TenderDekho Logo
GEM

Central Board Of Excise And Customs Hydrogen/Nitrogen/Zero Air Generator Tender Visakhapatnam Andhra Pradesh 2026

Bid Publish Date

13-Apr-2026, 7:27 pm

Bid End Date

06-May-2026, 2:00 pm

EMD

₹1,00,000

Progress

Issue13-Apr-2026, 7:27 pm
Technical29-04-2026 18:14:26
Financial
Award18-Jun-2026, 10:07 am
Explore all 4 tabs to view complete tender details

Quantity

6

Category

Hydrogen Generator

Bid Type

Two Packet Bid

Key Highlights

  • Critical equipment categories: Hydrogen/Nitrogen/Zero Air Generators, Oil-Free Air Compressor, Magnetic Particle Trap, Air Preparation Set, CRM
  • EMD amount: ₹100,000; bid security requirements to be confirmed in tender terms
  • Option Clause: +/-25% quantity adjustment at contract placement and during currency
  • Delivery extension formula: (additional quantity / original quantity) × original delivery period, min 30 days
  • ATC document uploaded by Buyer; bidders must review for compliance specifics
  • 6 BoQ items exist but exact quantities are not disclosed in provided data
  • Location: Visakhapatnam, Andhra Pradesh; CBEC procurement under Department Of Revenue
  • Standards/brand requirements not specified; plan OEM authorizations if applicable

Categories 20

Tender Overview

Organization: Central Board Of Excise And Customs (cbec) under the Department Of Revenue, requested procurement in Visakhapatnam, Andhra Pradesh for multiple atmospheric gas generation and air-processing equipment, including Hydrogen Generator, Nitrogen Generator, Zero Air Generator, Oil-Free Air Compressor, Magnetic Particle Trap, Air Preparation Set and CRM. The project comprises 6 total items with an estimated quantity/value not disclosed, and an EMD of ₹100,000. The tender includes an Option Clause enabling ±25% quantity variation at contract, and delivery timelines linked to the original delivery order. The ATC/BoQ details exist but item-level data is not provided. This tender targets suppliers capable of meeting government security and process gas purity standards for CBEC operations.

Technical Specifications & Requirements

  • Product/service category: gas generation and air preparation equipment
  • Locations: Visakhapatnam, Andhra Pradesh; procurement scope covers installation and commissioning where applicable
  • EMD: ₹100,000 (Bid security)
  • Quantity flexibility: ±25% of bid quantity; extension logic: (additionalQuantity/originalQuantity) × originalDeliveryPeriod, minimum 30 days
  • Delivery terms: commas and indexing defined in option clause; delivery period starts after last date of original delivery order
  • BoQ status: 6 items listed; specific quantities/units not disclosed in BoQ
  • ATC docs: ATC file uploaded by Buyer; bidders should review for compliance requirements
  • Standards/quality: explicit standards not provided in tender data; bidders must infer from equipment category and CBEC reliance on modern gas generation equipment
  • OEM/brand requirements: not specified; bidders should prepare OEM authorizations if applicable
  • Warranty/AMC: not specified in provided data; verify in ATC/document terms

Terms, Conditions & Eligibility

  • EMD: ₹100,000 to be provided as per tender terms
  • Delivery & quantity: option to increase/decrease quantity by up to 25%; delivery schedule linked to last delivery order date with extended period rules
  • ATC/Additional terms: Bidder must comply with Buyer Added ATC and view uploaded ATC document
  • BoQ specifics: 6 items; exact quantities not disclosed; respond with flexible pricing for varied quantities
  • Submission docs: ensure compliance with CBEC terms and validity across provided terms
  • Eligibility criteria: no explicit years/turnover stated; prepare standard government supplier credentials and warranty evidence as applicable

Key Specifications

  • Hydrogen/Nitrogen/Zero Air Generators, Oil-Free Air Compressor, Magnetic Particle Trap, Air Preparation Set, CRM

  • EMD: ₹100,000; 25% quantity variation permitted; delivery extensions as per option clause

  • 6 BoQ items; exact quantities not provided; focus on capability to supply multiple units and systems

  • Review ATC document for bidder compliance and any brand/OEM specifics

  • No explicit standards in data; prepare IS/ISO-compatible options if applicable

Terms & Conditions

  • Quantity may vary ±25% with contract; delivery calculations tied to original order date

  • EMD amount fixed at ₹100,000; submission must align with CBEC ATC terms

  • BoQ lists 6 items but lacks unit quantities; ensure flexible pricing for variable scopes

Important Clauses

Payment Terms

Details not provided; verify in ATC/PT terms; expect standard government terms and security deposit

Delivery Schedule

Delivery period starts from last date of original delivery order; option for extended periods based on quantity change

Penalties/Liquidated Damages

Not specified in data; confirm LD/penalties in ATC terms and contract

Bidder Eligibility

  • Experience in supplying gas generation and air handling equipment to government agencies

  • Ability to provide OEM authorizations and after-sales support

  • Financial stability with required GST and PAN compliance

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Hydrogen Generator , Nitrogen Generator , Zero Air Generator , Oil-Free Air Compressor , magnetic particle trap , Air preparation set and CRM

Authority Records

MINISTRY OF FINANCEREVENUE DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9218316.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 6 Items Sign in for GEM prices

#1

Hydrogen Generator

Hydrogen Gas Generator As per the specification

1 no Delivery: 90 days
#2

Nitrogen Generator

Nitrogen Gas As per the specification

1 no Delivery: 90 days
#3

Zero Air Generator

Zero Air Generator As per the specification

1 no Delivery: 90 days
#4

Oil-Free Air Compressor

Oil-Free Air Compressor 3 HP

1 no Delivery: 90 days
#5

magnetic particle trap

magnetic particle trap

1 no Delivery: 90 days
#6

Air preparation set and CRM

Air preparation set and suitable CRM

1 set Delivery: 90 days

Required Documents

1

GST registration certificate

2

PAN card

3

Experience certificates for similar gas generation/air equipment procurement

4

Financial statements (balance sheet, P&L) for last 2-3 years

5

EMD submission proof (DD or online payment receipt)

6

Technical bid documents and compliance statements

7

OEM authorization letters (if bidding on behalf of OEM)

8

Any certificates of warranty/AMC terms (if specified in ATC)

Technical Results

S.No Seller Item Date Status
1
ATHENA INSTRUMENTS PRIVATE LIMITED   Under PMA
-29-04-2026 18:14:26
2
Jet Age Garage Equipments   Under PMA
-05-05-2026 11:26:21
3
LEODAVIN SCIENTIFICS   Under PMA
-05-05-2026 17:20:03
4
PARSHWA ENTERPRISES   Under PMA
-06-05-2026 12:27:55
5
PARYAVARAN TECHNOLOGIES   Under PMA
-06-05-2026 13:58:21
6
RAHUL KUMAR   Under PMA
-06-05-2026 13:16:10

Financial Results

Rank Seller Price Item
L1
LEODAVIN SCIENTIFICS(MII)   Under PMA
Item Categories : Hydrogen Generator,Nitrogen Generator,Zero Air Generator,Oil-Free Air Compressor,magnetic particle
L2
PARSHWA ENTERPRISES (MII)   Under PMA
Item Categories : Hydrogen Generator,Nitrogen Generator,Zero Air Generator,Oil-Free Air Compressor,magnetic particle

Contract / Result Documents 1

Please sign in or create an account to view contract details and download result documents.

Frequently Asked Questions

Key insights about ANDHRA PRADESH tender market

How to bid on Visakhapatnam CBEC gas generator tender 2026

Bidders must submit GST, PAN, and to- be- confirmed EMD ₹100,000 along with technical and financial bids. Review the uploaded ATC document for compliance, provide OEM authorizations if bidding on behalf of OEM, and ensure capability to supply Hydrogen/Nitrogen/Zero Air Generators and related air equipment at CBEC Visakhapatnam.

What documents are required for CBEC gas equipment tender 2026

Required documents include GST certificate, PAN card, 2-3 years of financial statements, experience certificates for similar gas-generation projects, EMD proof, technical bid, OEM authorizations, and any warranty/AMC terms. Ensure documents align with the 6-item BoQ scope and ATC terms.

What are the delivery terms for CBEC Visakhapatnam tender

Delivery terms permit ±25% quantity variation. Delivery period begins after the last date of the original delivery order. Extended time is calculated by (additional quantity/original quantity) × original delivery period, with a minimum of 30 days.

What standards or certifications are required for CBEC gas equipment

The tender data does not specify explicit standards. Respond with ISO/IEC compatible quality management where possible and provide OEM-certified equipment documentation. Confirm ISI/IS standards only if ATC terms indicate such requirements.

What is the EMD amount for the CBEC procurement

The EMD amount is ₹100,000. Submit via DD or online as per bidder terms. Ensure EMD validity is maintained through evaluation and contract award periods per ATC terms.

How many items are in the BoQ for CBEC Visakhapatnam tender

The BoQ lists 6 items, but the exact quantities and units are not disclosed in the provided data. Prepare a flexible pricing approach for multi-unit gas generation and air equipment orders.

What is the location for the CBEC gas equipment tender 2026

The procurement location is Visakhapatnam, Andhra Pradesh 530001. Suppliers should ensure local logistics readiness, installation support, and service capabilities in this city and surrounding areas.

What is the significance of the ATC document in CBEC tender

The ATC document is uploaded by the Buyer and contains bid-specific terms. Bidders must review and follow these terms to ensure compliance, including any special clauses, performance criteria, or supplier qualifications.