TenderDekho Logo
Closed GEM

Goa Shipyard Limited High Pressure Pneumatic Fender Tender Goa 2026 ISI/ISO Compliant

Bid Publish Date

20-Mar-2026, 6:20 pm

Bid End Date

24-Apr-2026, 3:00 pm

Generate Docs

Progress

Issue20-Mar-2026, 6:20 pm
Technical24-04-2026 14:45:57
Financial
AwardCompleted
Explore all 4 tabs to view complete tender details

Quantity

1400

Category

HIGH PRESSURE PNEUMATIC FENDER with all accessories including Foot pump Fenders to be shifted between P and S as per requirement Dia 250x 900 L

Bid Type

Two Packet Bid

Key Highlights

  • Defence procurement through Goa Shipyard Limited in South Goa for high pressure pneumatic fenders
  • Diameter 250 mm and 900 L length specification implied; includes HMPE rope, thimble, shackle, and rubber/pneumatic fenders
  • Option clause allowing up to 50% quantity variation during contract and extended delivery time calculations
  • PBG (Performance Bank Guarantee) submission required per buyer terms; ATC uploaded
  • Delivery and installation to support shifting between P and S configurations as required
  • BoQ lists 35 items; specific quantities not disclosed in the provided data

Categories 6

Tender Overview

Goa Shipyard Limited of the Department Of Defence Production invites bids for a complete package of HIGH PRESSURE PNEUMATIC FENDER systems with all accessories, including foot pumps, fenders for shifting between positions, and related hardware (Dia 250 x 900 L, HMPE lines, ordinary thimbles, shackles, light weight rubber or pneumatic fenders) to be deployed in SOUTH GOA, GOA 403105. The procurement scope covers 35 BOQ items, with an estimated quantity and value to be confirmed, and requires delivery coordination with interchanging P and S configurations as per operational demand. The bid includes an option clause permitting up to 50% quantity variation during contract execution, at contracted rates, with delivery time recalculation. A Performance Bank Guarantee (PBG) and ATC compliance are mandatory per buyer terms. This tender emphasizes formal compliance and delivery readiness under defence production procurement norms.

Technical Specifications & Requirements

  • Product category: HIGH PRESSURE PNEUMATIC FENDER with all accessories (foot pump, fender hanging rope HMPE, thimble, shackle, and lightweight rubber or pneumatic fender)
  • Dimensions: Diaz 250, length 900 L (as specified in description)
  • Accessories included: foot pump, HMPE hanging rope, ordinary thimble, shackle
  • Delivery terms: option to increase quantity up to 50% of bid quantity and extended delivery period calculations; delivery starts after the original delivery order end date
  • Contract terms: PBG to be submitted by bidder; ATC document uploaded; compliance with buyer added terms
  • Location: SOUTH GOA, GOA 403105; procurement for defence production requirements within government framework

Terms, Conditions & Eligibility

  • EMD/Performance Guarantee: PBG to be submitted as per buyer added commercial terms; exact amount not disclosed in data
  • Delivery schedule: extended delivery time rules apply when option clause is exercised; minimum extension calculated as described and may extend to original delivery period
  • Documentation: ATC document uploaded; PBG and required certifications to be provided; GST and vendor qualification documents as per T&C
  • Eligibility: bidder must comply with the commercial terms, include PBG, and meet standard procurement requirements for defence production in Goa

Key Specifications

  • Product: HIGH PRESSURE PNEUMATIC FENDER with accessories

  • Dimensions: Dia 250 mm, length 900 L

  • Accessories: Foot pump, HMPE fender hanging rope, ordinary thimble, shackle

  • Material/Type: Lightweight rubber or pneumatic fender as specified

  • Standards/Certifications: Not specified in data; ensure ISI/ISO compliance if applicable

Terms & Conditions

  • Option clause allows up to 50% quantity variation at contracted rates

  • PBG to be submitted as per buyer terms; ATC document uploaded

  • Delivery period calculations follow original and extended delivery periods with defined formulas

Important Clauses

Payment Terms

PBG submission and compliance with buyer commercial terms; exact payment milestones not disclosed

Delivery Schedule

Delivery period adjustments based on option clause; time extension formula: (Increased quantity ÷ Original quantity) × Original delivery period, min 30 days

Penalties/Liquidated Damages

Not specified in data; terms indicate adherence to standard defence procurement penalties via ATC

Bidder Eligibility

  • Demonstrated capability to supply high pressure pneumatic fenders with required accessories

  • Compliance with PBG submission and ATC upload

  • Ability to meet 50% quantity variation and extended delivery terms

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

HIGH PRESSURE PNEUMATIC FENDER with all accessories including Foot pump Fenders to be shifted between P and S as per requirement Dia 250x 900 L , FENDER HANGING ROPE HMPE , ORDINARY THIMBLE , SHACKLE , LIGHT WEIGHT RUBBER or PNEUMETIC FENDER

Authority Records

MINISTRY OF DEFENCEDEFENCE PRODUCTION DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 6

GeM-Bidding-9149046.pdf

Main Document

Other Documents

OTHER

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 35 Items Sign in for GEM prices

#1

HIGH PRESSURE PNEUMATIC FENDER with all accessories including Foot pump Fenders to be shifted between P and S as per requirement Dia 250x 900 L

Fenders

10 nos Delivery: 90 days
#2

FENDER HANGING ROPE HMPE

Fenders

125 mtr Delivery: 90 days
#3

ORDINARY THIMBLE

Fenders

20 nos Delivery: 90 days
#4

SHACKLE

Fenders

40 nos Delivery: 90 days
#5

LIGHT WEIGHT RUBBER or PNEUMETIC FENDER

Fenders

5 nos Delivery: 90 days
#6

HIGH PRESSURE PNEUMATIC FENDER with all accessories including Foot pump Fenders to be shifted between P and S as per requirement Dia 250x 900 L

Fenders

10 nos Delivery: 270 days
#7

FENDER HANGING ROPE HMPE

Fenders

125 mtr Delivery: 270 days
#8

ORDINARY THIMBLE

Fenders

20 nos Delivery: 270 days
#9

SHACKLE

Fenders

40 nos Delivery: 270 days
#10

LIGHT WEIGHT RUBBER or PNEUMETIC FENDER

Fenders

5 nos Delivery: 270 days
#11

HIGH PRESSURE PNEUMATIC FENDER with all accessories including Foot pump Fenders to be shifted between P and S as per requirement Dia 250x 900 L

Fenders

10 nos Delivery: 270 days
#12

FENDER HANGING ROPE HMPE

Fenders

125 mtr Delivery: 270 days
#13

ORDINARY THIMBLE

Fenders

20 nos Delivery: 270 days
#14

SHACKLE

Fenders

40 nos Delivery: 270 days
#15

LIGHT WEIGHT RUBBER or PNEUMETIC FENDER

Fenders

5 nos Delivery: 270 days
#16

HIGH PRESSURE PNEUMATIC FENDER with all accessories including Foot pump Fenders to be shifted between P and S as per requirement Dia 250x 900 L

Fenders

10 nos Delivery: 270 days
#17

FENDER HANGING ROPE HMPE

Fenders

125 mtr Delivery: 270 days
#18

ORDINARY THIMBLE

Fenders

20 nos Delivery: 270 days
#19

SHACKLE

Fenders

40 nos Delivery: 270 days
#20

LIGHT WEIGHT RUBBER or PNEUMETIC FENDER

Fenders

5 nos Delivery: 270 days
#21

HIGH PRESSURE PNEUMATIC FENDER with all accessories including Foot pump Fenders to be shifted between P and S as per requirement Dia 250x 900 L

Fenders

10 nos Delivery: 540 days
#22

FENDER HANGING ROPE HMPE

Fenders

125 mtr Delivery: 540 days
#23

ORDINARY THIMBLE

Fenders

20 nos Delivery: 540 days
#24

SHACKLE

Fenders

40 nos Delivery: 540 days
#25

LIGHT WEIGHT RUBBER or PNEUMETIC FENDER

Fenders

5 nos Delivery: 540 days
#26

HIGH PRESSURE PNEUMATIC FENDER with all accessories including Foot pump Fenders to be shifted between P and S as per requirement Dia 250x 900 L

Fenders

10 nos Delivery: 540 days
#27

FENDER HANGING ROPE HMPE

Fenders

125 mtr Delivery: 540 days
#28

ORDINARY THIMBLE

Fenders

20 nos Delivery: 540 days
#29

SHACKLE

Fenders

40 nos Delivery: 540 days
#30

LIGHT WEIGHT RUBBER or PNEUMETIC FENDER

Fenders

5 nos Delivery: 540 days
#31

HIGH PRESSURE PNEUMATIC FENDER with all accessories including Foot pump Fenders to be shifted between P and S as per requirement Dia 250x 900 L

Fenders

10 nos Delivery: 540 days
#32

FENDER HANGING ROPE HMPE

Fenders

125 mtr Delivery: 540 days
#33

ORDINARY THIMBLE

Fenders

20 nos Delivery: 540 days
#34

SHACKLE

Fenders

40 nos Delivery: 540 days
#35

LIGHT WEIGHT RUBBER or PNEUMETIC FENDER

Fenders

5 nos Delivery: 540 days

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates for similar high-pressure pneumatic fender projects

4

Financial statements showing turnover and financial stability

5

EMD/Security deposit document as per buyer terms

6

Technical bid documents and OEM authorizations as applicable

7

ATC document uploaded by bidder

8

PBG (Performance Guarantee) document

Corrigendum Updates

2 Updates
#1

Update

16-Apr-2026

Extended Deadline

24-Apr-2026, 3:00 pm

Opening Date

24-Apr-2026, 3:30 pm

#2

Update

10-Apr-2026

Extended Deadline

17-Apr-2026, 3:00 pm

Opening Date

17-Apr-2026, 3:30 pm

Technical Results

S.No Seller Item Date Status
1
IRM OFFSHORE AND MARINE ENGINEERS PRIVATE LIMITED   Under PMA
-24-04-2026 14:45:57

Financial Results

Rank Seller Price Item
L1
IRM OFFSHORE AND MARINE ENGINEERS PRIVATE LIMITED(MSE,MII)( MSE Social Category:General )    Under PMA
Item Categories : HIGH PRESSURE PNEUMATIC FENDER with all accessories including Foot pump Fenders to be shifted betwe

Frequently Asked Questions

Key insights about GOA tender market

How to bid for the high pressure fender tender in Goa?

Bidders must submit GST, PAN, experience certificates, financials, EMD, and ATC-compliant technical bid. Include OEM authorizations if required and upload the PBG as per buyer terms. Ensure compliance with the option clause allowing 50% quantity variation and prepare for delivery timelines under extended periods.

What documents are required for fender procurement in Goa Shipyard Limited?

Required documents include GST certificate, PAN card, experience certificates for similar projects, financial statements, EMD/Security deposit, technical bid with ATC, OEM authorizations, and PBG. Ensure documents cover delivery terms and compliance with defence production procurement norms.

What are the key technical specs for the fender tender in Goa?

Key specs specify HIGH PRESSURE PNEUMATIC FENDER with accessories, Dia 250 mm, length 900 L, includes foot pump, HMPE rope, thimble, shackle, and optional lightweight rubber or pneumatic fender. Exact material standards not disclosed; bidders should ensure compatibility with defence requirements.

When is delivery expected for the Goa fender procurement?

Delivery terms allow extension via the option clause; calculation uses (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days. Final delivery dates align with the original delivery order and extended period if exercised.

What is the role of PBG in this fender tender in Goa?

PBG must be submitted by the bidding firm as per buyer-added commercial terms. It serves as performance security during contract execution and is mandatory alongside ATC compliance for defence-related procurement in Goa.

What are the eligibility criteria for the Goa fender bid 2026?

Eligible bidders should demonstrate capability to supply high pressure pneumatic fenders with required accessories, submit PBG and ATC, and meet 50% quantity variation and delivery terms. Prior experience in similar projects and financial stability are essential.