TenderDekho Logo
GEM

Procurement Opportunity: 415 V,200 A AC AND VENT PDB_SRR-UB AS PER NIT,415 V, 400 A AC AND VENT PDB_SS-112 AS PER NIT,415 V, in SAGAR, MADHYA PRADESH

Bid Publish Date

30-Jun-2026, 5:24 pm

Bid End Date

10-Jul-2026, 6:00 pm

Progress

Issue30-Jun-2026, 5:24 pm
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

49

Category

415 V, 400 A AC AND VENT PDB_SS-112 AS PER NIT

Bid Type

Two Packet Bid

Categories 7

Bharat Heavy Electricals Limited (bhel) announces a tender for 415 V, 200 A AC AND VENT PDB_SRR-UB AS PER NIT, 415 V, 400 A AC AND VENT PDB_SS-112 AS PER NIT, 415 V, 100 A AC SUB-PDB_SRR-UB AS PER NIT, 415 V, 160 A AC SUB- PDB_SS-112 AS PER NIT, 415 V, 63 A VENT WALL MOUNTED DB_SRR-UB AS PER NIT, 415 V, 100 A VENT WALL MOUNTED DB_SS-112 AS PER NIT, 415 V, 63 A AC-VENT WALL MOUNTED DB_SWAS ROOM AS PER NIT, 230 V, 32 A WALL MOUNTED DB_CCTV AS PER NIT, 415 V, 200 A SH PDB AS PER NIT, 110 V, 400 A DCDB-1 AS PER NIT, 110 V, 125 A DCDB-2 AS PER NIT, Local DOL Starters AS PER NIT, Commissioning Spares AS PER NIT, Tools and Tackles AS PER NIT, Mandatory Spares AS PER NIT, 16a_Lumpsum price for travel by LT Switchboards OEM to and from Site per visit_ 1Set is equals to 1 Visit_AS PER NIT, 16b_Lumpsum price including Lodging, Boarding etc for Services at Site for Supervision of E, T and C of SWBRDS by SWBRDS OEM_1 Set is equals to 6 Man-days_ AS PER NIT, 17a_Lumpsum price for travel by LT SWBRD OEM _ 1Set is equals to 1 Visit_AS PER NIT, 17b_Lumpsum price for Serv at Site for Mod or Addl Job on SWBRDS_ 1 Set is equals to 6 Mandays_ AS PER NIT, Training on LT SWGR at Vendor or OEMs Works AS PER NIT_1 set is equals to 5 Days in SAGAR, MADHYA PRADESH. Quantity: 49. Submission Deadline: 10-07-2026 18: 00: 00. Last date to apply is approaching fast!

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

415 V,200 A AC AND VENT PDB_SRR-UB AS PER NIT , 415 V, 400 A AC AND VENT PDB_SS-112 AS PER NIT , 415 V, 100 A AC SUB-PDB_SRR-UB AS PER NIT , 415 V, 160 A AC SUB- PDB_SS-112 AS PER NIT , 415 V, 63 A VENT WALL MOUNTED DB_SRR-UB AS PER NIT , 415 V, 100 A VENT WALL MOUNTED DB_SS-112 AS PER NIT , 415 V, 63 A AC-VENT WALL MOUNTED DB_SWAS ROOM AS PER NIT , 230 V, 32 A WALL MOUNTED DB_CCTV AS PER NIT , 415 V, 200 A SH PDB AS PER NIT , 110 V, 400 A DCDB-1 AS PER NIT , 110 V, 125 A DCDB-2 AS PER NIT , Local DOL Starters AS PER NIT , Commissioning Spares AS PER NIT , Tools and Tackles AS PER NIT , Mandatory Spares AS PER NIT , 16a_Lumpsum price for travel by LT Switchboards OEM to and from Site per visit_ 1Set is equals to 1 Visit_AS PER NIT , 16b_Lumpsum price including Lodging, Boarding etc for Services at Site for Supervision of E,T and C of SWBRDS by SWBRDS OEM_1 Set is equals to 6 Man-days_ AS PER NIT , 17a_Lumpsum price for travel by LT SWBRD OEM _ 1Set is equals to 1 Visit_AS PER NIT , 17b_Lumpsum price for Serv at Site for Mod or Addl Job on SWBRDS_ 1 Set is equals to 6 Mandays_ AS PER NIT , Training on LT SWGR at Vendor or OEMs Works AS PER NIT_1 set is equals to 5 Days

Authority Records

MINISTRY OF HEAVY INDUSTRIESHEAVY INDUSTRY DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 6

GeM-Bidding-9539480.pdf

Main Document

Other Documents

OTHER

Other Documents

OTHER

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 20 Items Sign in for GEM prices

#1

415 V,200 A AC AND VENT PDB_SRR-UB AS PER NIT

PY9755611010

1 no Delivery: 210 days
#2

415 V, 400 A AC AND VENT PDB_SS-112 AS PER NIT

PY9755611029

1 no Delivery: 210 days
#3

415 V, 100 A AC SUB-PDB_SRR-UB AS PER NIT

PY9755611037

1 no Delivery: 210 days
#4

415 V, 160 A AC SUB-PDB_SS-112 AS PER NIT

PY9755611045

1 no Delivery: 210 days
#5

415 V, 63 A VENT WALL MOUNTED DB_SRR-UB AS PER NIT

PY9755611053

1 no Delivery: 210 days
#6

415 V, 100 A VENT WALL MOUNTED DB_SS-112 AS PER NIT

PY9755611061

1 no Delivery: 210 days
#7

415 V, 63 A AC-VENT WALL MOUNTED DB_SWAS ROOM AS PER NIT

PY9755611185

1 no Delivery: 210 days
#8

230 V, 32 A WALL MOUNTED DB_CCTV AS PER NIT

PY9755611193

1 no Delivery: 210 days
#9

415 V, 200 A SH PDB AS PER NIT

PY9755611070

1 no Delivery: 210 days
#10

110 V, 400 A DCDB-1 AS PER NIT

PY9755611088

1 no Delivery: 210 days
#11

110 V, 125 A DCDB-2 AS PER NIT

PY9755611096

1 no Delivery: 210 days
#12

Local DOL Starters AS PER NIT

PY9755611207

30 nos Delivery: 210 days
#13

Commissioning Spares AS PER NIT

PY9755611100

1 set Delivery: 210 days
#14

Tools and Tackles AS PER NIT

PY9755611118

1 set Delivery: 210 days
#15

Mandatory Spares AS PER NIT

PY9755611126

1 set Delivery: 210 days
#16

16a_Lumpsum price for travel by LT Switchboards OEM to and from Site per visit_ 1Set is equals to 1 Visit_AS PER NIT

PY9755611134

1 set Delivery: 210 days
#17

16b_Lumpsum price including Lodging, Boarding etc for Services at Site for Supervision of E,T and C of SWBRDS by SWBRDS OEM_1 Set is equals to 6 Man-days_ AS PER NIT

PY9755611142

1 set Delivery: 210 days
#18

17a_Lumpsum price for travel by LT SWBRD OEM _ 1Set is equals to 1 Visit_AS PER NIT

PY9755611150

1 set Delivery: 210 days
#19

17b_Lumpsum price for Serv at Site for Mod or Addl Job on SWBRDS_ 1 Set is equals to 6 Mandays_ AS PER NIT

PY9755611169

1 set Delivery: 210 days
#20

Training on LT SWGR at Vendor or OEMs Works AS PER NIT_1 set is equals to 5 Days

PY9755611177

1 set Delivery: 210 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

Additional Doc 1 (Requested in ATC)

6

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

7

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer