Boring of 03 holes,Chemical analysis,Soil classification,Calculation,Soil test report
Indian Army
Bid Publish Date
01-Nov-2024, 3:54 pm
Bid End Date
22-Nov-2024, 4:00 pm
EMD
₹20,442
Progress
Quantity
20209
Category
Topographical Survey No 1
Bid Type
Two Packet Bid
Armed Forces Tribunal announces a tender for Topographical Survey No 1, Soil Investigation, Shifting, Boring 1, Boring 2, Boring 3, Collection of UDS, Carrying out standard, Excavation of trial pit, Conducting all necessary test, Report Submission. Quantity: 20209. Submission Deadline: 22-11-2024 16: 00: 00. Last date to apply is approaching fast!
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
Office Of Dg R & D (r & M)
SOUTH WEST DELHI, DELHI
Indian Army
SONITPUR, ASSAM
Indian Army
ERNAKULAM, KERALA
Indian Army
DARJEELING, WEST BENGAL
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | Topographical Survey No 1 | Carrying out topographical survey including with total station and eqpt giving travarse area and spot levels at 2x2m submision of contour plan at 1m interval siting of proposed bldgs retaining wall roads and ref pillars and submission of complete report all as specified (Please ref details in specification Marking of existing near by major structure roads existing building and all available ground features like roads culverts coastline electric telephone poles etc Preparation and submission of the contour plan at 1.00 m interval and cross section of the area at a locations Siting of the proposed Bldgs retaining walls and roads etc in the most economic way involving minimum cutting and filling.All corners of the proposed bldgs and centre line of roads and proposed retaining walls shall be marked on ground with approiate reference pillars of size not less than 150x150mm and 1.5m height (60 cm embedded in ground in concrete and the pillars duly painted as diretcted Layout of the proposed bldgs shall be marhed duly adhering to the CRZ norms by siting beyond 200m from the High tide line Study of the existing drainage pattern of the site possibility of water logging and high flood level of the area Compiliation of all the data and submission of a draft report for verification by GE Four Copies of the Final Report Both Soft and Hard Copy shall be submitted duly incorporating all the modification and comments on the draft report Each set of Final Report shall comprise of typed and bound report on entire survey work giving basis of survey work reference points and bench marks used the sources of their information summary of instruments used tabular statements of plot area co ordinates and elevations of all survey pedestals and four sets of Auto CAD Drgs on tracing paper and four sets on A3 size white paper incl soft copy in 4 DVDs containing Drgs in Auto Cad and PDF formats | 20,000 | sqm | buyergepcentral | 30 |
| 2 | Soil Investigation | Mobilization of plants and equipment incl men and materials as required at site for soil investigation Work all as specifed | 1 | ls | buyergepcentral | 75 |
| 3 | Shifting | Shifting of men materials and equipments from one bore to another bore location inclding setting of boring as all specified | 7 | per bore hole | buyergepcentral | 75 |
| 4 | Boring 1 | Boring 150mm dia bore holes to a depth of 10m through following type of strata all as specified Any type of soil | 56 | rm | buyergepcentral | 75 |
| 5 | Boring 2 | Boring 150mm dia bore holes to a depth of 10m through following type of strata all as specified Soft Rock | 16 | rm | buyergepcentral | 75 |
| 6 | Boring 3 | Boring 150mm dia bore holes to a depth of 10m through following type of strata all as specified Hard Rock | 8 | rm | buyergepcentral | 75 |
| 7 | Collection of UDS | Collection of undisturbed soil samples at every 3m intervals of at any change of strata in 100mm bore thin walled tube including waxing sealing packing transporting to the lab all as specified | 24 | nos | buyergepcentral | 75 |
| 8 | Carrying out standard | Carrying out standard penetration test SPT as per IS 2131 including collection of disturbed soil sasmples in bore holes at every 1.0m depth or at any change of strata and submit the report with all requisite data all as specified | 80 | nos | buyergepcentral | 75 |
| 9 | Excavation of trial pit | Excavatin of trial pit upto 3.0m depth having size 1.20x1.20m for collecting UDS sample incl soil tests of Atterberg NMC Wet and dry density etc all as specified. | 8 | nos | buyergepcentral | 75 |
| 10 | Conducting all necessary test | Conducting all necessary test of each bore hole i.e. Atterberg NMC Wet and dry density etc all as specified | 8 | nos | buyergepcentral | 75 |
| 11 | Report Submission | Submission of report in 06 copies incl bore log lab test recommendation and type of foundation and indicate water table all as specified | 1 | ls | buyergepcentral | 75 |
Experience Criteria
Past Performance
Bidder Turnover *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | GEO DESIGNS AND RESEARCH PRIVATE LIMITED Under PMA | - | 21-11-2024 17:46:19 | Qualified |
| 2 | M/S KARENG CONSTRUCTION & CIVIL ENGINEERING CONSULTANCY Under PMA | - | 04-11-2024 18:57:32 | Qualified |
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | GEO DESIGNS AND RESEARCH PRIVATE LIMITED(MSE,MII)( MSE Social Category:General ) Under PMA | ₹9,74,000 | Item Categories : Topographical Survey No 1,Soil Investigation,Shifting,Boring 1,Boring 2,Boring 3,Collection of UDS, |
| L2 | M/S KARENG CONSTRUCTION & CIVIL ENGINEERING CONSULTANCY (MSE,MII)( MSE Social Category:General ) Under PMA | ₹31,38,000 | Item Categories : Topographical Survey No 1,Soil Investigation,Shifting,Boring 1,Boring 2,Boring 3,Collection of UDS, |
The eligibility requirements include being a registered entity and demonstrating a minimum of three years of experience in soil investigation projects. MSEs and startups have the opportunity for exemptions based on supporting documentation that proves their relevance and capacity.
Bidders must provide evidence of past performance related to similar projects, technical qualifications, and relevant registrations. Additional certifications that affirm expertise in conducting soil tests and investigation processes may also be requested during evaluation.
To register for this tender, potential bidders must maintain an active registration status as a legal entity. Once registered, they need to follow the submission protocols outlined in the tender documentation while making sure to adhere to the specifications laid out for participation.
Submissions must comply with specified formats as detailed in the tender documentation. Usually, formats include PDF for reports and technical specifications, along with any standard forms that the Department of Defence specifies.
The technical specifications necessitate rigorous attention to topographical surveys, boring techniques, and the ability to conduct standard soil tests. Competence in excavating trial pits and collecting undisturbed samples are also crucial components.
Bidders are expected to comply with industry-standard quality standards relevant to soil investigation, ensuring that all tests and methodologies meet the regulatory requirements stipulated by the Department of Defence.
Yes, all bidders must adhere to the compliance requirements established by the Department of Defence regarding environmental regulations, safety protocols, and other applicable guidelines throughout the execution of the soil investigation.
Testing criteria will include conducting necessary geological and physical tests on the soil samples collected. The specific tests and methodologies will be referenced in the official specifications document.
Bidders are required to submit an Earnest Money Deposit (EMD) of INR 20,442 along with their proposal to demonstrate their commitment to the tender. Details related to submission formats for EMD will be outlined in the tender documentation.
Upon successful award of the tender, bidders may be required to furnish a performance guarantee as mandated. The exact percentage and terms will be defined in the contractual agreement post-evaluation.
Payment terms will typically be structured based on the milestones achieved during the project execution. Detailed payment schedules will be outlined in the final agreement upon contract signing.
Price evaluation will focus on total value, ensuring that the final determination will consider both financial proposals and technical qualifications to select the most advantageous offer.
Document bids should be submitted electronically via the official tender portal, ensuring compliance with all stated instructions in the tender document for successful reception.
While specific dates are not noted, bidders must reference the tender document for precise submission timelines, noting crucial stages in the evaluation and award process.
The evaluation and selection process will assess both technical and financial proposals, performed as a total value wise evaluation, ensuring fairness and transparency in awarding the contract.
Results will typically be communicated through official channels, detailing successful bidders from the evaluation process. Bidders should ensure they monitor communication from the Department of Defence.
MSEs are granted specific exemptions from certain eligibility criteria, allowing greater participation in government contracts, thereby promoting inclusive economic growth.
Startups are similarly afforded exemptions regarding experience requirements, encouraging new entrants to engage and flourish within the government contracting framework.
The tender emphasizes the 'Make in India' initiative by promoting local content and indigenous processes. Bidders are encouraged to comply with set policies supporting domestic procurement.
Bidders must align their proposals with the local content requirements established by the Department of Defence, ensuring that significant components of the project are sourced locally to promote regional capabilities.
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS