Indian Army Department Of Military Affairs Goods Supply Tender 2026 - ISO 9001 & EMD ₹36,922 - Multiple Electrical & Hardware Items

Bid Publish Date

23-Sep-2026, 10:20 am

Bid End Date

03-Oct-2026, 11:00 am

EMD

₹36,922

Progress

RA
Issue23-Sep-2026, 10:20 am
Reverse Auction16-Oct-2026, 8:00 pm
AwardPending

Key Highlights

  • • ISO 9001 certification required for bidder or OEM of offered products
  • • Material Test Certificate mandatory with supply; buyer’s lab results govern acceptance
  • • Advance sample Approval: 10 days post-award; modifications list within 10 days
  • • EMD amount: ₹36,922; Banker’s cheque payment option indicated

Tender Overview

The Indian Army, Department Of Military Affairs, invites bids for the supply of a broad range of electrical hardware and related items, including switches, cables, lighting components, MCBs, wall/ceiling fittings, cables, and LED units, for government use in India. Estimated EMD is ₹36,922, and the scope is strictly delivery of goods (no services). Bidder must demonstrate ISO 9001 certification or be an OEM with requisite quality credentials. The tender emphasizes material test certificates and advance sample approvals, with potential bulk supply post-approval. The BoQ lists 70 items, spanning switchgear, conduits, lighting, and wiring accessories. A unique bid-clause involves buyer-approved advance samples and potential re-sampling if deviations occur. The procurement targets standardization across electrical components for military infrastructure, with a focus on reliability and traceability. Key differentiators include mandatory sample testing, and a lab-based acceptance regime.

Technical Specifications & Requirements

  • Scope: Only supply of goods (no installation or services).
  • EMD: ₹36,922.
  • Documentation: ISO 9001 certification for bidder or OEM; Material Test Certificate to accompany supply.
  • Quality control: Buyer's lab will test materials; lab results are decisive for acceptance.
  • Sample process: Advance samples due within 10 days of contract award; modifications and final approval follow within 10 days; bulk supply must align to approved sample.
  • Turnover/eligibility: Three-year average turnover requirement as per bid document; audited statements or CA certificate to be uploaded.
  • Item scope: Electrical hardware categories including switches, MCBs, cables (XLPE and PVC), conduits, LED bulbs, tubes, and related fittings; 70 total items listed in BOQ.
  • Standards: ISO 9001 certification; IS/IEC-related item standards may be implicit.
  • Delivery/terms: Supply-only contract with payment and delivery terms per formal contract; penalties/LDs not explicitly stated here.

Terms, Conditions & Eligibility

  • Turnover criterion: Average annual turnover in last 3 financial years, or post-incorporation turnover for younger bidders, as specified in the bid document.
  • Documentation: Upload ISO 9001 certificate; provide Material Test Certificate with each supply; submit audited financials or CA/cost accountant turnover statement.
  • Sample/approval: Advance sample submission within 10 days of contract award; approval or modification list issued within 10 days; bulk supply to follow approved sample.
  • Payment terms: Not specified in available data; contract terms to be finalized in the purchase order.
  • EMD/PBG: EMD amount ₹36,922; mechanism per bid terms (Banker’s Cheque option noted in terms).
  • Certifications: ISO 9001 mandatory; OEMs may need supporting authorization.
  • Penalties: Liquidated damages or penalties not explicitly described in data; contract may include standard govt. terms.
  • Sample failure: Major deviations may trigger fresh samples or contract termination after notifying deviations.

Key Specifications

  • Scope of supply: Goods only, no installation

  • EMD amount: ₹36,922

  • Material Test Certificate to accompany each shipment

  • Advance sample process: 10 days for submission; 10 days for approval/modifications

  • Quality acceptance: Buyer’s lab results determine acceptance

  • Turnover evidence: 3-year average turnover or post-incorporation turnover

  • Items: 70 electrical hardware components (switches, MCBs, cables, lighting, fittings)

Terms & Conditions

  • ISO 9001 certification mandatory for bidders or OEMs

  • Material Test Certificate required with supply

  • Advance sample approval timeline of 10 days post-award

Important Clauses

Payment Terms

Not explicitly stated in data; contract will specify payment terms in PO; EMD submitted via ₹36,922 option

Delivery Schedule

Delivery aligned to approved sample; bulk supply begins after approval; no LD for Buyer-delays in sample approval period

Penalties/Liquidated Damages

Not detailed here; standard govt terms likely apply; LDs to be defined in contract

Bidder Eligibility

  • Three-year average annual turnover criterion (or post-incorporation turnover for young bidders)

  • ISO 9001 certification (bidder or OEM)

  • Material Test Certificate requirement with every shipment

Advertisement

Authority & Contact

Organization

Indian Army

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Reverse Auction Schedule

Live

Start

16-Oct-2026, 8:00 pm

End

17-Oct-2026, 8:00 pm

Duration: 24 hours

Reverse Auction Document

🔴 RA is live! Log in to the portal to participate.

Tender Data

Bid Details

Quantity

7190

Category

Change over switch 100 Amp 4 pole

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

50% Lowest Priced Technically Qualified Bidders

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Past Performance

50 %

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

Angle Holder , Batten holder , Pendent holder , Bed Switch , Extension cord , Wall Mounted , Ceiling Rose , Tube light 20W , Tube light 9W , S S Comb 5 Amp , S S Comb 15 Amp , Switch Piano 5 AMP , Insulation Tape , PVC casing capping 25x16mm 3M long , LED Inverter rechargable bulb 10W , LED Inverter rechargable tube light 10W , LED Inverter rechargable tube light 20W , Switch Piano 15 Amp , Change over switch 32 Amp 4 pole , Change over switch 63 Amp 4 pole , Change over switch 100 Amp 4 pole , Exhaust Fan 300mm , Gang box 3 switch 5 Amp , Gang Box 4 Switch 5 Amp , Gang Box 8 Way , Bulk Head Fitting Bulb 14W , LED Bulb 9 or 10W , LED Bulb 12 or 15W , LED Bulb 18 or 20W , LED Rechargeable Bulb 20W , Modular switch 15 or 16 Amp , Modular switch 5 or 6 Amp , Modular switch power socket 5 or 15 Comb , Modular switch socket comb 5 or 6 Amp , Modular switch socket comb 15 or 16 Amp , Plug 3 or 5 pin 15 or 16 Amp , Plug 3 or 5 pin 5 or 6 Amp , Piano Switch 5 or 6 Amp , Piano Switch 15 or 16 Amp , PVC switch Bd 8 inch x 10 inch , PVC switch Bd 4 inch x 6 inch , Socket 3 pin 5 or 6 Amp , Socket 5 pin 15 or 16 Amp , Electric rod 2000 Wt , PVC aluminium wire 10 Sqm 2 Core , PVC copper cable 1 Sqmm single core , PVC copper cable 1.5 Sqmm single core , PVC copper cable 2.5 Sqmm single core , PVC copper cable 1.5 Sqmm twin core , PVC copper cable 4.00 Sqmm twin core , PVC copper cable 6.00 Sqmm twin core , Smoke alarm , XLPE Armd Cable 6 Sqmm 2 Core , XLPE Armd Cable 10 Sqmm 2 Core , XLPE Armd Cable 16 Sqmm 2 Core , XLPE Insulated cable 10 Sqmm 2 core , XLPE insulated cable 25 Sqmm 3.5 core , Copper Wire Flexible , Flexible wire copper conductor twin core , MCB 6 Amp SP , MCB 10 Amp SP , MCB 16 Amp SP , MCB 32 AMP SP , MCB 63 Amp SP , MCB 32 AMP DP , MCB 63 Amp DP , MCB box 6 way , MCB distribution board 4 way , MCB distribution board 6 way , MCB distribution board 8 way

Advisory Bank

State Bank of India

ePBG Percentage

3%

ePBG Duration (Months)

12

Delivery Details

Max Delivery Days

30

Delivery Locations

1

Delivery Cities

Allahabad

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-AllahabadAllahabad--5530-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENTINDIAN ARMY

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9932473.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Advertisement

Bill of Quantities (BOQ) 70 Items Sign in for GEM prices

#1

Angle Holder

Angle Holder

55 nos Delivery: 30 days
#2

Batten holder

Batten holder

15 nos Delivery: 30 days
#3

Pendent holder

Pendent holder

20 nos Delivery: 30 days
#4

Bed Switch

Bed Switch

36 nos Delivery: 30 days
#5

Extension cord

Extension cord powerstrip 4 way

11 nos Delivery: 30 days
#6

Wall Mounted

Wall Mounted fan 450mm

21 nos Delivery: 30 days
#7

Ceiling Rose

PVC Ceiling Rose

43 nos Delivery: 30 days
#8

Tube light 20W

Tube light 20W LED 4 ft long

238 nos Delivery: 30 days
#9

Tube light 9W

Tube light 9W LED 2 ft long

140 nos Delivery: 30 days
#10

S S Comb 5 Amp

S S Comb 5 Amp

20 nos Delivery: 30 days
#11

S S Comb 15 Amp

S S Comb 15 Amp

20 nos Delivery: 30 days
#12

Switch Piano 5 AMP

Switch Piano 5 AMP

30 nos Delivery: 30 days
#13

Insulation Tape

Insulation Tape

60 nos Delivery: 30 days
#14

PVC casing capping 25x16mm 3M long

PVC casing capping 25x16mm 3M long

181 nos Delivery: 30 days
#15

LED Inverter rechargable bulb 10W

LED Inverter rechargable bulb 10W

16 nos Delivery: 30 days
#16

LED Inverter rechargable tube light 10W

LED Inverter rechargable tube light 10W

8 nos Delivery: 30 days
#17

LED Inverter rechargable tube light 20W

LED Inverter rechargable tube light 20W

31 nos Delivery: 30 days
#18

Switch Piano 15 Amp

Switch Piano 15 Amp

45 nos Delivery: 30 days
#19

Change over switch 32 Amp 4 pole

Change over switch 32 Amp 4 pole

3 nos Delivery: 30 days
#20

Change over switch 63 Amp 4 pole

Change over switch 63 Amp 4 pole

2 nos Delivery: 30 days
#21

Change over switch 100 Amp 4 pole

Change over switch 100 Amp 4 pole

7 nos Delivery: 30 days
#22

Exhaust Fan 300mm

Exhaust Fan 300mm

5 nos Delivery: 30 days
#23

Gang box 3 switch 5 Amp

Gang box 3 switch 5 Amp

3 nos Delivery: 30 days
#24

Gang Box 4 Switch 5 Amp

Gang Box 4 Switch 5 Amp

3 nos Delivery: 30 days
#25

Gang Box 8 Way

Gang Box 8 Way

8 nos Delivery: 30 days
#26

Bulk Head Fitting Bulb 14W

Bulk Head Fitting Bulb 14W

61 nos Delivery: 30 days
#27

LED Bulb 9 or 10W

LED Bulb 9 or 10W

223 nos Delivery: 30 days
#28

LED Bulb 12 or 15W

LED Bulb 12 or 15W

150 nos Delivery: 30 days
#29

LED Bulb 18 or 20W

LED Bulb 18 or 20W

10 nos Delivery: 30 days
#30

LED Rechargeable Bulb 20W

LED Rechargeable Bulb 20W

5 nos Delivery: 30 days
#31

Modular switch 15 or 16 Amp

Modular switch 15 or 16 Amp

56 nos Delivery: 30 days
#32

Modular switch 5 or 6 Amp

Modular switch 5 or 6 Amp

138 nos Delivery: 30 days
#33

Modular switch power socket 5 or 15 Comb

Modular switch power socket 5 or 15 Comb

6 nos Delivery: 30 days
#34

Modular switch socket comb 5 or 6 Amp

Modular switch socket comb 5 or 6 Amp

68 nos Delivery: 30 days
#35

Modular switch socket comb 15 or 16 Amp

Modular switch socket comb 15 or 16 Amp

51 nos Delivery: 30 days
#36

Plug 3 or 5 pin 15 or 16 Amp

Plug 3 or 5 pin 15 or 16 Amp

36 nos Delivery: 30 days
#37

Plug 3 or 5 pin 5 or 6 Amp

Plug 3 or 5 pin 5 or 6 Amp

42 nos Delivery: 30 days
#38

Piano Switch 5 or 6 Amp

Piano Switch 5 or 6 Amp

55 nos Delivery: 30 days
#39

Piano Switch 15 or 16 Amp

Piano Switch 15 or 16 Amp

56 nos Delivery: 30 days
#40

PVC switch Bd 8 inch x 10 inch

PVC switch Bd 8 inch x 10 inch

11 nos Delivery: 30 days
#41

PVC switch Bd 4 inch x 6 inch

PVC switch Bd 4 inch x 6 inch

16 nos Delivery: 30 days
#42

Socket 3 pin 5 or 6 Amp

Socket 3 pin 5 or 6 Amp

55 nos Delivery: 30 days
#43

Socket 5 pin 15 or 16 Amp

Socket 5 pin 15 or 16 Amp

37 nos Delivery: 30 days
#44

Electric rod 2000 Wt

Electric rod 2000 Wt

22 nos Delivery: 30 days
#45

PVC aluminium wire 10 Sqm 2 Core

PVC aluminium wire 10 Sqm 2 Core

80 rm Delivery: 30 days
#46

PVC copper cable 1 Sqmm single core

PVC copper copper conductor cable 1100V 1 Sqmm single core

250 rm Delivery: 30 days
#47

PVC copper cable 1.5 Sqmm single core

PVC copper copper conductor cable1100V 1.5 Sqmm single core

1,490 rm Delivery: 30 days
#48

PVC copper cable 2.5 Sqmm single core

PVC copper copper conductor cable1100V 2.5 Sqmm single core

1,270 rm Delivery: 30 days
#49

PVC copper cable 1.5 Sqmm twin core

PVC copper copper conductor cable1100V 1.5 Sqmm twin core

450 rm Delivery: 30 days
#50

PVC copper cable 4.00 Sqmm twin core

PVC copper copper conductor cable1100V 4.00 Sqmm twin core

100 rm Delivery: 30 days
#51

PVC copper cable 6.00 Sqmm twin core

PVC copper copper conductor cable1100V 6.00 Sqmm twin core

100 rm Delivery: 30 days
#52

Smoke alarm

Smoke alarm

50 nos Delivery: 30 days
#53

XLPE Armd Cable 6 Sqmm 2 Core

XLPE Heavy duty Armd Cable 6 Sqmm 2 Core

190 rm Delivery: 30 days
#54

XLPE Armd Cable 10 Sqmm 2 Core

XLPE Heavy duty Armd Cable 10 Sqmm 2 Core

290 rm Delivery: 30 days
#55

XLPE Armd Cable 16 Sqmm 2 Core

XLPE Heavy duty Armd Cable 16 Sqmm 2 Core

190 rm Delivery: 30 days
#56

XLPE Insulated cable 10 Sqmm 2 core

XLPE Insulated cable 10 Sqmm 2 core

100 rm Delivery: 30 days
#57

XLPE insulated cable 25 Sqmm 3.5 core

XLPE insulated cable 25 Sqmm 3.5 core

50 rm Delivery: 30 days
#58

Copper Wire Flexible

Copper Wire Flexible

250 rm Delivery: 30 days
#59

Flexible wire copper conductor twin core

Flexible wire copper conductor twin core

22 bdl Delivery: 30 days
#60

MCB 6 Amp SP

MCB 6 Amp SP

71 nos Delivery: 30 days
#61

MCB 10 Amp SP

MCB 10 Amp SP

20 nos Delivery: 30 days
#62

MCB 16 Amp SP

MCB 16 Amp SP

28 nos Delivery: 30 days
#63

MCB 32 AMP SP

MCB 32 AMP SP

8 nos Delivery: 30 days
#64

MCB 63 Amp SP

MCB 63 Amp SP

1 nos Delivery: 30 days
#65

MCB 32 AMP DP

MCB 32 AMP DP

16 nos Delivery: 30 days
#66

MCB 63 Amp DP

MCB 63 Amp DP

15 nos Delivery: 30 days
#67

MCB box 6 way

MCB box 6 way

4 nos Delivery: 30 days
#68

MCB distribution board 4 way

MCB distribution board 4 way

10 nos Delivery: 30 days
#69

MCB distribution board 6 way

MCB distribution board 6 way

9 nos Delivery: 30 days
#70

MCB distribution board 8 way

MCB distribution board 8 way

7 nos Delivery: 30 days

Categories 71

Required Documents

1

GST certificate

2

PAN card

3

Audited financial statements or CA/Cost Accountant turnover certificate (3-year average)

4

ISO 9001 certificate (bidder or OEM)

5

Material Test Certificate for delivered items

6

Advance sample submission and approval documentation

7

OEM authorization or manufacturer certificate (if applicable)

8

Technical bid documents and any ATC/corrigendum compliance

9

EMD payment proof (₹36,922) or Banker’s Cheque

Frequently Asked Questions

Key insights about UTTAR PRADESH tender market

How to bid for electrical hardware tender in India Army 2026

Bidders must meet turnover criteria, provide ISO 9001 certification, and attach Material Test Certificate with every shipment. Submit GST, PAN, audited financials, and OEM authorizations. Include EMD ₹36,922 and ensure advance sample submitted within 10 days of award; await approval before bulk supply.

What documents are required for Indian Army electrical tender 2026

Required documents include GST certificate, PAN, audited financial statements or CA turnover, ISO 9001 certificate (bidder or OEM), Material Test Certificate, OEM authorization (if applicable), and EMD submission proof. Also include advance sample submission and any corrigendum compliance.

What are the technical specifications for electrical items in this bid

The bid covers 70 electrical items such as switches, MCBs (6A–63A SP/DP), PVC/XLPE cables, LED bulbs and tubes, ceiling rose, wall/plastic fittings, and distribution boards. Exact model numbers not specified; compliance with ISO 9001 and material testing is required.

When is the advance sample submission deadline for this tender

Advance samples must be submitted within 10 days of contract award; the buyer will respond with approval or a modification list within another 10 days. If approval delays occur, the delivery period may be reset without LDs for the delay.

What is the EMD amount for this Indian Army procurement

EMD is ₹36,922. Bidder may submit via Banker’s Cheque as per terms; ensure EMD documents are attached with the bid. This amount serves as security for the performance and bid commitment in the goods-only supply contract.

What are the eligibility criteria for turnover in this tender

Bidders must show a three-year average annual turnover as per the bid document, documented via audited balance sheets or CA/cost accountant certificate. If the bidder is under three years old, turnover is calculated from completed financial years after incorporation.

What standards or certifications are required for this supply

Mandatory ISO 9001 certification for the bidder or the offered product OEM. In addition, a Material Test Certificate must accompany each supply, and the buyer reserves the right to test items in its lab to determine acceptance.

What is the scope of supply for this Army tender in 2026

The scope is strictly the supply of goods only, covering 70 electrical hardware items including switches, cables, MCBs, lighting fittings, and distribution components; no installation or after-sales service is stated in the current data.

Advertisement