Progress
Product/service names: Online UPS with battery for 10 KVA
Standards: IS 16242 Part 1 compliance
Certifications: ISO 9001, BIS licence, type test certificates
Warranty: 3 years from final acceptance/installation
Service: Dedicated toll-free support; escalation matrix
Delivery: Option clause allowing up to 25% quantity variation
EMD not explicitly stated; expect typical govt tender deposits per ATC
Delivery period governed by original/extended order with 30-day minimum
Mandatory service centres or establishment within 30 days of award
Delivery period starts after last date of original delivery order; extended time adjusts proportionally with minimum 30 days
3-year warranty from final acceptance or post-installation; OEM warranty certificates required at delivery
Functional Service Centre in the consignee state; dedicated toll-free service; escalation matrix for service support
Must hold ISO 9001 certification (bidder or OEM)
Must have BIS licence and type test certificates for UPS equipment
Must demonstrate ability to establish service centre within 30 days if not existing
Must provide installation, commissioning, and testing capability
Quantity
2
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
RA Qualification Rule
H1-Highest Priced Bid Elimination
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
Yes
Bid Splitting Applied
No
Min. Avg. Annual Turnover
13
OEM Avg. Turnover
10
Past Performance
50 %
Warranty Period
3 years
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Online UPS (?10 KVA) With Battery Conforming To IS 16242 (Part 1) (Q2)
Max Delivery Days
30
Delivery Locations
1
Delivery Cities
KAMRUP
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | KAMRUP | KAMRUP | - | - | 2 | 30 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
GST registration certificate
PAN card
Experience certificates for similar UPS supply/installation
Financial statements or solvency certificate
EMD/Security deposit proof (as per ATC if applicable)
ISO 9001 certificate (bidder or OEM)
BIS licence and type test certificates
OEM authorization letter (if bidder is not OEM)
Technical bid documents and installation/maintenance plan
Evidence of functional service centre (within 30 days if not existing)
Key insights about ASSAM tender market
Bidders must meet ISO 9001 and BIS certification, provide type test certificates, and demonstrate a service Centre or capability to establish one within 30 days. Include installation/commissioning plan and 3-year warranty commitment; ensure IS 16242 Part 1 compliance for 10 KVA UPS with battery.
Submit GST, PAN, experience certificates for similar UPS, financial statements, EMD proof if applicable, ISO 9001, BIS licence, type test certificates, OEM authorisation, and installation/maintenance plan with service escalation details.
Delivery is governed by the option clause allowing up to 25% quantity variation; delivery period starts from last date of original order with minimum 30 days; if extended, time scales proportionally to quantity.
Mandatory certifications include ISO 9001 certification for bidder or OEM, BIS licence, and required type test certificates as per the product specification; ensure certificates are uploaded with bid.
The supplier must offer a 3-year warranty from final acceptance or after installation and testing; OEM warranty certificates must be supplied at delivery.
A dedicated toll-free service line and an escalation matrix must be provided; a functional service centre in the consignee state or establishment within 30 days post-award is required.
IS 16242 Part 1 specifies performance and safety requirements for standalone UPS systems with batteries; bidders must confirm conformity and provide documentation demonstrating compliance during submission.
The data does not specify dates; bidders should monitor the tender portal for the opening schedule, ensure all mandatory certificates are uploaded, and prepare to demonstrate installation capability and service support readiness.