Progress
Brahmaputra Valley Fertilizer Corporation Limited invites bids for the supply of angle grinders to be delivered to the location in Dibrugarh, Assam. The scope is limited to the supply of goods (angle grinders) with an estimated value not disclosed. The tender includes an option clause allowing up to 25% quantity variation during or after the contract, at contracted rates. Bidders should prepare for delivery to the destination and ensure compliant packaging to protect items in transit. The procurement emphasizes clear documentation at supply, including user manuals and warranty certificates. The call for bids specifies that the entire bid price must be FOR Destination and inclusive of all taxes. A minimum delivery timeline is implied by the option clause, with a standard approach to accommodate quantity changes.
Quantity adjustment up to 25% with adjusted delivery period
FOR Destination pricing inclusive of taxes
30-day payment after receipt and site acceptance
Payment shall be made within 30 days of receipt and acceptance of materials at site.
Delivery period adjusts in proportion to quantity variation, with a minimum of 30 days when extended.
Not specified in the provided terms; bidders should seek clarification during bid submission.
No explicit eligibility criteria provided; bidders should request clarification
Must meet standard bidder requirements for government procurement
Submit products as angle grinders with compliance to packaging and warranty terms
Quantity
2
Bid Type
Single Packet Bid
Bid Validity
90 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
Bid Splitting Applied
No
Past Performance
20 %
Experience Required
2 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Angle grinder
Payment Timelines
Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
Dibrugarh
Delivery Pincodes
786623
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Pinaki Chakraborty | 786623,BRAHMAPUTRA VALLEY FERTILIZER CORPORATION LIMITED GROUND, 1, BVFCL, DHUDRA ALI, DILLIGHAT | Dibrugarh | Assam | 786623 | 2 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
User manual to be submitted with supply
Warranty certificates covering 06-month period from date of supply
Packing declaration ensuring transit safety
GST registration proof (if applicable to bidder)
PAN card (as part of bidder identification)
Technical compliance certificates (if any) for angle grinders
OEM authorisation (if bidding on OEM product)
Key insights about ASSAM tender market
Bidders should submit the unit price on a FOR Destination basis, include GST where applicable, provide a 06-month warranty certificate, and attach a user manual with the goods. Payment terms specify 30 days after receipt and site acceptance; prepare packing to prevent transit damage and be ready for quantity variation up to 25%.
Submit user manual with the goods, warranty certificates for 06 months, packing declaration, GST registration, PAN card, any OEM authorisation, and any technical compliance certificates. Emphasis on packaging and warranty documentation aligns with ATC requirements.
Bid pricing must be FOR Destination, inclusive of taxes. Delivery terms align with the option clause allowing up to 25% quantity variation, with corresponding delivery period adjustments, minimum 30 days extension if required.
The winning bidder must provide warranty certificates covering manufacturing defects and poor workmanship for 06 months from the date of supply, with documentation submitted at the time of supply.
Payment will be released within 30 days of receipt and acceptance of materials at site, provided all terms including warranty, packaging, and manuals are satisfied.
Yes, there is an option clause allowing up to 25% variation in bid quantity at contract award and during currency, with delivery time calculated as (additional quantity / original quantity) × original delivery period, minimum 30 days.