Supply and Installation of 1.5 ton, 3 star Non inverter split AC,Supply and Installation of 5KVA Do
Directorate General Of Lighthouses And Lightships
RAMANATHAPURAM, TAMIL NADU
Bid Publish Date
02-Nov-2024, 1:24 pm
Bid End Date
25-Nov-2024, 3:00 pm
EMD
₹55,812
Value
₹27,90,575
Progress
Quantity
795
Category
Supply of 1.5Ton 5 Star rated Inverter Split AC units
Bid Type
Two Packet Bid
Bharat Sanchar Nigam Limited Portal(bsnl) announces a tender for Supply of 1. 5Ton 5 Star rated Inverter Split AC units, Installation Testing and Commissioning of 1. 5Ton 5 Star rated Invereter Split AC units, Providing and Fixing of L shaped powder coated MS bracket, Providing and laying of additional copper refrigerant pipes, Supply and laying of extra copper cable for Split Ac units 3 core 2. 5sqmm, Supply and laying of extra copper cable for Split Ac units 4 core 2. 5sqmm, Providing and laying additional drain pipes, Providing and charging of additional refrigerant gas, Supply and fixing of MCB protected Socket outlet box. Quantity: 795. Submission Deadline: 25-11-2024 15: 00: 00. Last date to apply is approaching fast!
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Directorate General Of Lighthouses And Lightships
RAMANATHAPURAM, TAMIL NADU
Hindustan Petroleum Corporation Ltd
MUMBAI, MAHARASHTRA
Bharat Sanchar Nigam Limited Portal(bsnl)
Iocl- Srpl
TIRUVALLUR, TAMIL NADU
Bharat Sanchar Nigam Limited Portal(bsnl)
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | Supply of 1.5Ton 5 Star rated Inverter Split AC units | Supplying of BEE approved 1.5 TR 5 Star rated Inverter or dual inverter type split Air Conditioning unit having nominal rated cooling capacity not less than 5100 watts with copper Evaporator and Condenser coil and Rotary Compressor suitable for operation on single phase 230 V plus or minus 10 percentage 50 Hz AC supply minimum room air flow 500 CFM and minimum Indian Seasonal Energy Efficient Ratio ISEER 5.20 filled with R32 or R410A refrigerant gas with installation kit comprising of standard lengths of copper refrigerant pipes PU or foam insulation drain pipe and interconnection copper cable etc complete as reqd. The manufacturers or suppliers shall give a warranty of the airconditioner for 15 months from date of supply or 12 months from date of installation whichever is earlier. Thereafter 4 years or 48months additional warranty on PCB of Indoor and Out door printed circuit board card and 9 years or 108 months additional warranty on the compressor. | 50 | each | sde_ele_kpt | 60 |
| 2 | Installation Testing and Commissioning of 1.5Ton 5 Star rated Invereter Split AC units | Installation Testing and commissioning of 1.5 TR Split AC Unit and mounting or Fixing of indoor and outdoor unit and fixing of refrigerant piping with expanded polythene foam insulation and laying of cable for interconnections and laying drain pipe of standard length which is supply along with AC unit with minor civil work including making holes on wall for laying refrigerant pipe lines and control cable and drain pipes and closing the extra openings with cement sand and making good the damages etc as reqd. Extra length of Refrigerant piping and cable shall be paid extra | 50 | each | sde_ele_kpt | 60 |
| 3 | Providing and Fixing of L shaped powder coated MS bracket | Providing and fixing of suitable size L shaped powder coated MS bracket 2nos per set for fixing of the outdoor unit of the split AC units and fixing on wall with anchor bolts and drilling holes etc complete as reqd. | 50 | set | sde_ele_kpt | 60 |
| 4 | Providing and laying of additional copper refrigerant pipes | Providing and laying of additional refrigerant copper pipe for suction and discharge line of size not less than one by fourth inches and half inches dia or as recommended by the manufacturer along with expanded polythene foam insulation including cutting brazing and making joint etc as reqd. The measurement shall be taken on linear basis for one circuit which includes suction and discharge line and foam insulation. | 150 | mtr | sde_ele_kpt | 60 |
| 5 | Supply and laying of extra copper cable for Split Ac units 3 core 2.5sqmm | Supplying and laying of Extra Electrical cable of 3 core 2.5 sqmm PVC insulated and sheathed copper for electrical connection of AC units etc as reqd. Make Finolex or Polycab or Havells or L and T. | 150 | mtr | sde_ele_kpt | 60 |
| 6 | Supply and laying of extra copper cable for Split Ac units 4 core 2.5sqmm | Supplying and laying of Extra Electrical cable of 4 core 2.5 sqmm PVC insulated and sheathed copper for electrical connection of indoor and outdoor units of ACs etc as reqd. Make Finolex or Polycab or Havells or L and T. | 150 | mtr | sde_ele_kpt | 60 |
| 7 | Providing and laying additional drain pipes | Providing and laying of additional drain pipe of size 25mm dia polythene or U PVC of M class-ISI marked pipe along with all accessories and fixing on surface of wall with saddles or C clamps if required suitable for drainage of condensate water etc as reqd. | 150 | mtr | sde_ele_kpt | 60 |
| 8 | Providing and charging of additional refrigerant gas | Providing of additional R32 or R410A refrigerant gas if required and charging or top up into the Split AC units etc as reqd. | 15 | kg | sde_ele_kpt | 60 |
| 9 | Supply and fixing of MCB protected Socket outlet box | Supply and Fixing of MCB protected 3 pin socket outlet boxes with metal board consisting of 1 no 20 Amps 3 pin socket outlet with 20 Amps plug top and 1 no 20 or25 amps SP MCB of C series suitable for 220 to 230 volts single phase 50 Hz AC supply as required. | 30 | each | sde_ele_kpt | 60 |
Extended Deadline
25-Nov-2024, 3:00 pm
Opening Date
25-Nov-2024, 3:30 pm
These are the final prices after the reverse auction event. Prices may be lower than initial bids.
| Rank | Seller | Final Price | Item |
|---|---|---|---|
| L1 | ANASUYA REFRIGERATION(MII) Under PMA Winner | ₹20,60,832 | Item Categories : Supply of 1.5Ton 5 Star rated Inverter Split AC units,Installation Testing and Commissioning of 1.5 |
| L2 | PUSHPAK COMMODEAL PRIVATE LIMITED (MSE,MII) Under PMA | ₹20,79,290 | Item Categories : Supply of 1.5Ton 5 Star rated Inverter Split AC units,Installation Testing and Commissioning of 1.5 |
| L3 | m.psc (MSE,MII) Under PMA | ₹21,54,398 | Item Categories : Supply of 1.5Ton 5 Star rated Inverter Split AC units,Installation Testing and Commissioning of 1.5 |
🎉 L1 Winner
ANASUYA REFRIGERATION(MII) Under PMA
Final Price: ₹20,60,832
To participate in the tender, the eligibility requirements typically include being a registered entity capable of providing similar services, demonstrating previous successful engagements, and complying with stipulated technical and safety standards.
Participants must provide verification of their registration along with compliance certificates pertaining to quality standards relevant to air conditioning installations and electrical setups.
The registration process involves creating an account on the designated bid platform, completing necessary forms, and submitting required documents digitally as specified in the tender documentation.
Accepted document formats generally include PDF and JPG for clarity and legibility. Check the tender documentation for specific instructions related to file types to ensure compatibility.
Technical specifications include energy-efficient models adhering to BIS standards that highlight performance and efficiency metrics required for installations, ensuring compliance with national quality norms.
Bidders must ensure compliance with Bureau of Indian Standards (BIS) and any additional requirements stipulated by the issuing authority, ensuring the equipment meets or exceeds set performance benchmarks.
Yes, all installations must comply with local electrical safety codes and standards, ensuring that every component is installed to maximize safety and efficiency.
Testing criteria generally encompass performance evaluations based on energy consumption, cooling effectiveness, and operational efficiency, as stipulated by the tender.
The EMD for this tender is quantified at ₹55,812, which serves as a security measure to ensure the serious participation of bidders in the procurement process.
Post-selection, successful bidders may be required to provide a performance guarantee to ensure contract compliance, typically expressed as a percentage of the contract value.
Payment terms include details on the schedule of payments tied to milestones during the project, often linked to the delivery and installation of the units.
Price evaluations focus on the total bid value while considering quality specifications; higher evaluations are favored for bids showing stronger compliance with technical standards and cost-effectiveness.
All submissions should be made electronically through the specified portals, ensuring adherence to document preparation guidelines and deadlines.
Key timelines including submission and evaluation dates are provided in the tender documentation, which bidders are advised to review thoroughly.
The evaluation process includes assessing both technical capabilities and financial offerings through a comparative methodology, ensuring fairness in selection based on outlined criteria.
Notifications regarding the results of bid evaluations are typically sent electronically to the registered emails of the bidders once the evaluation process concludes.
Sign up now to access all documents
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS