TenderDekho Logo
Closed GEM

Controller General Of Defence Accounts procurement of 84 MM RL MK III and related items in Ajmer Rajasthan 2026

Bid Publish Date

15-Aug-2026, 12:55 pm

Bid End Date

26-Aug-2026, 1:00 pm

Progress

Issue15-Aug-2026, 12:55 pm
AwardPending

Tender Overview

The opportunity is issued by the Controller General Of Defence Accounts under the Department Of Defence for procurement related to a range of 84 MM and 40 MM munitions and associated equipment (e.g., 84 MM RL MK III DRILL components, SMOKE, HE, ILL, PNS recticle patterns, SAKO SNIPER carts, dummy models) with BIM/recticle items listed in the BOQ. Location of execution is Ajmer, Rajasthan (305001). The scope emphasizes after-sales service readiness and OEM warranty support, with a 1-year warranty from final acceptance or after installation/completion testing, and requires OEM warranty certificates at delivery. The tender includes required vendor documentation for account setup (PAN, GSTIN, cancelled cheque, EFT mandate). No monetary value or explicit delivery timeline is provided in the available data, indicating a high-level procurement scope with multiple item categories.

  • Organization: Controller General Of Defence Accounts
  • Location: Ajmer, Rajasthan
  • Product category: munitions and related drill/recticle components with multiple sub-items
  • Est. value/EMD: Not specified
  • Key differentiator: mandatory OEM warranty and post-sales service network in India
  • Unique aspects: installation/testing requirements and service center details to be uploaded with bid

Technical Specifications & Requirements

  • Warranty: 1 year from final acceptance; OEM warranty certificates due at delivery
  • After-sales: Seller must have established Installation, Commissioning, Training, Troubleshooting and Maintenance service network in India
  • Service capability: Upload service centre locations near consignee destinations with bid
  • Documentation: PAN Card, GSTIN, Cancelled Cheque, EFT Mandate (certified by bank) required for vendor code creation
  • Items: 14 BOQ entries listed but exact quantities/specifications not provided in available data; items include 84 MM RL MK III variants, 40 MM MGL grenades and related dummy models, and SAKO/HL recticle patterns
  • Compliance: International/local procurement standards to be inferred; ensure OEM authorizations if required by ATC
  • Delivery/installation specifics: Not detailed in data; plan for coordination with consignee
  • Standards: Not explicitly specified in provided data; cross-check at ATC with tender documents

Terms, Conditions & Eligibility

  • Warranty: 1 year warranty; OEM certificates due at delivery; service network in India
  • Vendor code: Submit PAN, GSTIN, cancelled cheque, EFT mandate for vendor code creation
  • Documentation: Include OEM authorizations and technical compliance certificates per ATC
  • Payment terms: Not disclosed in data; verify in ATC before bid
  • EMD/Performance: Not specified in data; confirm with issuing authority
  • Delivery timelines: Not specified; confirm with consignee during bid stage
  • Liability: Indemnities and recall clauses not provided; verify in final tender documents

Key Specifications

  • Product names from title: 84 MM RL MK III (multiple drill/HE/smoke/ill/recticle patterns), 40 MM MGL drill grenades, SAKO SNIPER carts, dummy grenades/models, recticle patterns

  • Quantities: not disclosed in BOQ; 14 items listed but specific quantities not available

  • EMD: Not specified

  • Experience: Not specified

  • Quality/Standards: Not specified in data; OEM warranty required; ISI/ISO not explicitly mentioned

  • Delivery: Not specified; coordinate with consignee

Terms & Conditions

  • Warranty: 1 year from final acceptance with OEM warranty certificates at delivery

  • Documentation: PAN, GSTIN, cancelled cheque, EFT mandate required for vendor code creation

  • Post-sale support: Well-established Installation, Commissioning, Training, Troubleshooting and Maintenance service network in INDIA

Important Clauses

Payment Terms

Not specified in provided data; verify with Buyer ATC

Delivery Schedule

Not specified in provided data; require confirmation during bid stage

Penalties/Liquidated Damages

Not specified in provided data; verify in ATC terms

Bidder Eligibility

  • Must meet vendor code creation prerequisites with PAN, GSTIN, and EFT mandate

  • Must demonstrate OEM warranty support capability via service network in India

  • Provide service center locations near consignee destinations

Advertisement

Authority & Contact

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Tender Data

Bid Details

Quantity

17

Category

84 MM RL MK III Heat 751 Drill Rd

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

Yes

Startup Exemption/Relaxation

Yes

Bid Splitting Applied

No

Requirements

OEM Avg. Turnover

4

Past Performance

50 %

Warranty Period

1 years

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

84 MM RL MK III Heat 751 Drill Rd , 84 MM RL MK III HE 441 D Drill RD , 84 MM RL MK III SMOKE 469 C Drill RD , 84 MM RL MK III Hedp 502 Drill RD , 84 MM RL MK III ILL 545 C Drill RD , 40 M MGL Drill Grenade Heap , 40 MM MGL Drill Grenade SBRP , SAKO SNIPER Drill Carts , MMHG Dummy Grenade , 81 MM MOR HE Dummy Model , 51 MM MOR HE Dummy Model , 84 MM RL TDLS Recticle Pattern , 84 MM RL PNS Recticle Pattern , SAKO Sniper Recticle Pattern

Delivery Details

Max Delivery Days

15

Delivery Locations

1

Delivery Cities

Ajmer

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-AjmerAjmer--115-

Authority Records

MINISTRY OF DEFENCEDEFENCE DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9761267.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 14 Items Sign in for GEM prices

#1

84 MM RL MK III Heat 751 Drill Rd

84 MM RL MK III Heat 751 Drill Rd

1 nos Delivery: 15 days
#2

84 MM RL MK III HE 441 D Drill RD

84 MM RL MK III HE 441 D Drill RD

1 nos Delivery: 15 days
#3

84 MM RL MK III SMOKE 469 C Drill RD

84 MM RL MK III SMOKE 469 C Drill RD

1 nos Delivery: 15 days
#4

84 MM RL MK III Hedp 502 Drill RD

84 MM RL MK III Hedp 502 Drill RD

1 nos Delivery: 15 days
#5

84 MM RL MK III ILL 545 C Drill RD

84 MM RL MK III ILL 545 C Drill RD

1 nos Delivery: 15 days
#6

40 M MGL Drill Grenade Heap

40 M MGL Drill Grenade Heap

1 nos Delivery: 15 days
#7

40 MM MGL Drill Grenade SBRP

40 MM MGL Drill Grenade SBRP

1 nos Delivery: 15 days
#8

SAKO SNIPER Drill Carts

SAKO SNIPER Drill Carts

2 nos Delivery: 15 days
#9

MMHG Dummy Grenade

MMHG Dummy Grenade

1 nos Delivery: 15 days
#10

81 MM MOR HE Dummy Model

81 MM MOR HE Dummy Model

2 nos Delivery: 15 days
#11

51 MM MOR HE Dummy Model

51 MM MOR HE Dummy Model

2 nos Delivery: 15 days
#12

84 MM RL TDLS Recticle Pattern

84 MM RL TDLS Recticle Pattern

1 nos Delivery: 15 days
#13

84 MM RL PNS Recticle Pattern

84 MM RL PNS Recticle Pattern

1 nos Delivery: 15 days
#14

SAKO Sniper Recticle Pattern

SAKO Sniper Recticle Pattern

1 nos Delivery: 15 days
Advertisement

Categories 2

Required Documents

1

PAN Card

2

GSTIN

3

Cancelled Cheque

4

EFT Mandate (certified by Bank)

5

OEM authorization documents (if required by ATC)

6

OEM warranty certificates to be submitted at delivery

7

Service center details near consignee destinations

8

Technical bid documents and any OEM product compliance certificates as per ATC

Frequently Asked Questions

Key insights about RAJASTHAN tender market

How to bid in the CGDA Ajmer procurement for 84 MM RL MK III?

Bidders must submit PAN, GSTIN, cancelled cheque, and EFT mandate for vendor code creation. OEM warranty certificates are required at delivery, and service centers must be mapped near consignee locations. Confirm 1-year warranty coverage and post-installation support in India with the ATC.

What documents are required for this defence equipment tender in Ajmer?

Submit PAN card, GSTIN, cancelled cheque, EFT mandate certified by bank, OEM authorizations if applicable, OEM warranty certificates, and service center details. Include technical bid and compliance certificates as per ATC to participate in the 84 MM RL MK III procurement.

What are the technical specifications for the 84 MM RL MK III items?

Specific item quantities and detailed specs are not provided; the tender lists variants including HE, SMOKE, ILL, ROUT, and recticle patterns. Ensure alignment with OEM claims, provide recticle patterns, and verify IS/ISO standards if required in final ATC.

When is the delivery and payment timeline for this Ajmer tender?

Delivery schedule is not disclosed in the current data; payment terms are not specified and require confirmation in the ATC. Bidder should seek explicit delivery and payment terms during bid submission and contract finalization.

What is the EMD amount for CGDA defence equipment procurement in Rajasthan?

EMD details are not provided in the available tender data. Confirm EMD amount and payment method in the ATC and ensure compliance with submission deadlines and bid validity.

What post-sale support is required for the 84 MM RL MK III procurement?

A well-established Installation, Commissioning, Training, Troubleshooting and Maintenance service group in India is required. Upload service centers near consignee destinations with the bid and ensure 1-year warranty coverage from final acceptance.

Advertisement