TenderDekho Logo
Active GEM

State Bank of India Airconditioners & Standard Installation Tender Bardhaman West Bengal 2026 - 25% Quantity Option Clause

Bid Publish Date

30-Oct-2026, 7:27 pm

Bid End Date

09-Nov-2026, 8:00 pm

Value

₹2,50,000

Progress

Issue30-Oct-2026, 7:27 pm
AwardPending

Key Highlights

  • • Brand/Equipment: Airconditioners with standard installation, plug top fittings, iron brackets, and standard accessories
  • • Location-specific: Bardhaman, West Bengal (713101) under SBI procurement
  • • Quantity flexibility: Up to 25% increase/decrease at contracted rates during and after award
  • • Delivery logic: Delivery period tied to last date of original order; extended period calculated with a minimum 30 days

Tender Overview

The State Bank of India (SBI) invites bids in Bardhaman, West Bengal (ZIP 713101) for airconditioners, standard installation, standard accessories, plug top fittings, and iron brackets. Estimated value is ₹250,000. The BOQ shows 5 items with no itemized quantities, suggesting a small, equipment-focused procurement. The procurement emphasizes installation readiness and ancillary accessories, making it essential to supply complete installation-ready units. The buyer’s terms include an option to adjust quantities by up to 25%, at contracted rates, across the contract duration, with delivery timelines linked to the original order schedule. This clause directly impacts bid sizing, delivery planning, and post-award flexibility.

Technical Specifications & Requirements

  • Product/service: Airconditioners with Standard Installation, Standard Accessories, Plug top fittings, and Iron brackets.
  • Location: Bardhaman, West Bengal 713101; delivery/installation scope at SBI premises within the district.
  • No explicit technical specs or performance metrics provided in the tender text; bidders should rely on typical commercial airconditioner standards and on-site installation requirements, ensuring compatibility with standard SBI electrical and safety norms.
  • Key commercial terms include the 25% quantity option and a delivery period aligned to the original order, with extensions calculated as per a defined formula.
  • Estimated value indicates a modest procurement, suggesting preferred supplier readiness and streamlined compliance.

Terms, Conditions & Eligibility

  • EMD: Not specified in the available data; bidders should verify exact amount in the official tender portal during bid submission.
  • Delivery: Delivery period commences from the last date of the original delivery order; additional time calculated by (Increased quantity / Original quantity) × Original delivery period, minimum 30 days.
  • Payment: Not detailed in the provided terms; confirm payment terms (milestones, advance, or post-delivery) in the tender documents.
  • Quantity flexibility: Up to 25% increase/decrease allowed; contractor must adhere to contracted rates.
  • Compliance: Bidders must align with SBI procurement policies and ensure installation readiness and safety compliance for airconditioning equipment.

Key Specifications

  • Product/service names: Airconditioners, Standard Installation

  • Quantities: 5 items in BOQ; exact quantities not listed in data

  • Estimated value: ₹250,000

  • Standards/certifications: Not specified in tender data; ensure ISI/ISO compliance if required by SBI

  • Delivery/installation: On-site installation at SBI Bardhaman location; ensure electrical safety compliance

  • Warranty/AMC: Not specified in data; verify during bid submission

  • OEM/Brand: Not specified; verify if SBI requires specific brand or model

Terms & Conditions

  • Quantity adjustment up to 25% at contracted rates during and after award

  • Delivery period starts from last date of original delivery order with minimum extension rules

  • EMD amount and payment terms to be confirmed in official bid documentation

  • Installation-ready supply including standard accessories, plug top, and iron brackets

  • No explicit technical specifications provided; bidders must meet standard industry and SBI safety norms

Important Clauses

Payment Terms

Payment terms not specified in data; bidders must verify in tender documents and align with SBI procurement norms

Delivery Schedule

Delivery period commences from the last date of the original delivery order; extension formula: (Increased quantity / Original quantity) × Original delivery period, minimum 30 days

Penalties/Liquidated Damages

No LD details provided; verify in official tender package for potential penalties or performance guarantees

Bidder Eligibility

  • Proven experience in supplying and installing airconditioning systems for staggered procurement

  • Financial stability demonstrated via latest financial statements or solvency proof

  • GSTIN active and compliant with state tax requirements

Advertisement

Tender Data

Bid Details

Quantity

15

Category

Airconditioners

Bid Type

Two Packet Bid

Bid Validity

30 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

Yes

Startup Exemption/Relaxation

Yes

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

1

OEM Avg. Turnover

1

Past Performance

10 %

Experience Required

1 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Airconditioners , Standard Installation , Standard Accessories , Plug top , Iron bracket

Payment Timelines

Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

15

Delivery Locations

1

Delivery Cities

Purba Bardhaman

Delivery Pincodes

713101

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
ANTARA MITRA713101,SBI, RBO I, BURDWAN, MUNICIPAL MARKET COMPLEX, 1ST FLOOR, COURT COMPOUND, PURBA BARDHAMANPurba BardhamanWest Bengal713101315-

Authority Records

MINISTRY OF FINANCEFINANCIAL SERVICES DEPARTMENTSTATE BANK OF INDIA

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-10084609.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Office Name

Kolkata

Grievance Contact

[email protected]

Bill of Quantities (BOQ) 5 Items Sign in for GEM prices

#1

Airconditioners

2.0TR 5star Inverter

3 pieces Delivery: 15 days
#2

Standard Installation

Labour charges

3 pieces Delivery: 15 days
#3

Standard Accessories

OEM Installation kit

3 pieces Delivery: 15 days
#4

Plug top

3 pin 16 AMP

3 pieces Delivery: 15 days
#5

Iron bracket

Outdoor Stand

3 pieces Delivery: 15 days
Advertisement

Categories 15

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

PAN card

3

Experience certificates for similar airconditioning installation projects

4

Financial statements or solvency certificate

5

EMD submission proof (amount to be confirmed in portal)

6

Technical bid documents and compliance statements

7

OEM authorization (if applicable) and installation expertise credentials

Frequently Asked Questions

Key insights about WEST BENGAL tender market

How to bid for SBI airconditioners tender in Bardhaman 2026

Bidders should register on the SBI/GEM portal, obtain the official tender package, submit GST, PAN, EMD proof, installation capability documents, and OEM authorizations if required. Ensure installation readiness for on-site work in Bardhaman and comply with the 25% quantity option during contract execution.

What documents are required for SBI airconditioning installation bid in West Bengal

Required documents include GST certificate, PAN card, experience certificates for similar installs, financial statements, EMD proof, technical bid, and OEM authorization or installation capability credentials. Verify any additional SBI portal requirements and ensure submission before the bid closing date.

What are the delivery terms for SBI Bardhaman airconditioners tender

Delivery starts after the last date of the original delivery order. If quantities increase, the extended period is calculated as (increased quantity/original quantity) × original delivery period, with a minimum of 30 days. Ensure onsite installation readiness at Bardhaman premises.

What is the estimated value and scope of SBI airconditioning procurement 2026

The estimated value is ₹250,000 for five items in the BOQ, covering airconditioners, standard installation, accessories, plug top fittings, and iron brackets. Exact item quantities are not listed, so confirm during bid submission and plan for installation-ready units.

Are there any specific brand or certification requirements for SBI tender

The tender data does not specify brands or certifications; bidders should verify if SBI requires ISI/ISO compliance or OEM brands in the official package and provide corresponding certifications or attestations with the bid.

What are the payment terms for SBI airconditioning supply contract in West Bengal

Payment terms are not detailed in the data; bidders must confirm with SBI during tender clarification. Prepare for typical arrangements (milestones, advance payment, or post-delivery payment) and include clear invoicing terms in the bid response.

Advertisement