TenderDekho Logo
Closed GEM

Open Tender for Civil-1,Civil-2,Civil-3,Civil-4,Civil-5,Civil-6,Civil-7,Civil-8,Civil-9,Civil-10,Tower-1,Tower-2,To in AMBALA, HARYANA

Bid Publish Date

17-Jun-2026, 12:33 pm

Bid End Date

17-Jul-2026, 3:00 pm

Value

₹5,08,43,000

Progress

RA
Issue17-Jun-2026, 12:33 pm
Reverse Auction28-Oct-2026, 5:00 pm
AwardPending

Bhakra Beas Management Board has released a public tender for Civil-1, Civil-2, Civil-3, Civil-4, Civil-5, Civil-6, Civil-7, Civil-8, Civil-9, Civil-10, Tower-1, Tower-2, Tower-3, Tower-4, Tower-5, Tower-6, Tower-7, Tower-8, Tower-9, Tower-10, Tower-11, Tower-12, Tower-13, Tower-14, Tower-15, Tower-16, Tower-17, Tower-18, Tower-19, Tower-20, Tower-21, Tower-22, Tower-23, Tower-24, Tower-25, Tower-26, Tower-27, Tower-28 in AMBALA, HARYANA. Quantity: 5168. Submission Deadline: 17-07-2026 15: 00: 00. Download documents and apply online.

Advertisement

Authority & Contact

Department

Bhakra Beas Managemet Board

Office Name

Bhakra Beas Management Board, Chandigarh

Grievance Contact

[email protected]

Reverse Auction Schedule

Completed

Start

28-Oct-2026, 5:00 pm

End

30-Oct-2026, 5:00 pm

Duration: 48 hours

Reverse Auction Document

✅ RA concluded. Check financial results for final rankings.

Tender Data

Bid Details

Quantity

5168

Category

Tower-1

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

H1-Highest Priced Bid Elimination

Tech Clarification Time

3 Days

Preference & Exemptions

EMD Required

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

153

Past Performance

80 %

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

Civil-1 , Civil-2 , Civil-3 , Civil-4 , Civil-5 , Civil-6 , Civil-7 , Civil-8 , Civil-9 , Civil-10 , Tower-1 , Tower-2 , Tower-3 , Tower-4 , Tower-5 , Tower-6 , Tower-7 , Tower-8 , Tower-9 , Tower-10 , Tower-11 , Tower-12 , Tower-13 , Tower-14 , Tower-15 , Tower-16 , Tower-17 , Tower-18 , Tower-19 , Tower-20 , Tower-21 , Tower-22 , Tower-23 , Tower-24 , Tower-25 , Tower-26 , Tower-27 , Tower-28

Delivery Details

Max Delivery Days

150

Delivery Locations

1

Delivery Cities

Ambala

Delivery Pincodes

134007

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Ravinder xen400kvtldkt134007,400 KV T/L Division, BBMB, Dhulkote, Ambala City.AmbalaHaryana134007928150-

Authority Records

MINISTRY OF POWER

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9460530.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Advertisement

Bill of Quantities (BOQ) 38 Items Sign in for GEM prices

#1

Civil-1

Earth work in excavation of foundations of bridges culverts, buildings including handling of material with a combined lead of 15 metres dressing of bed and sides stacking the excavated soil from the edge of excavation and subsequent filling around a For ordinary gravel soil involving pick work L_R Ref no 6.7 a of Pb CSR2020

928 cum Delivery: 150 days
#2

Civil-2

Cement concrete 1_4_8 With stone aggregate 40mm gauge ii mixing by mechanical means using concrete mixer volumetric type T_R Ref no. 10.11 b ii of Pb CSR 2020

19 cum Delivery: 150 days
#3

Civil-3

Fixing, Leveling , Centering, Alignment and setting of stubs complete in all respect satisfaction of Engineer in Charge Lumsum N_S Item

1 job Delivery: 150 days
#4

Civil-4

Cold Twisted Deformed Ribbed_Tor steel Bar Bars Fe 500 grade as per IS _1786_2008 for RCC works, where not included in the complete rate of RCC including bending and placing in position in complete T_R Ref no. 18.18 of Pb CSR2020

127 qtl Delivery: 150 days
#5

Civil-5

Shuttering for Faces of concrete foundations and foundation beam and plinth beam (vertical or battering) Ref no. 9.1 of Pb CSR2020

34 sqm Delivery: 150 days
#6

Civil-6

Centering and shuttering for columns Square or rectangular or polygonal in plain Ref no. 9.4 of Pb CSR2020

68 sqm Delivery: 150 days
#7

Civil-7

Reinforced cement concrete M-20 mechanically batch mixed using batch type concrete mixer as by IS_1791 and vibrated by needle vibrate but excluding steel reinforcement centring and shuttering in foundation and plinth. Ref no. 10.15 of Pb CSR2020

111 cum Delivery: 150 days
#8

Civil-8

Extra for pumping charges of Batch Mix Concrete _Ready mix conrete work RMC Ref Pb CSR 2020 item no. 10.46

110 cum Delivery: 150 days
#9

Civil-9

Extra for using admixture in designed mix concrete Ref Pb CSR 2020 item no. 10.50

110 cum Delivery: 150 days
#10

Civil-10

Extra for carriage of RMC_batch mixed concrete with transit mixture beyond 1st km Ref Pb CSR 2020 item no. 10.47

110 cum per km Delivery: 150 days
#11

Tower-1

Design , testing, fabrication, Supply, Erection, Foundation of 220 KV Monpole PD 30degree-60degree BX__36M, M60-3000LG 8.8 GRADE Bolts with all parts like cross arms, bolts and nuts, step bolts, U bolts, D shackles etc Complete in all respect

1 no Delivery: 150 days
#12

Tower-2

Design , testing, fabrication, Supply, Erection including foundation of 220 KV Monpole PD 30degree_60degree BXA_24M , M56_2500LG 8.8 GRADE Bolts with all parts like cross arms, bolts and nuts, step bolts, U bolts, D shackles etc.complete in all respect.

1 no Delivery: 150 days
#13

Tower-3

CPRI Vetting Charges of Monopoles

1 job Delivery: 150 days
#14

Tower-4

Supply of Stubs of 220KV M_C Tower type NMD KRR Design Weight 1901.28KG HT and 720KG MS including GI Nuts and Bolts weight 39.36 Kg

1 no Delivery: 150 days
#15

Tower-5

Supply of Tower Body including Extension of 220KV M_C Tower type NMD plus 6 mtr. Extn. KRR Design Weight 18905.99 KG HT and 11081.5 KG MS ncluding GI Nuts and Bolts weight 1316.41 Kg

1 nos Delivery: 150 days
#16

Tower-6

Supply of Stub Template suitaible for 220KV M/C Tower type NMD plus 6 mtr. Extn. KRR Design Weight 1230.92 KG MS ncluding GI Nuts and Bolts weight 49.16 Kg

1 nos Delivery: 150 days
#17

Tower-7

Earthing Arrangement of Towers Complete in all respect

5 no Delivery: 150 days
#18

Tower-8

Danger Plate

3 no Delivery: 150 days
#19

Tower-9

Number plate

3 nos Delivery: 150 days
#20

Tower-10

Phase Plate set of 3

3 nos Delivery: 150 days
#21

Tower-11

Circuit Plate set of 2

3 nos Delivery: 150 days
#22

Tower-12

Anti climbing Device ACD with concertrina wire

3 nos Delivery: 150 days
#23

Tower-13

ACSR Conductor Zebra 0.4 sq inch Copper Eq.

2,550 mtr Delivery: 150 days
#24

Tower-14

Earth Wire 7_3.15mm

450 mtr Delivery: 150 days
#25

Tower-15

220KV 160KN Polymer string insulator

55 nos Delivery: 150 days
#26

Tower-16

Double Tension Hardware fittings for ACSR Zebra Conductor including Arcing Horns complete in all respect

15 nos Delivery: 150 days
#27

Tower-17

Single Tension Hardware fittings for ACSR Zebra Conductor including Arcing Horns complete in all respect

30 nos Delivery: 150 days
#28

Tower-18

Straight Joint for ACSR Zebra 0.4 sq. inch (Copper Eq.)

12 nos Delivery: 150 days
#29

Tower-19

Single Tension Hardware fitting suitaible for Earth Wire Size 7_3.15mm

8 nos Delivery: 150 days
#30

Tower-20

Straight Joint for Earth Wire Size 7_3.15mm

2 nos Delivery: 150 days
#31

Tower-21

Vibration Damper for ACSR Zebra 0.4 sq. inch (Copper Eq.)

75 nos Delivery: 150 days
#32

Tower-22

Vibration Damper for Earth Wire Size 7_3.15mm

15 nos Delivery: 150 days
#33

Tower-23

Bird Guard set of 3

6 nos Delivery: 150 days
#34

Tower-24

Ladder/Step bolts with washers.

300 nos Delivery: 150 days
#35

Tower-25

Form Box

1 set Delivery: 150 days
#36

Tower-26

Span marker_globules day marking sphere

3 nos Delivery: 150 days
#37

Tower-27

Erection of towers, stringing and sagging of Conductors, Earth Wire and accessories, including tack welding of bolts (about 750 bolts) Complete in all respect

1 job Delivery: 150 days
#38

Tower-28

Dismantlement of 02 towers including all necessary items and conductor including transportation of dismantled material from site to BBMB store Panipat.

1 job Delivery: 150 days

Categories 63

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria

6

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Advertisement