Supply of S. B. D. valve of POL Tank Wagon - 733 as per specification.
North East Frontier Railway
JALPAIGURI, WEST BENGAL
Bid Publish Date
29-Dec-2025, 6:06 pm
Bid End Date
19-Jan-2026, 12:00 pm
Location
Progress
Quantity
2
Category
MR S. No. 1.0001: Supply of Tank Farm Management System
Bid Type
Two Packet Bid
Engineers India Limited invites bids for the Tank Farm Management System and adjacent Site Work at the BIO ATF PLANT of MANGALORE REFINERY, located in DAKSHINA KANNADA, KARNATAKA – 574109. The scope includes the supply and installation of the Tank Farm Management System and associated site works with inspection by an EIL-approved TPI Agency. Bidders must quote on a FOT Site basis (including freight and all taxes/duties, with GST rate clearly indicated in Form-A) and will bear no TPI charges. The procurement emphasizes CPBG and SBMS/SFMS-based guarantees and mandatory documentation as per bidding doc. A CPBG mechanism and SBI-based interest on advances are specified, with charges to bidder accounts if CPBG is not furnished. The project is linked to the Mangalore Refinery and Petrochemicals Limited (MRPL) context.
Tank Farm Management System for MRPL project scope
EIL-approved TPI inspection; charges borne by EIL/Owner
Prices on FOT Site basis including freight and GST; GST rate disclosed in Form-A
Mandatory 2-year O&M spares and unit rates for additions/deletions
CPBG facility with SFMS routing option for bank guarantees
No BOQ items provided; project-specific delivery and installation requirements
CPBG and SFMS bank guarantees are required
Inspection by EIL-approved TPI agency with owner-borne charges
FOT Site pricing with GST clearly indicated in Form-A
Submission of 2-year O&M spare rates and addition/deletion unit rates
Compliance with Bidding Document terms superseding GeM GTC
All relevant documents must be provided to avoid bid rejection
Prices on FOT Site basis; GST and freight percentage must be shown in Form-A; CPBG/ABG as per SPC; SBI base rate + 1% interest if CPBG not furnished
Delivery/installation timeline to be as per MR and P.O. terms; inspection to be conducted by EIL-approved TPI agency
Not explicitly stated; CPBG recovery through invoices for milestone payments if CPBG not provided
Experience in supplying or implementing Tank Farm Management or related process systems
Compliance with SB I-based financial guarantees and SFMS routing for guarantees
Capability to provide on-site installation and EIL-approved TPI inspection
North East Frontier Railway
JALPAIGURI, WEST BENGAL
Indian Oil Corporation Limited
PANIPAT, HARYANA
Engineers India Limited
DAKSHINA KANNADA, KARNATAKA
Iisco Steel Plant
BARDHAMAN, WEST BENGAL
Hindustan Petroleum Corporation Ltd
MUMBAI, MAHARASHTRA
Tender Results
Loading results...
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar Tank Farm Management System projects
Financial statements and bank statements
Earnest Money Deposit (EMD) submission proof or CPBG
Technical bid documents and conformity certificates
OEM authorization/brand certification if applicable
Any other documents listed in the bidding document's Specifications section
Key insights about KARNATAKA tender market
Bidders must submit all documents per the bidding document, provide FOT Site prices including GST and freight in Form-A, and furnish CPBG with SFMS routing where applicable. Ensure EIL-approved TPI inspection readiness and complete 2-year O&M spare rate schedules in the finance folder on GeM.
Required documents include GST certificate, PAN card,Experience certificates, financial statements, EMD/CPBG proof, technical bid documents, OEM authorizations if applicable, and any specific MR/Specifications documents uploaded by EIL. Ensure submission per the bidding document terms.
Inspection is conducted by an EIL-approved TPI Agency as per MR requirements; charges are borne by EIL/Owner. Bidders should not include TPI charges in quoted prices, and must align with inspection clauses in the bidding document.
A Contract Performance Bank Guarantee (CPBG) is applicable per the Bid Data Sheet. If CPBG is not submitted, the proportionate amount plus accrued interest will be deducted from milestone payments at the SBI base rate plus 1%.
Bid prices must be quoted on a FOT Site basis with GST and freight clearly indicated in Form-A (Salient Features of Offer). This ensures transparent pricing and compliance with procurement terms.
No BOQ items are listed in the available data; bidders must rely on project-specific specifications and MR terms. Emphasis on system integration, delivery, inspection, and compliance with the bidding document.
Scope includes site work for Tank Farm Management System installation alongside supply, with on-site delivery and installation requirements governed by MRPL-related terms and EIL bidding specifications.
Bidders should reference the bidding document for any required standards; the data shows emphasis on CPBG, SFMS guarantees, and EIL-approved inspection, with no explicit standards listed in the provided text.
Sign up now to access all documents
Main Document
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS