Progress
The Indian Air Force invites bids for the SUIT JODHPURI category procurement in Bidar, Karnataka 585226. The tender requires submission of an ATC-attached technical specification document duly signed with a rubber stamp. No BOQ items are listed, and no start/end dates or estimated value are provided in the data. The key differentiator is the mandatory adherence to the ATC-specified technical requirements and the explicit instruction to submit the signing stamp-bearing specification. Bidders should prepare to align with Army/Air Force apparel standards and ensure readiness for post-award compliance checks.
Product/service names: SUIT JODHPURI (uniform apparel)
Quantities: Not specified in BOQ; verify in ATC
Estimated value: Not provided
Experience requirements: Not specified in data; ATC may specify
Quality/standards: ATC must specify standards; expect fabric, stitching, color, and finish criteria
Delivery/installation: May be clarified in ATC
Documentation: ATC-attached specifications required
ATC-driven technical specification requiring rubber-stamped signature
No BOQ or value details provided; seek clarification
Mandatory submission of ATC documentation with bid
Not specified in data; confirm terms in ATC and bid documents
Not specified in data; ATC may define timelines for uniform supply
Not specified; verify in ATC and standard IAF procurement terms
Participation likely contingent on acceptance of ATC-specified technical standards
Possession of required conformity documents or OEM authorizations as per ATC
Compliance with IAF procurement norms for uniform apparel
Quantity
9
Bid Type
Single Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
Yes
Bid Splitting Applied
No
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
SUIT JODHPURI
Max Delivery Days
30
Delivery Locations
1
Delivery Cities
Bidar
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | Bidar | Bidar | - | - | 9 | 30 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
ATC-attached technical specification document duly signed and stamped
Any OEM authorization or brand conformity documents required by ATC
Bidder qualification documents per ATC guidance (if specified in ATC)
General tender submission documents (GST certificate, PAN, company details) as per standard IAF procurement practices
Any conformity certificates or testing reports referenced in the ATC
Key insights about KARNATAKA tender market
Bidders must submit the ATC-attached technical specification documents signed and stamped, along with standard corporate paperwork (GST, PAN, etc.). Verify any OEM authorizations if required by the ATC. Ensure compliance with uniform fabric, stitching, color and finish criteria defined in the ATC.
Required documents include the ATC-attached technical specification with official stamp, OEM authorizations if applicable, GST registration, PAN card, company details, and any conformity or testing reports specified in the ATC. Prepare digital and hard copies as per bid submission guidelines.
The ATC contains the definitive technical specification for the SUIT JODHPURI, including fabric type, stitching quality, color accuracy, finish, and size grading. The signed stamp confirms compliance; no values are listed in data, check ATC for exact textile standards and measurement tolerances.
Delivery timelines are defined in the ATC; since the data lacks explicit dates, bidders must review the ATC document to confirm production lead times, dispatch windows, and on-site delivery or installation requirements, if any.
Payment terms are not specified in the provided data. The ATC may define milestones, advance payments, or post-delivery payments. Review the ATC and alignment with IAF standard terms during bid clarification to ensure cash flow and acceptance criteria.
Eligibility likely includes compliance with ATC-specified standards, possession of OEM/brand authorizations if required, and standard supplier qualifications (GST, PAN, financial viability). Confirm detailed eligibility in the ATC and bid documents to avoid disqualification.
The ATC is a mandatory document accompanying the bid; access it during bid submission or via the tender portal. Ensure it is signed with the official rubber stamp; submit the compliant ATC along with all required documents and any OEM authorizations requested.
Standards will be specified in the ATC; bidders should anticipate fabric quality, color fastness, seam durability, and finish tests. Prepare documentation demonstrating compliance with these standards and be ready to present testing reports or certifications as per ATC guidance.