRADESH tender market
Bidders should register on the e-procurement portal, review the uploaded ATC, prepare technical and financial bids, and ensure eligibility for substation repair/maintenance. Include GST, PAN, experience certificates, financial statements, and any OEM authorizations. The 50% quantity/duration flexibility must be acknowledged.
Required submissions include GST registration, PAN, experience certificates for substations, financial statements, EMD/Security deposit as per ATC, technical bid documents, and any OEM authorizations. Ensure delivery address and site safety credentials are included with the bid.
Delivery/installation must occur at the 132KV Substation, Asafpur Road, Bisauli, District Budaun, UP. Site access and contact details are provided in the tender ATC for on-site commissioning, if included in scope.
Candidates must demonstrate relevant experience in electrical substation repair/maintenance, show financial stability via statements, and provide safety certifications. Review the ATC for any equipment-specific qualifications and ensure compliance with on-site electrical safety norms.
Payment terms are detailed in the ATC; bidders should verify whether advance, milestone, or on-delivery payments apply. Ensure compliance with submission of all required financial documents and any performance-based payment conditions included in the ATC.
The buyer may increase or decrease contract quantity/duration up to 50% at contract issue, with consent. Include flexibility in the bid pricing and confirm capability to scale resources, equipment, and manpower accordingly.
Bidders should present safety and occupational health credentials relevant to substations (e.g., site safety plan, personnel training). ATC may require compliance with local electrical safety standards; ensure all personnel hold valid certifications.
ATC documents are uploaded by the buyer in the e-procurement portal. Access the file via the tender page’s ATC section to review additional terms, compliance requirements, and any special conditions for this project.