Bids are Invited For ID FAN IMPELLER WITH SHAFT AND HUB in ROHTAK, HARYANA
N/A
ROHTAK, HARYANA
Bid Publish Date
02-Jul-2026, 9:42 am
Bid End Date
17-Jul-2026, 10:00 am
Location
Progress
Quantity
1
Bid Type
Two Packet Bid
Uttar Pradesh Cooperative Sugar Factories Federation Limited invites bids for the supply of ID fan impeller fully fitted with shaft. The documented scope references a single procurement item with no BOQ items listed, indicating a potentially streamlined supply of complete assembly. Notably, the contract terms empower the purchaser with an option to adjust quantity up to ±25% during and after award, affecting delivery planning. The procurement is positioned within the UP state industrial sector, with emphasis on ensuring compatibility of impeller assemblies for ID fans in sugar factory operations. The emphasis on an integrated impeller-shaft unit implies stringent alignment and dynamic balance considerations, even though technical specs are not disclosed in this notice. The tender’s unique aspect lies in the quantity-flexibility clause and extended delivery calculations, which bidders must model into their project schedules and pricing.
Option clause allows ±25% quantity change at contract and during currency
Delivery extension computed by (increased/original) × original period, min 30 days
Original delivery date governs schedule; extended period may be used for timing
ATC document uploaded; bidders must review for compliance requirements
No explicit EMD, payment terms, or warranty disclosed in current data
Not specified in available data; bidder must confirm terms in ATC
Delivery starts from the last date of the original delivery order; option-driven extension with minimum 30 days
Not disclosed in current data; verify in ATC
Experience in supplying ID fan components or equivalent powered-rotating assemblies
Demonstrated ability to meet delivery extensions under option clauses
Financial capacity to handle variations in order quantity up to 25%
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
SUPPLY OF ID FAN IMPELLER COMPLETELY FITTED WITH SHAFT
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
ATC
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
N/A
ROHTAK, HARYANA
The Fertilisers And Chemicals Travancore Limited
ERNAKULAM, KERALA
Salem Steel Plant
SALEM, TAMIL NADU
N/A
VADODARA, GUJARAT
Rourkela Steel Plant
SUNDERGARH, ODISHA
Tender Results
Loading results...
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar ID fan impeller supply
Financial statements or turnover evidence
EMD/Security deposit documents (as applicable in ATC)
Technical compliance documents (if any)
OEM authorization or factory certificate for shafted impeller assemblies
Any other bidder qualification documents specified in ATC
Bidders should review the ATC uploaded by the buyer, confirm quantity variation rules (±25%), and model delivery timelines using the specified formula. Prepare OEM authorizations, GST, PAN, financials, and experience certificates. Ensure compliance with any IS/AAA/TRTL standards mentioned in the ATC and submit complete technical proposals.
Submit GST certificate, PAN card, experience certificates for similar assemblies, financial statements, EMD documents if required, OEM authorization, and technical compliance certificates if specified in ATC. Include any manufacturer manuals or drawings as needed for the fitted shaft assembly.
Delivery can be extended up to 25% for increased quantity during currency, calculated as (increased quantity ÷ original quantity) × original delivery period, with a minimum extension of 30 days. If original is shorter than 30 days, the extension equals the original period.
The current notice references ISI/AAA/TRTL terms; bidders must verify exact standard codes and certification bodies in the ATC. Prepare documentation proving compliance with the relevant standards and include any laboratory test reports or manufacturer certifications as required.
Delivery starts from the last date of the original delivery order. Extended delivery times apply only if the option clause is exercised, using the prescribed extension formula with a minimum of 30 days.
Eligibility includes proven experience in supplying ID fan assemblies or equivalent, financial capacity to absorb order variations, and compliance with OEM authorizations. Submit GST, PAN, experience certificates, and ATC-compliant technical documents to demonstrate capability.
Review the ATC-documented technical requirements, verify the impeller’s shaft integration compatibility, and confirm balancing, material thickness, and mounting interfaces. Prepare drawings or installation manuals if requested and ensure packaging and transit protection for finished assemblies.
The BOQ shows zero items in this notice, signaling a potential single-assembly quote. Bidder should seek clarification on whether a full assembly, mounting hardware, and balancing service are included in the quoted price.
Rourkela Steel Plant
📍 SUNDERGARH, ODISHA
N/a
📍 KHERI, UTTAR PRADESH
Directorate Of Purchase And Stores
📍 KHAMMAM, TELANGANA
📍 TELANGANA
Haryana Board Corporation
📍 YAMUNANAGAR, HARYANA
Sign up now to access all documents
Main Document
ATC
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS