Shelter Part,Main structure,Building Material,Hardware Mtrl,Electrical items,Lighting Protection,Ex
Indian Army
BIKANER, RAJASTHAN
Bid Publish Date
20-Feb-2026, 11:03 pm
Bid End Date
03-Mar-2026, 9:00 am
EMD
₹60,000
Value
₹30,00,000
Location
Progress
Quantity
28
Category
Shelter Part
Bid Type
Two Packet Bid
Scope includes Shelter Part, Furniture, DRG preparation, and 2 kVA solar installation
Delivery address: Leimakhong, Imphal, Manipur
Detailed Design Drawings submission due within 5 days of award; approval or modification list within 7 days
On-site installation/commissioning by OEM-certified personnel
3 years govt/PSU experience with supporting contracts
EMD amount is ₹60,000 and must accompany bid submission
Detailed Design Drawings must be submitted within 5 days and approved or modified within 7 days
Installation to be conducted at Leimakhong, Imphal, Manipur by OEM personnel
Not specified in data; clarify during bid submission and contract finalization
Delivery tied to approval of Detailed Design Drawings; delay in drawing approval shifts delivery timeline without LD
Not detailed; bidder should seek clarity on LD proportional to delays and performance gaps
3 years experience in manufacturing/supplying similar govt/PSU products
Ability to provide OEM authorization and OEM-certified installation resources
GST registered with valid PAN and bank EFT mandate
End User Certificate provided in buyer format
Main Document
BOQ
BOQ
ATC
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
BIKANER, RAJASTHAN
Indian Army
BIKANER, RAJASTHAN
Indian Army
BIKANER, RAJASTHAN
Indian Army
BIKANER, RAJASTHAN
Indian Army
JAMMU, JAMMU & KASHMIR
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | Shelter Part | Supply of Collapsible Man Pack Shelter 6 Men capacity assembled size 16 x8 x 10 feet detail technical specification appx A and Drg attach | 3 | nos | ketan.262h | 30 |
| 2 | Furniture | Provn of Double Sleeping Bunk as per tech specification given in Appx B | 9 | nos | ketan.262h | 30 |
| 3 | Furniture | Provn of Bed Side Locker as per tech specification Appx C | 9 | nos | ketan.262h | 30 |
| 4 | Prepration of Drg | Preparation of Project Drg in Autocad software for complete job | 1 | job | ketan.262h | 30 |
| 5 | Installtion | Installation and Transportation of complete all as specified and directed | 3 | nos | ketan.262h | 30 |
| 6 | 2 Kva Solar | Supply and installtion of 2kVA Solar inverter with in built in charge controller detailed specification is as attached | 3 | nos | ketan.262h | 30 |
Discover companies most likely to bid on this tender
PAN Card copy
GSTIN copy
Cancelled cheque copy
EFT Mandate copy certified by Bank
End User Certificate in Buyer format
OEM Authorization/Manufacturer Authorization (if applicable)
Evidence of 3 years govt/PSU supply experience (contracts/curchase orders)
Bidder code creation documents per T&C
Key insights about MANIPUR tender market
Bidders must meet 3-year govt/PSU supply experience, submit PAN, GSTIN, cancelled cheque and EFT mandate, plus OEM authorization if bidding via distributors. Provide Detailed Design Drawings within 5 days of award and obtain buyer approval within 7 days. End User Certificate in buyer format is required, and NDA must be uploaded.
Submit PAN & GSTIN copies, cancelled cheque, EFT mandate, End User Certificate in buyer format, OEM authorization if applicable, and evidence of 3 years govt/PSU experience with contracts. Include any bid code creation documents as per Terms and Conditions and site visit proof if availed.
Installation and commissioning must be performed by OEM-certified personnel or OEM-authorized resellers. Delivery site is DIV AOR Leimakhong, Imphal. Ensure drawings are approved before fabrication; delays in drawing approval shift delivery without LD penalties.
EMD is ₹60,000 and must accompany the bid. Payment terms to be confirmed; ensure deposit is submitted through the prescribed method with the bid submission package.
Bidder or OEM must demonstrate at least 3 years of regular manufacturing and supply of similar category products to a Central/State Govt or PSU, supported by contracts showing yearly quantities.
Submit Detailed Design Drawings within 5 days of award. The buyer will approve or provide a modification list within 7 days. If approval is delayed by the buyer, the delivery period is adjusted without LD for the delay.
Sign up now to access all documents
Main Document
BOQ
BOQ
ATC
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS