Tender Overview
The opportunity is issued by the Indian Army under the Department Of Military Affairs for a bundle of LV7 components including TATA TIE ROD STEERING, LV7 T815 PADAL, LV7 T815 VOLTMETER, LV7 T815 FUEL GAUGE, LV7 T815 OIL PRESSURE GAUGE, ACC CABLE, BONET CABLE, HAND PUMP, and ORANGE BECON items. The scope comprises multiple LV7 categories tied to TATA/T815 platforms, with an inferred quantity-driven procurement and a potential 25% flex in order quantities. The buyerโs ATC requires preparation of a sample prior to bid submission, and material may be accepted or rejected at the buyerโs discretion. The contract will be governed by option-based delivery timelines and a need to demonstrate technical capability aligned to military procurement standards. Bidders should prepare for a robust, conformity-focused supply chain with documented turnover validation and past-performance evidence.
Technical Specifications & Requirements
- No explicit technical specs in the tender text; however, items listed include: TATA TIE ROD STEERING, LV7 T815 PADAL, LV7 T815 VOLTMETER, LV7 T815 FUEL GAUGE, LV7 T815 OIL PRESSURE GAUGE, ACC CABLE, BONET CABLE, LV7 T815 HAND PUMP, and LV7 T815 ORANGE BECON.
- BOQ reports 9 total items, with no quantities disclosed (N/A).
- ATC clause requires submission of a sample before bid end date.
- Additional buy-side flexibility: quantity may increase by up to 25% during contract execution at contracted rates.
- Experience proof may be accepted in multiple formats (contracts, invoices, execution certificates).
- No explicit delivery period is stated; option-based expiration defines delivery dynamics near contract finalization.
- No safety or ISO/IS standards are specified; bidders should prepare compliant documentation and past experience to meet military expectations.
Terms, Conditions & Eligibility
- EMD not specified within the provided data; bidders should verify exact amount in the official bid document.
- Turnover criteria: minimum average annual turnover for last three years must meet the value indicated in the bid document (with audited statements or CA certificate).
- Past Experience: submission may rely on contract copies, client execution certificates, or third-party notes as proof of service/supply against invoices.
- Delivery terms: option clause allows quantity expansion up to 25%, with delivery period adjustments calculated as (Increased quantity รท Original quantity) ร Original delivery period, with a minimum of 30 days.
- Sample submission is mandatory before bid end date; material acceptance is at the purchaserโs discretion.
- No explicit payment terms or warranty details in this extract; bidders should consult the full tender for penalties and LD clauses.