Organization: Indian Army (Department Of Military Affairs) in Srinagar, Jammu & Kashmir. Procuring Switch Disconnectors and Fuse Combination Units (Switch Fuse Unit) conforming to IS/IEC 60947-3, Miniature Circuit Breaker Boards for voltages conforming to IS 13032, and LED Bulkhead Light (Q2-Q3). Tender scope references quantity variation up to 25% of bid quantity during and after contract, with delivery timelines adjustable per option clause. EMD/guarantee terms reference Bank Guarantee/DD payable at Srinagar for CWE (AF) Srinagar. Items must be E-in-C approved and in category 1 per ATC. No BOQ items listed.
Switch Disconnectors and Fuse Units conforming to IS/IEC 60947-3
MCB Boards rated for voltages per IS 13032
Minimum Short Circuit Breaking Capacity to be specified in tender
Number of poles, busbar current rating, and MCB operating method
Electrical enclosure compatibility and dimensions
OEM warranty and replacement timelines (30 days)
EMD payable as Bank Guarantee/DD to Srinagar; proof to be uploaded
Quantity variation up to 25% during/after contract; extended delivery rules
OEM authorization and three-year turnover evidence required
EMD via Bank Guarantee/DD in favor of Headquarters CWE (AF) Srinagar; proof to be uploaded with bid
Delivery period adjustable via option clause; additional time formula applies with minimum 30 days
Not explicitly stated; contract allows extended delivery with option clause and penalties implicit in delivery extensions
OEM must demonstrate last three fiscal year turnover
Resellers must provide CA turnover certificate
Must provide OEM authorization specific to the bid and product category
Quantity
67
Category
Switch Disconnectors and Fuse Combination Units (Switch Fuse Unit) Conforming To IS/IEC 60947 (Part 3)
Bid Type
Two Packet Bid
Bid Validity
45 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
RA Qualification Rule
50% Lowest Priced Technically Qualified Bidders
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Min. Avg. Annual Turnover
25
OEM Avg. Turnover
10
Past Performance
80 %
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Switch Disconnectors and Fuse Combination Units (Switch Fuse Unit) Conforming To IS/IEC 60947 (Part 3) (Q2) , Miniature Circuit Breaker Boards for Voltages Conforming To IS 13032 (Q3) , LED Bulkhead Light (Q3)
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
AWANTIPORA
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | AWANTIPORA | AWANTIPORA | - | - | 8 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
OEM Authorization certificate (for specific bid with bid number)
Turnover of OEM for last three financial years
CA certificate showing turnover of reseller for last three FYs
Warranty certificate for each product from OEM
Proof of EMD – Bank Guarantee or DD in favor of Headquarters CWE (AF) Srinagar
MRP/Pricelist of product/item
Upload of bid-specific reseller certificate if applicable
| Category | Specification | Requirement |
|---|---|---|
| RATINGS | Utilization Category | AC-23A |
| RATINGS | Number of Poles | 4 Pole |
| RATINGS | Rated Current (in Ampere) | 100 |
| RATINGS | Rated Impulse withstand Voltage (in KV) | 3 |
| RATINGS | Minimum Rated Short Circuit Breaking Capacity (in KA, rms) | 3 |
| FUSE UNIT | Type of Fuse | Fuse Unit-Cylindrical . DIN fuse-link |
Bidders must submit OEM authorization, last three FY turnover, CA turnover certificate if reseller, and warranty certificates. Include EMD via Bank Guarantee/DD payable to Headquarters CWE (AF) Srinagar, along with MRP/pricelist and bid-specific reseller certificates. Compliance with IS/IEC 60947-3 and IS 13032 is mandatory; ensure E-in-C Category 1 status.
Submit OEM authorization for the bid, turnover certificates for the last 3 FYs, CA certificate for resellers, warranty certificates from OEM, EMD proof, MRP/pricelist, and bid-specific reseller certificate if applicable. Ensure IS 13032 compliance and provide product datasheets demonstrating voltage/current ratings.
The buyer may increase or decrease quantity by up to 25% at contract placement and during the currency. The extended delivery time uses the formula (Increased quantity ÷ Original quantity) × Original delivery period with a minimum of 30 days, subject to contract terms and final orders.
Items must be IS/IEC 60947-3 compliant for switch fuse units and IS 13032-compliant for MCB boards. Ensure OEM is able to provide ISI/BIS marks if required and confirm category 1 E-in-C approval. Include certification documents with bid submission.
OEM warranty must cover defective items with replacement delivered to consignee within 30 days of intimation. The supplier bears all replacement costs, and warranty certificates must be submitted for each product.
Submit Bank Guarantee or DD in favor of Headquarters CWE (AF) Srinagar, with proof uploaded in the bid package. Ensure the EMD amount matches bid document requirements and attach the bank guarantee copy and payment confirmation in the bid submission folder.
Provide OEM authorization specific to the bid, last three FY turnover, and CA certificate for resellers if applicable. The bid requires Category 1 E-in-C branding, and items must be OEM-manufactured or authorized through the OEM with proper documentation.
Submit the MRP/pricelist of each item, along with OEM authorization and turnover certificates. Ensure compliance with IS/IEC standards and include any price variation allowances under the 25% option clause; bid price should reflect optional quantity changes.