Indian Army Fuel Pump Assembly & Intake Filter Tender 2025 - Department of Military Affairs GEM Portal

Bid Publish Date

11-Dec-2025, 9:14 am

Bid End Date

22-Dec-2025, 10:00 am

Progress

Issue11-Dec-2025, 9:14 am
Technical20-12-2025 15:31:58
Financial
AwardCompleted
Explore all 4 tabs to view complete tender details

Quantity

3

Category

FUEL PUMP ASSY

Bid Type

Two Packet Bid

Key Highlights

  • Explicit 25% quantity variation right during and after contract.
  • Vendor Code Creation requires PAN, GSTIN, cancelled cheque, EFT mandate.
  • No BOQ items; both fuel pump assembly and intake filter assembly are the focus.
  • Delivery period tied to original delivery order date; extended time formula specified.
  • No stated EMD amount or payment terms in provided data.
  • GEM portal as submission channel; military procurement context.

Categories 3

Tender Overview

The opportunity is issued by the Indian Army under the Department Of Military Affairs for procurement of FUEL PUMP ASSEMBLY and INTAKE FILTER ASSEMBLY. The tender is processed through the GEM portal, with no explicit location or start/end dates disclosed. The contract includes a 50-75% price competitiveness expectation across items and reserves the right to modify quantities by up to 25% of the bid/contracted quantity. The scope emphasizes standardization and compatibility with military fuel system components. A unique differentiator is the option to scale orders mid-contract while maintaining contracted rates.

Technical Specifications & Requirements

  • No formal BOQ items are listed (Total Items: 0).
  • Bid terms include an option clause allowing quantity adjustments up to 25% during and after award, with delivery timing anchored to the original delivery schedule.
  • Bid submission requires basic vendor-code documentation: PAN Card, GSTIN, Cancelled Cheque, and EFT Mandate certified by Bank.
  • The procurement beats a dual-component focus: FUEL PUMP ASSEMBLY and INTAKE FILTER ASSEMBLY, without additional technical specs published in the tender data.
  • No explicit standards or performance metrics are provided in the tender text.

Terms, Conditions & Eligibility

  • The buyer reserves quantity adjustment rights up to 25% of bid/contracted quantity and can extend delivery time proportionally (minimum 30 days).
  • Bidder must submit the following with bid for Vendor Code Creation: PAN Card, GSTIN, Cancelled Cheque, EFT Mandate.
  • EMD or monetary guarantees aren’t stated in the provided terms; bidders should verify on portal.
  • No BOQ items or explicit delivery timelines beyond the option clause are included in the data; bidders should seek clarifications during bid prep.

Key Specifications

  • Product names: Fuel Pump Assembly, Intake Filter Assembly

  • No BOQ items specified

  • Estimated value: Not disclosed

  • EMD amount: Not disclosed

  • Delivery timing: linked to original delivery order; additional time via formula

  • Standards/Certifications: Not specified in data

Terms & Conditions

  • Quantity variation rights up to 25% during/after contract

  • Specific bid document requirements for Vendor Code Creation

  • Delivery time extension formula with minimum 30 days

Important Clauses

Payment Terms

Not specified in supplied data; verify on GEM portal during bid submission

Delivery Schedule

Delivery period commences from the last date of original delivery order; extended period calculated as (Additional quantity ÷ Original quantity) × Original delivery period, minimum 30 days

Penalties/Liquidated Damages

No LD details provided in data; bidder should review portal terms for penalties

Bidder Eligibility

  • Must participate via GEM portal for Indian Army contracts

  • Provide PAN, GSTIN, Cancelled Cheque, and EFT Mandate

  • No BOQ items listed; capability to supply fuel pump assemblies and intake filters

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

FUEL PUMP ASSY , INTAKE FILTER ASSEMBLE

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENTINDIAN ARMY

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-8698064.pdf

Main Document

Other Documents

OTHER

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Required Documents

1

PAN Card

2

GSTIN

3

Cancelled Cheque

4

EFT Mandate certified by Bank

5

Vendor Code Creation documents

Technical Results

S.No Seller Item Date Status
1
ORS MOTORS LLP   Under PMA
Make : Polaris Model : FUEL PUMP ASSY Title : FUEL PUMP ASSY20-12-2025 15:31:58
2
RIKI SECURITY SOLUTIONS PRIVATE LIMITED   Under PMA
Make : Polaris Model : FUEL PUMP ASSY Title : FUEL PUMP ASSY19-12-2025 15:24:11
3
TECHNO AUTOMOBILES PRIVATE LIMITED   Under PMA
Make : Polaris Model : FUEL PUMP ASSY Title : FUEL PUMP ASSY20-12-2025 11:45:55

Financial Results

Rank Seller Price Item
L1
RIKI SECURITY SOLUTIONS PRIVATE LIMITED   Under PMA
Item Categories : FUEL PUMP ASSY,INTAKE FILTER ASSEMBLE
L2
TECHNO AUTOMOBILES PRIVATE LIMITED   Under PMA
Item Categories : FUEL PUMP ASSY,INTAKE FILTER ASSEMBLE
L3
ORS MOTORS LLP   Under PMA
Item Categories : FUEL PUMP ASSY,INTAKE FILTER ASSEMBLE

Frequently Asked Questions

Key insights about JAMMU AND KASHMIR tender market

How to bid on the Indian Army fuel pump assembly tender in 2025?

Bidders must submit through the GEM portal with required vendor-code documents: PAN, GSTIN, cancelled cheque, and EFT mandate certified by bank. The tender allows quantity variation up to 25% and delivery time extensions based on the original delivery schedule. Ensure the bid includes both fuel pump assembly and intake filter assembly components and complies with portal-specific submission rules.

What documents are required for Indian Army intake filter tender submission in 2025?

Submit PAN Card, GSTIN, Cancelled Cheque, and EFT Mandate certified by Bank for Vendor Code Creation. Although no EMD amount is stated here, verify portal instructions. Maintain compliance with GEM submission formats and attach any OEM authorizations if applicable to fuel system components.

What are the delivery terms for the fuel pump assembly tender in 2025?

Delivery period starts from the last date of the original delivery order. If quantity increases, extended time is calculated as (Additional quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days. The purchaser may extend up to the original delivery period while exercising the option clause.

What is the eligibility criteria for supplying fuel pumps to Indian Army via GEM?

Eligibility requires participation through GEM, submission of PAN, GSTIN, cancelled cheque, and EFT mandate. While the data lacks explicit turnover or experience requirements, bidders should consult portal guidelines and provide standard procurement documents and any available OEM authorizations for fuel pump assemblies.

What standards apply to the fuel pump and intake filter tender?

The tender data does not specify any standards. Bidders should check the portal for referenced standards. If applicable, prepare to show compliance with relevant military or industrial standards and obtain necessary certifications for fuel system components used with Indian Army equipment.

When is the bid submission deadline for the fuel pump assembly tender in 2025?

The provided data does not include a deadline. Bidders must verify latest dates on the GEM portal and ensure submission before the cut-off, accounting for required vendor-code documents and any addenda issued by the Indian Army prior to the deadline.

What happens if the order quantity changes for this tender?

Up to 25% quantity variation is allowed by the purchaser at contract placement and during currency. The adjusted delivery time is calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days, ensuring continuity of supply for critical fuel system components.

Are there any penalties for late delivery in this GEM tender?

The data does not specify liquidated damages. Bidders should review the portal terms for penalties or LD clauses associated with delayed delivery and align contracts with Indian Army procurement risk management requirements.