Bid Publish Date
25-May-2026, 2:15 pm
Bid End Date
29-Jul-2026, 2:00 pm
EMD
₹30,000
Value
₹15,00,000
Progress
Quantity
1
Bid Type
Two Packet Bid
Hll Infra Tech Services Limited invites bids for Refrigerated Centrifuge For General And Research Purpose (Q3). Quantity: 1. Submission Deadline: 29-07-2026 14: 00: 00. Submit your proposal before the deadline.
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Refrigerated Centrifuge For General And Research Purpose (Q3)
Advisory Bank
ICICI
ePBG Percentage
5%
ePBG Duration (Months)
26
Payment Timelines
Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
45
Delivery Locations
1
Delivery Cities
South
Delivery Pincodes
110068
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Abhik Das | 110068,AIIMS CAPFIMS, Maidan Garhi, New Delhi | South | Delhi | 110068 | 1 | 45 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
GEM_CATEGORY_SPECIFICATION
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
| Category | Specification | Requirement |
|---|---|---|
| Performance Parameters | Type of Motor | Brushless(without carbons), With Carbon Brushless |
| Performance Parameters | Type of lid lock | Both Manual and Electronic, Electronic lid locking with automatic lid opening at end of run, click seal biocontainment lid |
| Performance Parameters | No of acceleration and deceleration profiles in built for rotor speed while automatic braking | "Programmable from 50 to 200 Seconds in Interval of 5 Seconds", Acceleration & Deceleration time to be less than 15 sec, Not available, Acceleration and Deceleration Profile-9/10, Option to accelerate and decelerate speed at various rates, Time Set Range 1 min – 99 min; 1 min increments |
| Performance Parameters | Configuration of Rotor supplied with centrifuge machine | Swing Out, Angle rotor, swing out and angle rotor |
| Performance Parameters | Size of rotor supplied with centrifuge in ml | "4x100 ml(for angle rotor) RPM 13000", "6x50 mL(for angle rotor) RPM 13000", "8x25 ml(for angle rotor) RPM 13000", "12x15ml(for angle rotor) RPM 13000", "4 Micro Strips( for angle rotor) RPM 13000", "12x2ml(for angle rotor) RPM 20000", "24x1.5ml(for angle rotor) RPM 16000", "8x5ml(for angle rotor) RPM 16000", "24X2 ml(for angle rotor) RPM 16000", "8X15 ml(for angle rotor) RPM 13000", "24 x 0.5 ml( for angle rotor) RPM 20000", "16X15 ml(for angle rotor) RPM 6000", "24x15ml(for angle rotor) RPM 6000", 16x15ml((For swing out type rotor RPM 5000), 24x15ml(FOR swing out type rotor RPM 5000), 32x15ml(FOR swing out type rotor RPM 5000), 4x50ml(FOR swing out type rotor RPM 5000), 2 Micro Plates of 96 wells Each(FOR swing out type RPM 3000), 2 micro plates of 96 wells each (for swing out type or angle rotor RPM 3500), PCR strip rotor with 1500 rpm/18000G which can hold upto 4xPCR strips RPMI15000, 6x100 with 15000rpm, 8x50, 14500rpm, 30x15ml, 5650rpm, 30x2ml, 15200 rpm, 30x2ml, 14000rpm, 18x5ml, 15000rpm, Adapter for 4x50ml 5000rpm, 24 Microplates 4200rpm, 16 Microplates 4700rpm, Fixed Angle Rotor accommodating atleast 24 x 1.5/2 ml tubes (go upto a speed of approximately 14000 RPM) |
| Performance Parameters | Warranty period for equipment & Rotor (on site and comprehensive warranty) in years | 1, 2, 3, 4, 5 |
| Additional Parameters | Condensed Water Drainage System | Yes, No |
| Additional Parameters | The Equipment shall be installed and demonstrated before Acceptance | Yes, No(No installation and demonstration required and consignee can install) |
| Additional Parameters | Servo Controller Voltage Stabilizer supplied with Item | Yes, No |
| Additional Parameters | Servo stabilizer ratings in KVA | 1, 2, Not supplied, 5 KVA |
| Additional Parameters | Warranty of stabilizer in years | 3, 4, 5, NA(If no stabilizer provided) |
Discover companies most likely to bid on this tender
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
Additional Doc 1 (Requested in ATC)
Additional Doc 2 (Requested in ATC)
Additional Doc 3 (Requested in ATC)
Additional Doc 4 (Requested in ATC)
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Extended Deadline
29-Jul-2026, 2:00 pm
Opening Date
29-Jul-2026, 2:30 pm
Extended Deadline
14-Jul-2026, 2:00 pm
Opening Date
14-Jul-2026, 2:30 pm
Extended Deadline
29-Jun-2026, 2:00 pm
Opening Date
29-Jun-2026, 2:30 pm
Sign up now to access all documents
Main Document
GEM_CATEGORY_SPECIFICATION
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS