Bid Publish Date
19-Jul-2026, 2:29 pm
Bid End Date
03-Aug-2026, 1:00 pm
Location
Progress
Quantity
1
The LIC of India invites bids for hiring a New D.G. Set of 30 KVA CPCB-IV capacity at LIC premises in Bareilly, Uttar Pradesh 243001. The engagement spans a 36-month period with a total estimated value of ₹22,50,972.00 (including GST) based on a monthly rental for each unit. Payments are on a monthly basis, covering diesel and rental charges. The bidder must ensure a minimum running load of 90% of rated output with normal loading at 75% + 5% upward variation. Installation within LIC premises must occur within 30 days of award. Operator licensing and statutory compliance are mandatory, and any damage to LIC property during handling is contractor’s responsibility. Liquidity and performance will be monitored through standard LIC procedures.
DG set: 30 KVA, CPCB-IV compliant
Load requirement: minimum 90% of rated output
Normal loading: 75% + 5% upward variation
Maintenance: all spare parts, diesel, and Mobil oil replacement included
Installation: within 30 days of award; exhaust pipeline per authorities
Responsibilities: damages to LIC property borne by contractor
Warranty/AMC: not specified; ensure statutory compliance
36-month contract with monthly payments including diesel and rental
30-day installation window; LIC may cancel and forfeit EMD/SD on delay
Operator licensing and CPCB-IV compliance mandatory; site permissions at contractor cost
Monthly payments for each DG set over 36 months; inclusive of diesel and rental charges
Installation and commissioning within 30 days from awarding the contract
Cancellation and forfeiture of EMD/SD if installation is not completed within 30 days
Experience in supplying or hiring DG sets to government or LIC-like entities
Evidence of ability to obtain required licenses for operation
Financial capacity to sustain 36-month monthly payments
Tender Category
Service
Bid To RA
No
Advisory Bank
IDBI Bank
ePBG Percentage
3%
ePBG Duration (Months)
42
Delivery Locations
1
Delivery Cities
Bareilly
Delivery Pincodes
243005
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Arvind Kumar Maheshwari | 243005,LIC of India, Divisional office, DD Puram | Bareilly | Uttar Pradesh | 243005 | 1 | - | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
GST registration certificate
PAN card
Experience certificates for similar DG set hires
Financial statements demonstrating financial capability
EMD/Security deposit documents as per tender norms
Technical bid/documents proving CPCB-IV compliance
OEM authorization or vendor certifications (if applicable)
Licenses for operator (if required by authorities)
Key insights about UTTAR PRADESH tender market
Bidders must submit GST, PAN, financial statements, experience certificates, and EMD along with technical bid. Ensure CPCB-IV compliance, operator licensing if required, and installation within 30 days of award. GeM-based payment terms cover 36 months with monthly rental plus diesel.
Required documents include GST registration, PAN, experience certificates for DG set hires, financial statements, EMD/Security deposit, OEM authorization if applicable, CPCB-IV compliance certificates, and operator licensing proof where mandated by authorities.
The contractor must install and commission the new D.G. Set within 30 days of award. Delay may lead to cancellation and forfeiture of EMD/SD as per LIC terms; ensure exhaust piping and permits are secured at contractor cost.
The DG set must sustain a minimum load of 90% of rated output for emergency power. Normal loading is defined as 75% + 5% upward variation, with performance monitored by LIC standards.
Payments are monthly over a 36-month term, including diesel and rental charges. The total estimated value is ₹22,50,972.00 with GST, and payments are processed through GeM as per tender terms.
Bidders must meet CPCB-IV compliance for DG set operation and install exhaust piping per statutory authorities. Operator licensing may be required, and all statutory permissions must be obtained at contractor cost.
LIC reserves the right to cancel the order and forfeit the EMD/SD. Losses due to delays are recoverable from the vendor’s monthly bill; ensure readiness of installation site and permits before award.
Contractor bears all costs for maintenance, spares, diesel, oil replacements, and servicing. The DG set must remain in satisfactory running condition to supply emergency power as specified, with proper load handling.
Sign up now to access all documents
Main Document
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
GEM_GENERAL_TERMS_AND_CONDITIONS