Procurement Opportunity: Experiment Identify various fuse sets viz HRC DO,Experiment Identify the various types of CB MCB EL in LATEHAR, JHARKHAND

Bid Publish Date

04-Jul-2026, 10:48 am

Bid End Date

20-Jul-2026, 2:00 pm

EMD

₹1,00,000

Value

₹90,00,000

Progress

Issue04-Jul-2026, 10:48 am
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

35

Category

Experiment Identify the various types of CB MCB ELCB and MCCB

Bid Type

Two Packet Bid

Categories 51

Public procurement opportunity for N/a Experiment Identify various fuse sets viz HRC DO, Experiment Identify the various types of CB MCB ELCB and MCCB, Experiment Demonstrate Installation operation and maintenance of SF Six circuit breaker, Earth Fault Realy Testing Kit, Under Voltage OR OverVoltage Relay Testing Kit, Bucholz Relay Test Setup, Measurement of Power and Power Factor, Power Factor Improvement using Capacitor, Identifcation of different types of parts of under ground cables, Cable Testing Fault and Insulation, Meter Measurement using Energy Meter, Capacitive Load Ten Amp Three Phase, Sub station Earthing System Study, Study of DC Motor Parts and Construction One HP DC Shunt Motor, Starting of DC Shunt Motor Three Point Starter Starting and Reversing of DC Shunt Motor, Speed Control of DC Shunt Motor Field Control Method, Identifiy the parts of Special Machines, Load Test of DC Shunt Motor, Study of Three Phase Induction Motor, Starting of Three Phase Induction Motor DOL Starter, No Load and Blocked Rotor Test Induction Motor, Speed Control of Induction Motor, Study of Single Phase Induction Motor, Reversal of Direction of Induction Motor, Study of Synchronous Motor, Measurement of Slip of Induction Motor, Determination of transient and sub transient reactance of a Three phase alternator in LATEHAR, JHARKHAND. Quantity: 35 issued by. Submission Deadline: 20-07-2026 14: 00: 00. View full details and respond.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

Experiment Identify various fuse sets viz HRC DO , Experiment Identify the various types of CB MCB ELCB and MCCB , Experiment Demonstrate Installation operation and maintenance of SF Six circuit breaker , Earth Fault Realy Testing Kit , Under Voltage OR OverVoltage Relay Testing Kit , Bucholz Relay Test Setup , Measurement of Power and Power Factor , Power Factor Improvement using Capacitor , Identifcation of different types of parts of under ground cables , Cable Testing Fault and Insulation , Meter Measurement using Energy Meter , Capacitive Load Ten Amp Three Phase , Sub station Earthing System Study , Study of DC Motor Parts and Construction One HP DC Shunt Motor , Starting of DC Shunt Motor Three Point Starter Starting and Reversing of DC Shunt Motor , Speed Control of DC Shunt Motor Field Control Method , Identifiy the parts of Special Machines , Load Test of DC Shunt Motor , Study of Three Phase Induction Motor , Starting of Three Phase Induction Motor DOL Starter , No Load and Blocked Rotor Test Induction Motor , Speed Control of Induction Motor , Study of Single Phase Induction Motor , Reversal of Direction of Induction Motor , Study of Synchronous Motor , Measurement of Slip of Induction Motor , Determination of transient and sub transient reactance of a Three phase alternator

Authority Records

HIGHER AND TECHNICAL EDUCATION DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9548546.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 27 Items Sign in for GEM prices

#1

Experiment Identify various fuse sets viz HRC DO

As Per Specification

2 pieces Delivery: 45 days
#2

Experiment Identify the various types of CB MCB ELCB and MCCB

As Per Specification

2 pieces Delivery: 45 days
#3

Experiment Demonstrate Installation operation and maintenance of SF Six circuit breaker

As Per Specification

1 pieces Delivery: 45 days
#4

Earth Fault Realy Testing Kit

As Per Specification

1 pieces Delivery: 45 days
#5

Under Voltage OR OverVoltage Relay Testing Kit

As Per Specification

1 pieces Delivery: 45 days
#6

Bucholz Relay Test Setup

As Per Specification

1 pieces Delivery: 45 days
#7

Measurement of Power and Power Factor

As Per Specification

1 pieces Delivery: 45 days
#8

Power Factor Improvement using Capacitor

As Per Specification

2 pieces Delivery: 45 days
#9

Identifcation of different types of parts of under ground cables

As Per Specification

1 pieces Delivery: 45 days
#10

Cable Testing Fault and Insulation

As Per Specification

1 pieces Delivery: 45 days
#11

Meter Measurement using Energy Meter

As Per Specification

1 pieces Delivery: 45 days
#12

Capacitive Load Ten Amp Three Phase

As Per Specification

1 pieces Delivery: 45 days
#13

Sub station Earthing System Study

As Per Specification

2 pieces Delivery: 45 days
#14

Study of DC Motor Parts and Construction One HP DC Shunt Motor

As Per Specification

1 pieces Delivery: 45 days
#15

Starting of DC Shunt Motor Three Point Starter Starting and Reversing of DC Shunt Motor

As Per Specification

2 pieces Delivery: 45 days
#16

Speed Control of DC Shunt Motor Field Control Method

As Per Specification

2 pieces Delivery: 45 days
#17

Identifiy the parts of Special Machines

As Per Specification

1 pieces Delivery: 45 days
#18

Load Test of DC Shunt Motor

As Per Specification

2 pieces Delivery: 45 days
#19

Study of Three Phase Induction Motor

As Per Specification

1 pieces Delivery: 45 days
#20

Starting of Three Phase Induction Motor DOL Starter

As Per Specification

1 pieces Delivery: 45 days
#21

No Load and Blocked Rotor Test Induction Motor

As Per Specification

1 pieces Delivery: 45 days
#22

Speed Control of Induction Motor

As Per Specification

1 pieces Delivery: 45 days
#23

Study of Single Phase Induction Motor

As Per Specification

1 pieces Delivery: 45 days
#24

Reversal of Direction of Induction Motor

As Per Specification

1 pieces Delivery: 45 days
#25

Study of Synchronous Motor

As Per Specification

1 pieces Delivery: 45 days
#26

Measurement of Slip of Induction Motor

As Per Specification

1 pieces Delivery: 45 days
#27

Determination of transient and sub transient reactance of a Three phase alternator

As Per Specification

2 pieces Delivery: 45 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover

7

Additional Doc 1 (Requested in ATC)

8

Additional Doc 2 (Requested in ATC)

9

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

10

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer