GEM

Government Tender Published for 12 U Network Racks,9 U Network Racks,48 Ports Layer 2 Access Switch,24 Ports Layer 2 Access Switch, in LUCKNOW, UTTAR PRADESH

Bid Publish Date

18-Nov-2025, 1:17 pm

Bid End Date

08-Dec-2025, 4:00 pm

EMD

₹2,64,000

Value

₹1,32,00,000

Latest Corrigendum Available

Progress

Issue18-Nov-2025, 1:17 pm
Corrigendum27-Nov-2025
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

22181

Category

Laying of Fiber cable using HDPE Pipe with Soft Soil Digging as per the specifications

Bid Type

Two Packet Bid

Categories 48

Public procurement opportunity for Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited (uprvunl) Lucknow 12 U Network Racks, 9 U Network Racks, 48 Ports Layer 2 Access Switch, 24 Ports Layer 2 Access Switch, 16 Ports Layer 2 Access Switch, 8 ports Layer 2 Access Switch, 1 KVA for 9U Racks, 2 KVA for 12U Racks, Single Mode 24 core Fibre cable, CAT6a Ethernet Cable, Fully loaded 48 port Patch Panel, Fully loaded 24 port Patch Panel, Fully loaded 16 port Patch Panel, Fully loaded 8 port Patch Panel, 2 ports Faceplate with IO and Junction Box, 3 feet Patch cord, 1 feet Patch cord, Fully loaded 24 port LIU, Fully loaded 6 port LIU, Single Mode Fibre Patch cord, Fiber Pigtail LC, Structured Cabling, Laying of Fiber cable using HDPE Pipe with Soft Soil Digging as per the specifications, Laying of Fiber cable using HDPE Pipe with Hard Soil Digging as per the specifications, Laying of indoor Fiber cable using GI Pipe in LUCKNOW, UTTAR PRADESH. Quantity: 22181 issued by. Submission Deadline: 08-12-2025 16: 00: 00. View full details and respond.

Past Similar Tenders (Historical Results)

5 found

Core Switch,48 Port Switch,24 Port switch,8 port Switch,Firewall,Firewall,Access points,Fiber modul

Controller General Of Defence Accounts

HYDERABAD, TELANGANA

Posted: 10 July 2025
Closed: 9 August 2025
GEM

Smart Rack with 42U rack, cooling, Access Control,UTM Security Firewall,24 Port Layer 3 Managed Cor

Controller General Of Defence Accounts

ALLAHABAD, UTTAR PRADESH

Posted: 25 January 2025
Closed: 15 February 2025
GEM

Access Point,Layer3 10 GbE SFP Managed Switch,Wireless LAN Controller,24Port Gigabit Managed PoE Sw

Upid Web Portal - Irrigation Department

LUCKNOW, UTTAR PRADESH

Posted: 26 August 2025
Closed: 10 September 2025
GEM

24 Port Smart Managed Gigabit Layer 2 Switch with 4 Ports 10G SFP Ports,16 Port Smart Managed Gigab

Indian Army

JABALPUR, MADHYA PRADESH

Posted: 3 September 2025
Closed: 17 September 2025
GEM

Manage 24 Port Core Switch Support 10G SFP,Manage 48 Port Gigabyte Switch Support 10G 2 SFP,Manage

Controller General Of Defence Accounts

PUNE, MAHARASHTRA

Posted: 7 February 2025
Closed: 28 February 2025
GEM

Bill of Quantities (BOQ) 25 Items

Item # Title Description Quantity Unit Consignee Delivery (Days)
1 12 U Network Racks 12 U Network Racks 13 no buyer3.uprvunl.lko 180
2 9 U Network Racks 9 U Network Racks 13 no buyer3.uprvunl.lko 180
3 48 Ports Layer 2 Access Switch 48 Ports Layer 2 Access Switch 1 no buyer3.uprvunl.lko 180
4 24 Ports Layer 2 Access Switch 24 Ports Layer 2 Access Switch 8 no buyer3.uprvunl.lko 180
5 16 Ports Layer 2 Access Switch 16 Ports Layer 2 Access Switch 1 no buyer3.uprvunl.lko 180
6 8 ports Layer 2 Access Switch 8 ports Layer 2 Access Switch 15 no buyer3.uprvunl.lko 180
7 1 KVA for 9U Racks 1 KVA for 9U Racks 15 no buyer3.uprvunl.lko 180
8 2 KVA for 12U Racks 2 KVA for 12U Racks 13 no buyer3.uprvunl.lko 180
9 Single Mode 24 core Fibre cable Single Mode 24 core Fibre cable 7 km buyer3.uprvunl.lko 180
10 CAT6a Ethernet Cable CAT6a Ethernet Cable(305 meter box) 57 no buyer3.uprvunl.lko 180
11 Fully loaded 48 port Patch Panel Fully loaded 48 port Patch Panel 7 no buyer3.uprvunl.lko 180
12 Fully loaded 24 port Patch Panel Fully loaded 24 port Patch Panel 13 no buyer3.uprvunl.lko 180
13 Fully loaded 16 port Patch Panel Fully loaded 16 port Patch Panel 1 no buyer3.uprvunl.lko 180
14 Fully loaded 8 port Patch Panel Fully loaded 8 port Patch Panel 10 no buyer3.uprvunl.lko 180
15 2 ports Faceplate with IO and Junction Box 2 ports Faceplate with IO and Junction Box 476 no buyer3.uprvunl.lko 180
16 3 feet Patch cord 3 feet Patch cord 815 no buyer3.uprvunl.lko 180
17 1 feet Patch cord 1 feet Patch cord 662 no buyer3.uprvunl.lko 180
18 Fully loaded 24 port LIU Fully loaded 24 port LIU 8 no buyer3.uprvunl.lko 180
19 Fully loaded 6 port LIU Fully loaded 6 port LIU 17 no buyer3.uprvunl.lko 180
20 Single Mode Fibre Patch cord Single Mode Fibre Patch cord 62 no buyer3.uprvunl.lko 180
21 Fiber Pigtail LC Fiber Pigtail LC 302 no buyer3.uprvunl.lko 180
22 Structured Cabling Structured Cabling which includes laying of UTP cable along-with all necessary requirement such as Casing, Capping, Conduiting, Channeling as per site requirement and including all services such as I/O termination, Crimping, dressing, Installation and fixing of Rack panel, with all supporting components and accessories, Rack dressing, Ferruling etc 12,665 meters buyer3.uprvunl.lko 180
23 Laying of Fiber cable using HDPE Pipe with Soft Soil Digging as per the specifications Laying of Fiber cable using HDPE Pipe with Soft Soil Digging as per the specifications 3,100 meters buyer3.uprvunl.lko 180
24 Laying of Fiber cable using HDPE Pipe with Hard Soil Digging as per the specifications Laying of Fiber cable using HDPE Pipe with Hard Soil Digging as per the specifications 3,250 meters buyer3.uprvunl.lko 180
25 Laying of indoor Fiber cable using GI Pipe Laying of indoor Fiber cable using GI Pipe 650 meters buyer3.uprvunl.lko 180

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover *In case any bidder is seeking exemption from Experience / Turnover Criteria

7

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Corrigendum Updates

3 Updates
#1

Update

27-Nov-2025
#2

Update

27-Nov-2025
#3

Update

27-Nov-2025

Extended Deadline

08-Dec-2025, 4:00 pm

Opening Date

08-Dec-2025, 4:30 pm