TenderDekho Logo
Active GEM

Indian Air Force Tender Coimbatore Tamil Nadu 2026 – 52 Goods Supply for Automotive & Electrical Subsystems, DPM 2025 Compliance

Bid Publish Date

22-Oct-2026, 1:07 pm

Bid End Date

02-Nov-2026, 10:00 am

Progress

Issue22-Oct-2026, 1:07 pm
AwardPending

Key Highlights

  • • Brand/OEM warranty certificates required at delivery
  • • Dedicated toll-free service support must be provided by bidder/OEM
  • • 100% payment after completion certificate (PRI)
  • • DPM 2025 warranty and LD clauses apply

Tender Overview

The Indian Air Force, Department Of Military Affairs, seeks supply-only procurement of a broad range of automotive and mechanical components for equipment platforms, with activities centered in COIMBATORE, TAMIL NADU 641001. The BoQ lists 52 items across multiple categories such as clutch slave cylinders, master cylinders, hydraulic pipes, brake valves, door hardware, radiators, water pumps, bearings, steering joints, and related assemblies. The procurement emphasizes a single-supplier delivery model with price inclusive of all costs. Notable differentiators include mandatory OEM warranty certification, dedicated after-sales support, and adherence to the Buyer Added ATC scope. The opportunity requires alignment with the DPM 2025 framework and strict compliance with the ATC terms. Unique aspects include a broad internal catalog spanning automotive brake, steering, and door mechanism components, indicating a comprehensive spares and assemblies requirement for IAF platforms.

Technical Specifications & Requirements

  • Scope: Only supply of Goods (no services) per Bid Document and ATC.
  • Warranty: OEM warranty certificates required at delivery; warranty period aligned to specifications; rectification of any breakdown during the warranty must be guaranteed.
  • After-sales: Dedicated toll-free service support; well-established Installation, Commissioning, Training, Troubleshooting, and Maintenance networks in INDIA; service centers details to be uploaded with bid.
  • Payment & penalties: 100% payment after item/job completion certificate; LD and warranty clauses per DPM 2025; no extension after delivery period.
  • Certifications: Upload all certificates/documents sought in Bid document/ATC; non-compliance risks rejection; detailed terms in ATC documentation.
  • BOQ context: 52 total items; exact quantities/units not disclosed in public data; items include automotive and structural components.

Terms, Conditions & Eligibility

  • Scope of supply: Goods only; no turnkey installation.
  • Warranty: OEM warranty as per specifications; provide service center details near consignee.
  • Service support: Dedicated toll-free number required for service.
  • Payment: 100% payment after completion certificate/PRI.
  • Documentation: Upload all required certificates as per ATC; non-submission risks rejection; blacklisting for deviations.
  • Penalty/LD: Per DPM 2025 guidelines; no delivery extension after schedule.

Key Specifications

  • Product categories include clutch slave cylinders, master cylinders, hydraulic pipes (4000 PSS), RPM cables, brake valves, fan belts, door regulators, water pumps, radiators hoses, wheel cylinders, pressure plates, and associated assemblies

  • 14+ item families covered under 52 total items; exact quantities undisclosed

  • Warranty certification required from OEM; warranty period aligned to tender specifications

  • Dedicated after-sales service network in INDIA with service centers near consignee locations

  • 100% payment on completion certificate; LD clauses under DPM 2025

Terms & Conditions

  • EMD and certificates as per ATC; non-submission risks bid rejection

  • Delivery schedule governed by ATC; no extension after delivery period

  • 100% payment after item completion certificate (PRI) and final acceptance

Important Clauses

Payment Terms

100% payment after item completion certificate/PRI as per ATC; no interim payments specified

Delivery Schedule

Delivery timelines defined in ATC; no extension granted after delivery period

Penalties/Liquidated Damages

LD clauses apply per DPM 2025; penalties for delays and non-conformance

Bidder Eligibility

  • Experience in supplying automotive/electrical components to government or defense units

  • Demonstrated service network with OEM-authorized centers in INDIA

  • Ability to provide OEM warranty certificates and after-sales support

Advertisement

Tender Data

Bid Details

Quantity

126

Category

CLUTCH SLAVE CYLINDER

Bid Type

Single Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

Yes

Startup Exemption/Relaxation

Yes

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

CLUTCH SLAVE CYLINDER , MASTER CYLINDER ASSY , HYDRAULIC PIPE 4000 PSS , RPM CABLE , BRAKE VALVE , FAN BELT , COMPACT BRAKE VALVE , OIL PRESSURE GUAGE , DOOR OPENING HANDLE , ARMATURE , CLUTCH MASTER CYLINDER , BRUSH CARRIER , GEAR LINKAGE BALL JOINT , BRAKE CHAMBER FRONT , DOOR INNER REGULATOR HANDLE , BALL JOINT GSHF CONT LINK , CENTRE BEARING P SHAFT , RADIATOR HOSE , WATER PUMP ASSY , BRAKE MASTER CYLINDER , ASSY CLUTCH MASTER CYLINDER , BUSH , BRAKE PAD , POWER WINDOW MECHANISM COMPLETE ASSY , DOOR GLASS REGULATOR , DOOR HANDLE RH , CENTRE SUPPORT BEARING RUBBER , CYL CLUTCH MASTER , UJ CROSS PROPELLER SHAFT , ASSY BALL JOINT , CYL CLUTCH RELEASE , DOOR LOCK ASSY , DOOR OPENER FRONT OUTER LR , VACCUM BRAKE BOOSTER , WHEEL CYLINDER FRONT LH RH , WITHDRAWL BEARING CLUTCH , DOOR LOCK LH , DOOR LOCK RH , PRESSURE PLATE ASSY , BALL JOINT STEERING DRAG , CLUTCH PLATE , DOOR GLASS REGULATOR RH , CENTRE SUPPORT BEARING , TIE ROD END JOINTS , BUSH KIT RR , WHEEL CYLINDER

Delivery Details

Max Delivery Days

45

Delivery Locations

1

Delivery Cities

Coimbatore

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-CoimbatoreCoimbatore--145-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-10066084.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

Indian Air Force

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Bill of Quantities (BOQ) 52 Items Sign in for GEM prices

#1

CLUTCH SLAVE CYLINDER

CLUTCH SLAVE CYLINDER

1 each Delivery: 45 days
#2

MASTER CYLINDER ASSY

MASTER CYLINDER ASSY

1 each Delivery: 45 days
#3

HYDRAULIC PIPE 4000 PSS

HYDRAULIC PIPE 4000 PSS

2 mtr Delivery: 45 days
#4

RPM CABLE

RPM CABLE

1 each Delivery: 45 days
#5

BRAKE VALVE

BRAKE VALVE

1 each Delivery: 45 days
#6

FAN BELT

FAN BELT

2 each Delivery: 45 days
#7

COMPACT BRAKE VALVE

COMPACT BRAKE VALVE

1 each Delivery: 45 days
#8

OIL PRESSURE GUAGE

OIL PRESSURE GUAGE

1 each Delivery: 45 days
#9

DOOR OPENING HANDLE

DOOR OPENING HANDLE

5 each Delivery: 45 days
#10

ARMATURE

ARMATURE

1 each Delivery: 45 days
#11

CLUTCH MASTER CYLINDER

CLUTCH MASTER CYLINDER

1 each Delivery: 45 days
#12

BRUSH CARRIER

BRUSH CARRIER

1 each Delivery: 45 days
#13

GEAR LINKAGE BALL JOINT

GEAR LINKAGE BALL JOINT

4 each Delivery: 45 days
#14

BRAKE CHAMBER FRONT

BRAKE CHAMBER FRONT

2 each Delivery: 45 days
#15

DOOR INNER REGULATOR HANDLE

DOOR INNER REGULATOR HANDLE

5 each Delivery: 45 days
#16

BALL JOINT GSHF CONT LINK

BALL JOINT GSHF CONT LINK

4 each Delivery: 45 days
#17

CENTRE BEARING P SHAFT

CENTRE BEARING P SHAFT

1 each Delivery: 45 days
#18

RADIATOR HOSE

RADIATOR HOSE

2 each Delivery: 45 days
#19

WATER PUMP ASSY

WATER PUMP ASSY

1 each Delivery: 45 days
#20

BRAKE MASTER CYLINDER

BRAKE MASTER CYLINDER

2 each Delivery: 45 days
#21

ASSY CLUTCH MASTER CYLINDER

ASSY CLUTCH MASTER CYLINDER

1 each Delivery: 45 days
#22

BUSH

BUSH

2 each Delivery: 45 days
#23

CLUTCH SLAVE CYLINDER

CLUTCH SLAVE CYLINDER

1 each Delivery: 45 days
#24

BRAKE MASTER CYLINDER

BRAKE MASTER CYLINDER

1 each Delivery: 45 days
#25

BRAKE PAD

BRAKE PAD

4 each Delivery: 45 days
#26

POWER WINDOW MECHANISM COMPLETE ASSY

POWER WINDOW MECHANISM COMPLETE ASSY

1 each Delivery: 45 days
#27

DOOR GLASS REGULATOR

DOOR GLASS REGULATOR

2 each Delivery: 45 days
#28

DOOR HANDLE RH

DOOR HANDLE RH

2 each Delivery: 45 days
#29

CENTRE SUPPORT BEARING RUBBER

CENTRE SUPPORT BEARING RUBBER

2 each Delivery: 45 days
#30

CYL CLUTCH MASTER

CYL CLUTCH MASTER

1 each Delivery: 45 days
#31

UJ CROSS PROPELLER SHAFT

UJ CROSS PROPELLER SHAFT

2 each Delivery: 45 days
#32

ASSY BALL JOINT

ASSY BALL JOINT

2 each Delivery: 45 days
#33

CYL CLUTCH RELEASE

CYL CLUTCH RELEASE

1 each Delivery: 45 days
#34

DOOR LOCK ASSY

DOOR LOCK ASSY

2 each Delivery: 45 days
#35

DOOR OPENER FRONT OUTER LR

DOOR OPENER FRONT OUTER L&R

2 each Delivery: 45 days
#36

VACCUM BRAKE BOOSTER

VACCUM BRAKE BOOSTER

1 each Delivery: 45 days
#37

WHEEL CYLINDER FRONT LH RH

WHEEL CYLINDER FRONT LH RH

4 each Delivery: 45 days
#38

BRAKE MASTER CYLINDER

BRAKE MASTER CYLINDER

1 each Delivery: 45 days
#39

WITHDRAWL BEARING CLUTCH

WITHDRAWL BEARING CLUTCH

1 each Delivery: 45 days
#40

DOOR GLASS REGULATOR

DOOR GLASS REGULATOR

8 each Delivery: 45 days
#41

DOOR LOCK LH

DOOR LOCK LH

4 each Delivery: 45 days
#42

DOOR LOCK RH

DOOR LOCK RH

4 each Delivery: 45 days
#43

PRESSURE PLATE ASSY

PRESSURE PLATE ASSY

1 each Delivery: 45 days
#44

BALL JOINT STEERING DRAG

BALL JOINT STEERING DRAG

4 each Delivery: 45 days
#45

CLUTCH PLATE

CLUTCH PLATE

1 each Delivery: 45 days
#46

BRAKE PAD

BRAKE PAD

8 each Delivery: 45 days
#47

DOOR GLASS REGULATOR RH

DOOR GLASS REGULATOR RH

8 each Delivery: 45 days
#48

BUSH

BUSH

4 each Delivery: 45 days
#49

CENTRE SUPPORT BEARING

CENTRE SUPPORT BEARING

2 each Delivery: 45 days
#50

TIE ROD END JOINTS

TIE ROD END JOINTS

4 each Delivery: 45 days
#51

BUSH KIT RR

BUSH KIT RR

2 each Delivery: 45 days
#52

WHEEL CYLINDER

WHEEL CYLINDER

4 each Delivery: 45 days
Advertisement

Categories 38

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates for similar supply of automotive/electrical components

4

Financial statements (audited if available)

5

EMD documentation (as defined in ATC)

6

Technical bid documents and OEM authorizations

7

Certificates of conformity to required standards (as applicable in ATC)

Frequently Asked Questions

Key insights about TAMIL NADU tender market

How to bid for the IAF tender in Coimbatore with 52 item scope?

Bidders must submit GST, PAN, financial statements, OEM authorizations, and experience certificates; provide OEM warranty certificates and proof of after-sales service capability. Ensure compliance with ATC terms and DPM 2025 LD provisions; upload all required documents with the bid.

What documents are required for the IAF supply tender in Tamil Nadu?

Essential documents include GST registration, PAN, experience certificates for similar supplies, financial statements, EMD documentation, OEM authorization letters, technical compliance certificates, and service center details near the consignee; ATC-specified certifications must be uploaded.

What are the technical scope and product categories for this IAF tender?

The scope covers clutch and brake components, hydraulic pipes, regulator assemblies, door mechanisms, bearings, radiators, water pumps, wheel cylinders, and related assemblies across 52 items; items must be supplied as goods-only and include OEM warranty.

What is the payment term for the IAF procurement in Coimbatore?

The tender specifies 100% payment after item completion certificate/PRI; no advance or staged payments are described; ensure timely submission of completion certificates to trigger payment.

What are the warranty and after-sales requirements for this supply contract?

OEM warranty certificates must accompany delivery; warranty period aligns with tender specifications; bidder must maintain a service network in INDIA with toll-free support and upload center details near consignee.

What penalties apply if delivery is delayed under this ATC terms?

Penalties follow the LD clauses per DPM 2025; there is no extension after the delivery period; bidders should align production and logistics to meet the stated timeline in ATC.

How to verify OEM authorization and service capability for the IAF tender?

Submit OEM authorization documents and evidence of dedicated after-sales service centers; provide details of installation, commissioning, and maintenance teams; ensure centers are located near consignee destinations as required by ATC.

What is the scope of supply in this IAF tender—services or goods only?

The scope specifies goods only; no service or turnkey installation is included; supplier must provide complete goods with corresponding OEM warranties and after-sales service readiness.

Advertisement