TenderDekho Logo
Closed GEM

Government Tender Published for 12 U Network Racks,9 U Network Racks,48 Ports Layer 2 Access Switch,24 Ports Layer 2 Access Switch, in LUCKNOW, UTTAR PRADESH

Bid Publish Date

18-Nov-2025, 1:17 pm

Bid End Date

15-Dec-2025, 3:00 pm

EMD

₹2,64,000

Value

₹1,32,00,000

Generate Docs

Progress

Issue18-Nov-2025, 1:17 pm
Technical12-Mar-2025, 5:42 pm
Financial
Award25-Apr-2026, 1:59 pm
Explore all 4 tabs to view complete tender details

Quantity

22181

Category

Laying of Fiber cable using HDPE Pipe with Soft Soil Digging as per the specifications

Bid Type

Two Packet Bid

Categories 48

Public procurement opportunity for Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited (uprvunl) Lucknow 12 U Network Racks, 9 U Network Racks, 48 Ports Layer 2 Access Switch, 24 Ports Layer 2 Access Switch, 16 Ports Layer 2 Access Switch, 8 ports Layer 2 Access Switch, 1 KVA for 9U Racks, 2 KVA for 12U Racks, Single Mode 24 core Fibre cable, CAT6a Ethernet Cable, Fully loaded 48 port Patch Panel, Fully loaded 24 port Patch Panel, Fully loaded 16 port Patch Panel, Fully loaded 8 port Patch Panel, 2 ports Faceplate with IO and Junction Box, 3 feet Patch cord, 1 feet Patch cord, Fully loaded 24 port LIU, Fully loaded 6 port LIU, Single Mode Fibre Patch cord, Fiber Pigtail LC, Structured Cabling, Laying of Fiber cable using HDPE Pipe with Soft Soil Digging as per the specifications, Laying of Fiber cable using HDPE Pipe with Hard Soil Digging as per the specifications, Laying of indoor Fiber cable using GI Pipe in LUCKNOW, UTTAR PRADESH. Quantity: 22181 issued by. Submission Deadline: 15-12-2025 15: 00: 00. View full details and respond.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

12 U Network Racks , 9 U Network Racks , 48 Ports Layer 2 Access Switch , 24 Ports Layer 2 Access Switch , 16 Ports Layer 2 Access Switch , 8 ports Layer 2 Access Switch , 1 KVA for 9U Racks , 2 KVA for 12U Racks , Single Mode 24 core Fibre cable , CAT6a Ethernet Cable , Fully loaded 48 port Patch Panel , Fully loaded 24 port Patch Panel , Fully loaded 16 port Patch Panel , Fully loaded 8 port Patch Panel , 2 ports Faceplate with IO and Junction Box , 3 feet Patch cord , 1 feet Patch cord , Fully loaded 24 port LIU , Fully loaded 6 port LIU , Single Mode Fibre Patch cord , Fiber Pigtail LC , Structured Cabling , Laying of Fiber cable using HDPE Pipe with Soft Soil Digging as per the specifications , Laying of Fiber cable using HDPE Pipe with Hard Soil Digging as per the specifications , Laying of indoor Fiber cable using GI Pipe

Authority Records

ENERGY DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-8586261.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 25 Items Sign in for GEM prices

#1

12 U Network Racks

12 U Network Racks

13 no Delivery: 180 days
#2

9 U Network Racks

9 U Network Racks

13 no Delivery: 180 days
#3

48 Ports Layer 2 Access Switch

48 Ports Layer 2 Access Switch

1 no Delivery: 180 days
#4

24 Ports Layer 2 Access Switch

24 Ports Layer 2 Access Switch

8 no Delivery: 180 days
#5

16 Ports Layer 2 Access Switch

16 Ports Layer 2 Access Switch

1 no Delivery: 180 days
#6

8 ports Layer 2 Access Switch

8 ports Layer 2 Access Switch

15 no Delivery: 180 days
#7

1 KVA for 9U Racks

1 KVA for 9U Racks

15 no Delivery: 180 days
#8

2 KVA for 12U Racks

2 KVA for 12U Racks

13 no Delivery: 180 days
#9

Single Mode 24 core Fibre cable

Single Mode 24 core Fibre cable

7 km Delivery: 180 days
#10

CAT6a Ethernet Cable

CAT6a Ethernet Cable(305 meter box)

57 no Delivery: 180 days
#11

Fully loaded 48 port Patch Panel

Fully loaded 48 port Patch Panel

7 no Delivery: 180 days
#12

Fully loaded 24 port Patch Panel

Fully loaded 24 port Patch Panel

13 no Delivery: 180 days
#13

Fully loaded 16 port Patch Panel

Fully loaded 16 port Patch Panel

1 no Delivery: 180 days
#14

Fully loaded 8 port Patch Panel

Fully loaded 8 port Patch Panel

10 no Delivery: 180 days
#15

2 ports Faceplate with IO and Junction Box

2 ports Faceplate with IO and Junction Box

476 no Delivery: 180 days
#16

3 feet Patch cord

3 feet Patch cord

815 no Delivery: 180 days
#17

1 feet Patch cord

1 feet Patch cord

662 no Delivery: 180 days
#18

Fully loaded 24 port LIU

Fully loaded 24 port LIU

8 no Delivery: 180 days
#19

Fully loaded 6 port LIU

Fully loaded 6 port LIU

17 no Delivery: 180 days
#20

Single Mode Fibre Patch cord

Single Mode Fibre Patch cord

62 no Delivery: 180 days
#21

Fiber Pigtail LC

Fiber Pigtail LC

302 no Delivery: 180 days
#22

Structured Cabling

Structured Cabling which includes laying of UTP cable along-with all necessary requirement such as Casing, Capping, Conduiting, Channeling as per site requirement and including all services such as I/O termination, Crimping, dressing, Installation and fixing of Rack panel, with all supporting components and accessories, Rack dressing, Ferruling etc

12,665 meters Delivery: 180 days
#23

Laying of Fiber cable using HDPE Pipe with Soft Soil Digging as per the specifications

Laying of Fiber cable using HDPE Pipe with Soft Soil Digging as per the specifications

3,100 meters Delivery: 180 days
#24

Laying of Fiber cable using HDPE Pipe with Hard Soil Digging as per the specifications

Laying of Fiber cable using HDPE Pipe with Hard Soil Digging as per the specifications

3,250 meters Delivery: 180 days
#25

Laying of indoor Fiber cable using GI Pipe

Laying of indoor Fiber cable using GI Pipe

650 meters Delivery: 180 days

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover *In case any bidder is seeking exemption from Experience / Turnover Criteria

7

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Corrigendum Updates

4 Updates
#1

Update

08-Dec-2025

Extended Deadline

15-Dec-2025, 3:00 pm

Opening Date

15-Dec-2025, 3:30 pm

#2

Update

27-Nov-2025
#3

Update

27-Nov-2025
#4

Update

27-Nov-2025

Extended Deadline

08-Dec-2025, 4:00 pm

Opening Date

08-Dec-2025, 4:30 pm

Technical Results

S.No Seller Item Date Status
1
AAR ESS EXIM PRIVATE LIMITED   Under PMA
-03-12-2025 17:42:51
2
ACME DIGITEK SOLUTIONS PRIVATE LIMITED   Under PMA
-15-12-2025 14:27:01
3
EWIT INFOTECH   Under PMA
-25-11-2025 18:01:17
4
FOREVER ENGINEERING SYSTEMS PRIVATE LIMITED   Under PMA
-05-12-2025 16:36:00
5
SHAURYAPRABHATINFRATECH   Under PMA
-15-12-2025 14:31:34
6
SOUL IT NETWORKS LLP   Under PMA
-15-12-2025 14:10:18
7
SRM TECHSOL PRIVATE LIMITED   Under PMA
-08-12-2025 11:12:07

Financial Results

Rank Seller Price Item
L1
SOUL IT NETWORKS LLP   Under PMA
Item Categories : 12 U Network Racks,9 U Network Racks,48 Ports Layer 2 Access Switch,24 Ports Layer 2 Access Switch,
L2
SRM TECHSOL PRIVATE LIMITED   Under PMA
Item Categories : 12 U Network Racks,9 U Network Racks,48 Ports Layer 2 Access Switch,24 Ports Layer 2 Access Switch,
L3
ACME DIGITEK SOLUTIONS PRIVATE LIMITED   Under PMA
Item Categories : 12 U Network Racks,9 U Network Racks,48 Ports Layer 2 Access Switch,24 Ports Layer 2 Access Switch,
L4
SHAURYAPRABHATINFRATECH   Under PMA
Item Categories : 12 U Network Racks,9 U Network Racks,48 Ports Layer 2 Access Switch,24 Ports Layer 2 Access Switch,

Contract / Result Documents 1

Please sign in or create an account to view contract details and download result documents.